In India, which one of the following should be considered the right combination of the age in days and live body
weight in kg for a lamb for its weaning ?
(A) 20 days to 30 days and 6 kg to 7 kg
(B) 45 days to 60 days and 8 kg to 10 kg
(C) 105 days to 120 days and 18 kg to 21 kg
(D) 75 days to 90 days and 12 kg to 15 kg
(E) 55 days to 70 days and 9 kg to 11 kg

1 Answer

Answer :

(C) 105 days to 120 days and 18 kg to 21 kg

Related questions

Description : 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50'. What number is missing? -Riddles

Last Answer : 22

Description : If 20 kg of coarse aggregate is sieved through 80 mm, 40 mm, 20 mm, 10 mm, 4.75 mm, 2.36 mm, 1.18 mm, 600 micron, 300 micron and 150 micron standard sieves and the weights retained are 0 kg, 2 kg, 8 kg, ... , the fineness modulus of the aggregate, is (A) 7.30 (B) 7.35 (C) 7.40 (D) 7.45

Last Answer : Answer: Option C

Description : Sub soilders are operated at maximum depth of (a) 30-40 cm (b) 45-75 cm (c) 75-90 cm (d) 10-20 cm

Last Answer : (b) 45-75 cm

Description : What is the intensity of sound in normal conversation? (a) 10-20 dB (b) 30-60 dB (c) 70-90 dB (d) 120-150 dB

Last Answer : b) 30-60 dB

Description : The distance between two cities A and B is 330 km. A train starts from A at 8 a.m. and travels towards B at 60 km/hr. Another train starts from B at 9 a.m. and travels towards A at 75 km/hr. At what time do they meet? A.10:30 am B.10:45 am C.11 am D.11:25 am E.None of these

Last Answer : Answer – C (11 am) Explanation – Suppose they meet x hrs after 8 a.m. Then, (Distance moved by first in x hrs) + [Distance moved by second in (x-1) hrs] = 330 60x + 75(x – 1) = 330 x = 3 So, they meet at (8 + 3), i.e. 11 a.m

Description : The distance between two cities A and B is 330 km. A train starts from A at 8 a.m. and travels towards B at 60 km/hr. Another train starts from B at 9 a.m. and travels towards A at 75 km/hr. At what time do they meet? A.10:30 am B.10:45 am C.11 am D.11:25 am E.None of these

Last Answer : Answer – C (11 am) Explanation – Suppose they meet x hrs after 8 a.m. Then, (Distance moved by first in x hrs) + [Distance moved by second in (x-1) hrs] = 330 60x + 75(x – 1) = 330 x = 3 So, they meet at (8 + 3), i.e. 11 a.m

Description : Four pipes can fill a reservoir in 15, 20, 30 and 60 hours respectively. The first one was opened at 6 AM, second at 7 AM, thir da t 8 AM and the fourth at 9 AM. When will the reservoir be filled ? (A) 11 AM (B) 12 Noon (C) 1 PM (D) 1:30 PM

Last Answer : Answer: C

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : The distance between two stations ooty and chennai is 615km. A train with speed of 75 km/h leaves ooty at 8:00 am towards chennai. Another train with speed of 105 km/h leaves Chennai at 9 : 00 am towards ooty . Then, at what time both trains meet? A) 6 B) 12 C) 18 D) 24

Last Answer : ANSWER:B  Explanation:  First train leaves at 8.00am and second leaves at 9.00am  So,first train that is , from ooty to Chennai has covered  75 km distance in 1 hr.  So , distance left by between the station = ... the trains will meet , 3 hr after second train left  i.e., 9.00 am +3 = 12.00 pm

Description : High strength of concrete requires a water cement ratio of [ A ] 0.10 to 0.15 [ B ] 0.25 to 0.30 [ C ] 0.45 to 0.60 [ D ] 0.75 to 0.90

Last Answer : [ B ] 0.25 to 0.30

Description : P and Q finished a work in 36 days; Q and R can do it in 60 days; P and R can do it in 45 days. In what time can P alone do it. a) 30 days b) 60 days c) 90 days d) 120 days

Last Answer : B (P+Q)'s 1 day work = 1/36 ---1 (Q+R)'s 1 day work = 1/60 ----2 (P+R)'s 1 day work = 1/45 ----3 Adding 1 & 2 & 3 we get 2(P+Q+R)'s 1 day work = 1/36 + 1/60+ 1/45 =(5+3+4)/180 = 12/ ... +R)'s 1 day work - (Q+R)'s 1 days work = 1/30 - 1/60 = 2-1/60 = 1/60 P alone can do the work in 60 days.

Description : Percentage content of silica in window glass, is (A) 40 to 45 (B) 50 to 55 (C) 60 to 65 (D) 70 to 75

Last Answer : Answer: Option D

Description : For batching 1:3:6 concrete mix by volume, the ingredients required per bag of 50 kg cement, are: (A) 70 litres of sand and 120 litres of aggregates (B) 70 kg of sand and 140 litres of ... C) 105 litres of sand and 140 litres of aggregates (D) 105 litres of sand and 210 litres of aggregates

Last Answer : Answer: Option D

Description : The average age of the whole class is 12.05 years. The average age of all girls is 12.5 years and the average age of boys is 11.75 years. If the total number of boys is 45 then what is the total number of girls in the class? a) 20 b) 25 c) 30 d) 35 e) 40

Last Answer : Let the number of girls be x. The number of boys is 45. :. Total age of boys and girls in the class = (x+45) × 12.05 or, (x+45) × 12.05 = 45 × 11.75 + x × 12.5 or, 12.05x + 542.25 = 528.75 + 12.5x or, 13.5 = 0.45x or, x = 13.5/0.45 = 30 Answer is: c)

Description : Mark the correct option relating to age limit a) For WLI & EA policies the insurant should not be less than 19 year an not more than 55 year on the date of next birthday b) For CWLA the upper age ... of both the spouses should not be less than 21 year and not more than 45 year. e) All the above

Last Answer : e) All the above

Description : Given the following data pairs (x, y), find the regression equation. (1, 1.24), (2, 5.23), (3, 7.24), (4, 7.60), (5, 9.97), (6, 14.31), (7, 13.99), (8, 14.88), (9, 18.04), (10, 20.70) a. y = 0.490 x - 0.053 b. y = 2.04 x c. y = 1.98 x + 0.436 d. y = 0.49 x

Last Answer : c. y = 1.98 x + 0.436

Description : Generally during summer and khurq’ seasons annual plants produce bloom in how many days ? (a) 60 — 70 days (b) 70 —— 80 days (c) 70 — 75 days (d) 50 – 60 days

Last Answer : (c) 70 — 75 days

Description : A reduction of 20% in the price of sugar enables a person to get 7.8 kg more sugar for Rs.3.90. The original price of sugar per kg is a) Rs. 10 b) Rs.11.50 c) Rs. 12.5 d) Rs. 15 , e) Rs. 10.5

Last Answer : d) Rs. 15 ,

Description : At present, a mother is 3 times older than her son. After 5 years, the sum of their ages will be 70 years. The age of the mother after 10 years will be (A) 40 (B) 55 (C) 45 (D) 60

Last Answer : 45

Description : In a single threaded worm and worm wheel the number of teeth on the worm wheel is 60. The diameter of the effort wheel is 12 cm and that of load drum is 8 cm. The velocity ratio will be a.90 b.120 c.60 d.45 e.107 dynes

Last Answer : a. 90

Description : In a single threaded worm and worm wheel the number of teeth on the worm wheel is 80. The diameter of the effort wheel is 12 cm and that of load drum is 8 cm. The velocity ratio will be a.60 b.45 c.120 d.107 dynes e.90

Last Answer : c. 120

Description : The weight of the puddler is . A 10-20 kg C 20-30 kg B 30-40 kg D 45-55 kg

Last Answer : 30-40 kg

Description : A foot ball team lost 75 % of the matches it played. If it won 45 matches, find the number of matches it played. a) 120 b) 145 c) 105 d) 140 e) 180

Last Answer : Answer: E Percentage of matches lost = 75 % Therefore Percentage of matches won (100 - 75) % = 25 % Let the number of matches played be x. Then 25 % of x = 45 25/100 × x =45  x = (45 × 100)/25  x = (4500)/25  x = 180 Therefore, the total number of matches played is 180.

Description :  In what ratio must a person mix three kinds of musted seeds costing Rs.65/kg, Rs.70/kg and Rs.105 /kg so that the resultant mixture when sold at Rs.96/kg yields a profit of 20%? a) 1:2:4 b) 3:7:6 c) 1:4:2 d)1:8:6 e) 40 : 8 : 25

Last Answer : E The resultant mixture is sold at a profit of 20% at Rs.96/kg i.e. 1.2 (cost) = Rs.96 => Cost = = Rs.80 / kg. Let the three varities be A, B, and C costing Rs.65, Rs.70 and Rs.105 respectively. The ... be mixed. A:C=4:5 B:C=2:5 The resultant ratio A : B : C :: 40 : 8 : 25. 

Description : Two numbers are in the ration 3:5. If 9 is subtracted from the numbers, the ratio becomes 12:23. The numbers are (A) 30, 50 (B) 36, 60 (C) 33, 55 (D) 42, 70

Last Answer : Answer: C

Description : Chenna dhal is now being sold at Rs. 70 a kg. Last month, is rate was Rs. 80 per kg. By how much percent should a family reduce its consumption so as to keep the expenditure fixed? a)12.5 b)21.8 c)23 d)18

Last Answer : Answer: A  Let a family's monthly consumption of chenna dhal be x kg.  To keep the expenditure fixed,  their consumption for this month should be 70x/80 = 7x/8.  Reduction in consumption = x/8 = 12.5% of x

Description : As a good management practice recommended for the growing cattle in India, what should be the daily requirement of TDN for a cattle of 200 kg live body weight ? (A) 3•2 kg (B) 1•8 kg (C) 2•4 kg (D) 4•0 kg (E) 0•9 kg

Last Answer : (C) 2•4 kg

Description : How much seed per hectare is needed for Berseem ? (a) 18 — 22 kg (b) 25 — 30 kg (c) 30 – 35 kg (d) 15 — 20 kg

Last Answer : (b) 25 — 30 kg

Description : Seed rate of cluster bean? a 25-30 kg/ha b 15-18 kg/ha c 20-22 kg/ha d 18-20 kg/ha

Last Answer : a 25-30 kg/ha

Description : Assume postal rates for 'light letters' are: $0.25 up to 10 grams; $0.35 up to 50 grams; $0.45 up to 75 grams; $0.55 up to 100 grams. Which test inputs (in grams) would be selected using boundary value analysis? A. 0, 9,19, ... C. 0, 1,10,11, 50, 51, 75, 76,100,101 D. 25, 26, 35, 36, 45, 46, 55, 56

Last Answer : C. 0, 1,10,11, 50, 51, 75, 76,100,101

Description : At what height must top rails be fitted above working platform? a. Between 90 cm (35 inches) and 110 cm (43 inches) b. Between 100 cm (39 inches) and 120 cm (47 inches) c. Between 95 cm (38 inches) and 115 cm ( 45 inches) d. Between 105 cm (41 inches)and 125 cm (49 inches)

Last Answer : c. Between 95 cm (38 inches) and 115 cm ( 45 inches)

Description : Find the range of the given data : 25, 18, 20, 22, 16, 6, 17, 15, 12, 30, 32, 10, 19, 8, 11, 20 -Maths 9th

Last Answer : Here, the minimum and maximum values of given data are 6 and 32 respectively. Range = 32 – 6 = 26

Description : Find the range of the given data : 25, 18, 20, 22, 16, 6, 17, 15, 12, 30, 32, 10, 19, 8, 11, 20 -Maths 9th

Last Answer : Here, the minimum and maximum values of given data are 6 and 32 respectively. Range = 32 – 6 = 26

Description : The range of the data 25, 18, 20, 22, 16, 6, 17, 15, 12, 30, 32, 10, 19, 8, 11 and 20 is -Maths 9th

Last Answer : In conclusion, the range of data 25, 18, 20, 22, 16, 6, 17, 15, 12, 30, 32, 10, 19, 8, 11, and 20 is 26.

Description : The range of the data 25, 18, 20, 22, 16, 6, 17, 15, 12, 30, 32, 10, 19, 8, 11 and 20 is -Maths 9th

Last Answer : (d) In a given data, maximum value = 32 and minimum value = 6 We know, range of the data = maximum value – minimum value = 32 – 6 = 26 Hence, the range of the given data is 26.

Description : Fluid present in dense connective tissue and cartilage in ml/kg body weight is about (A) 10 (B) 20 (C) 45 (D) 55

Last Answer : Answer : C

Description : Which one of the following statements is correct regarding blood pressure? (a) 130/90 mm Hg is considered high and requires treatment. (b) 100/55 mm Hg is considered an ideal blood pressure. (c) 105/50 mm Hg makes one very active. (d) 190/110 mm Hg may harm vital organs like brain and kidney.

Last Answer : d) 190/110 mm Hg may harm vital organs like brain and kidney.

Description : The maximum permissible noise level to which a man working in a chemical plant can be exposed for eight hours per day is about __________ decibels. (A) 60 (B) 90 (C) 105 (D) 120

Last Answer : (B) 90

Description : The missing number in the series 40, 120, 60, 180, 90, ?, 135 is (A) 110 (B) 270 (C) 105 (D) 210

Last Answer : Answer: B

Description : A singly reinforced concrete beam of 25 cm width and 70 cm effective depth is provided with 18.75 cm2 steel. If the modular ratio (m) is 15, the depth of the neutral axis, is (A) 20 cm (B) 25 cm (C) 30 cm (D) 35 cm

Last Answer : Answer: Option C

Description : Percentage of water in buffalo milk is:- a. 65-67 % b. 70-75 % c. 80-85 % d. 87-90 %

Last Answer : d. 87-90 %

Description : A 19 year-old female is referred following a visit to the dentist where marked erosion of her teeth was noted. She was entirely asymptomatic and her only medication was the oral contraceptive pill ... ) Bulimia nervosa 2) Conn's syndrome 3) Laxative abuse 4) Pregnancy 5) Primary hypoparathyroidism

Last Answer : Answers-5 This patient has tooth erosion associated with hypokalaemic metabolic alkalosis and hypocalcaemia. This suggests a diagnosis of hypoparathyroidism. Conn's is unlikely in this age group, is ... raised alkaline phosphatase would not be expected. Early pregnancy would not fit this picture.

Description : The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage ... 15) chains (B) (6 + 12) chains (C) (6 + 18) chains (D) None of these

Last Answer : (B) (6 + 12) chains

Description : The distance between two cities A and B is 330km. A train starts from A at 8 (a)m. and travels towards B at 60 km/hr. Another train starts from B at 9 (a)m. and travels towards A at 75 km/hr. At what time do they meet? a) 10 am. b) 10 : 30 am. c) 11 am. d) 11 : 30 am. e) None of these

Last Answer : Distance travelled by first train in one hour = 60 x 1 = 60 km Therefore, distance between two train at 9 a.m. = 330 – 60 = 270 km Now, Relative speed of two trains = 60 + 75 = 135 km/hr Time of meeting of two trains =270/135=2 hrs. Therefore, both the trains will meet at 9 + 2 = 11 A.M. Answer: c)

Description : 11. Acid regression stage of sludge digestion at a temperature 21°C extends over a period of A. 15 days B. 30 days C. 60 days D. 90 days

Last Answer : ANS: D

Description : Gross assets are Rs.1,01,000, fictitious assets Rs.350 are included in the gross assets. External liabilities are Rs.7,500. 6% prefer share capital is Rs.45,000. Equity capital is 4,500 equity shares of Rs.10 each fully ... . The Net Asset Value Per share is A Rs.11 B Rs.10.70 C Rs.15 D Rs.20

Last Answer : Rs.10.70

Description : A soil mass coated with a thin layer of paraffin weighs 460 g. When immersed, it displaces 299 cc of water. The weight of paraffin is 10 g. If specific gravity of solids is 2.5 and that of paraffin 0.9, the void ratio of soil, is (A) 0.55 (B) 0.60 (C) 0.65 (D) 0.70

Last Answer : Answer: Option B