Which of the following is the most efficient means of product quality inspection?

1. Acceptance sampling 

2. 100% inspection 

3. Variable sampling 

4. a and c

1 Answer

Answer :

3. Variable sampling

Related questions

Description : A planning phase for an engineering component generated 80 engineering drawings. The QA team randomly selected 8 drawings for inspection. This exercise can BEST be described as example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : .A planning phase for an engineering component generated 80 engineering drawings. The QA  team randomly selected 8 drawings for inspection. This exercise can BEST be described as  example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : Each item of the Work Breakdown Structure is assigned a unique identifier. What is the name  of this identifier? 1. Product ID number  2. Code of accounts  3. Quality inspection identifier  4. Project activity code

Last Answer : 2. Code of accounts

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Quality control in the final analysis is : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements  2. a production system  3. an inspection system  4. fitness for purpose

Last Answer : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements

Description : Which method of organisational buying is appropriate when the product is highly homogeneous and examination of each item is not feasible? A)Negotiation B)Sampling C)Description D)Inspection E)Homogeneous selection

Last Answer : B)Sampling

Description : Fill in the blank. The _____ is the difference between the additional money spent on  prevention and the corresponding reduction in the cost of failure. Select one: a. cost-benefit analysis b. implicit cost c. cost of quality d. variable cost e. cost-utility analysis

Last Answer : c. cost of quality

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : The best way to test the Project Management Plan (SPMP) is by a) Prototyping b) Inspection c) Simulation d) Compilation e) Debugging.

Last Answer : b) Inspection

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : . An important aim of a post-project review is to: a. validate overall progress to date against the budget and schedule. b. capture learning and document it for future usage. c. ... of all permanent documentation, signed by the sponsor. d. establish that project benefits have been identified.

Last Answer : b. capture learning and document it for future usage.

Description : The criteria for acceptance of a project on the basis of Profitability Index (PI) is   A.PI=0 B. PI > 0   C. PI < 0   D. PI > 1

Last Answer : D. PI > 1

Description : The outputs of the Close Project process include all of the following except for which one?  A. Administrative closure procedure B. Formal acceptance C. Lessons learned D. Closed contracts

Last Answer : C. Lessons learned

Description : An important aim of a post-project review is to:  a. validate overall progress to date against the budget and schedule.  b. capture learning and document it for future usage.  c. ... of all permanent documentation, signed by the sponsor.  d. establish that project benefits have been identified

Last Answer : b. capture learning and document it for future usage.

Description : From a contract management perspective, the project manager must consider the: 1. acquisition process 2. contract administration  3. ecological environment  4. offer, acceptance, and consideration  5. a and b

Last Answer : 5. a and b

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project B. an independent project C. a dependent project D. None of the above

Last Answer : B. an independent project

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project. D. a contingent project.

Last Answer : A. a mutually exclusive project.

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project E. none of the above

Last Answer : A. a mutually exclusive project.

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project

Last Answer : C. a dependent project

Description : A project whose acceptance requires the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project E. none of the above

Last Answer : A. a mutually exclusive project.

Description : A project whose acceptance precludes the acceptance of one or more alternative projects is referred to as . A. a mutually exclusive project. B. an independent project. C. a dependent project D. a contingent project

Last Answer : C. a dependent project

Description : What Is Acceptance Testing?

Last Answer : Acceptance Testing is performed by the client to see if the system delivers what was requested. It looks similar to system testing but the difference is in the focus. Here, the testing is done by Client ... point of view as he is the one who knows the whole process and requirements of his business.

Description : Bob Roberts of Roberts Construction is planning to buy a piece of earth-moving equipment. He would most likely base his purchase decision on ______ of the alternative machines: A)description B)sampling C)inspection D)reputation

Last Answer : C)inspection

Description : United Biscuits buys shortening from suppliers in the European Community. The buyer for the firm is MOST likely use which method of organisational buying? A)Description B)Inspection C)Sampling D)Negotiation E)Blind

Last Answer : C)Sampling

Description : A grocery shop wants to order several dozen large grade 1 eggs from its local supplier. The shop's buyer will most likely use which purchase method: A)description B)sampling C)negotiation D)inspection

Last Answer : A)description

Description : According to leading experts in software development, the margin of error when  estimating project costs is 100% and the margin of error in project scheduling time is  25%.

Last Answer : Ans: True

Description : At a work site, statistical quality control of concrete means (A) Measurement of risks to eliminate failures (B) Applying the theory' of probability to sample testing or inspection (C) Reduction in wastage of inspection costs (D) Reduction in costs for the removal of defects

Last Answer : (B) Applying the theory' of probability to sample testing or inspection

Description : Measured quality of a manufactured product is : 1. Always constant  2. Continually decreasing  3. Subject to a certain amount of variation  4. Continually increasing

Last Answer : 3. Subject to a certain amount of variation

Description : There are 2 plants manufacturing the same product under one corporate management which has decided to merge them. Calculate Break -even point of the merged plant. Particulars Plant I Plant II Capacity operation 100% ... 000 2,40,000 Variable cost 4,40,000 1,80,000 Fixed cost 80,000 50,000simpl

Last Answer : c) Rs 5,00,000

Description : The cost of quality quality is a. An expression of expression of an organizatio organization's performance in performance in quality in quality in financial terms financial terms b. The ... inspection and inspection and testing of testing of the outputs from outputs from a transformation process.

Last Answer : b. The difference between customers’ expectations of a product or service and their perceptions of their experience of it.

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : In the stock-price beta estimation for the Coca-Cola Company, the dependent variable is the: A. return on Coca-Cola. B. price of Coca-Cola stock. C. return on the S&P 500. D. value of the S&P 500 Index.

Last Answer : A. return on Coca-Cola.

Description : PERT (Project Evaluation and Review Technique) analysis is based on  A. Optimistic time, Pessimistic time and Most likely time  B.Pessimistic time, Optional time, Maximum time  C.Optimistic time, Efficient time, Most likely time  D.Minimax time, Optimistic time and harmonic time

Last Answer : A. Optimistic time, Pessimistic time and Most likely time

Description : If we took the 500 nursing students attending a school in Karachi, divided them by gender, and then took a random sample of the males and a random sampling of the females, the ... called the _____. a. Independent variable b. Dependent variable c. Stratification variable d. Sampling variable

Last Answer : c. Stratification variable

Description : Five dimensions that must be managed on a project (A) Constraint, Quality, Cost, Schedule, Staff (B) Features, Quality, Cost, Schedule, Staff (C) Features, priority, Cost, Schedule, Staff (D) Features, Quality, Cost, Schedule, customer

Last Answer : (B) Features, Quality, Cost, Schedule, Staff

Description : Project performance consists of (A) Time (B) Cost (C) Quality (D) All of the above

Last Answer : (C) Quality

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : . The process that evaluates overall project performance to provide confidence is called: a. quality assurance. b. quality planning. c. quality control. d. quality audit.

Last Answer : a. quality assurance.

Description : Which one of the following does project change control primarily seek to ensure? a. All variance to the project scope is evaluated. b. No reduction in the perceived quality of the project outcome. ... project do not increase. d. Any decrease in the scoped deliverable of the project is rejected.

Last Answer : a. All variance to the project scope is evaluated.

Description : . A project is typically defined in terms of scope, time, cost and which other parameter? a. Benefits. b. Quality. c. Tolerance. d. Controls.

Last Answer : b. Quality.

Description : Which statement best describes a responsibility of the project manager: a. to be the sole source of expertise for estimating techniques on cost and time. b. to deliver the project objectives to ... benefits. d. to delegate all accountability for managing time, cost and quality to team leaders.

Last Answer : b. to deliver the project objectives to enable benefits to be realised.

Description : Which one of the following statements is true? a. An increase in project scope is likely to increase project cost. b. A decrease in the project time is likely to increase project quality. c. ... to decrease project cost. d. A decrease in the project cost is likely to decrease project time.

Last Answer : a. An increase in project scope is likely to increase project cost.

Description : Which one of the following statements is true? a. Independent reviews and quality audits form part of quality assurance to ensure the project manager delivers on time and to budget. ... Quality planning enables the project manager to manage the trade-off between customer expectations  and budget

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for purpose and  meet stakeholder expectations.

Description :  Root Cause Analysis relates to: A. Process Analysis B. Quality Audits C. Quality Control Measurements D. Performance Measurements

Last Answer : A. Process Analysis

Description : Process Analysis is a function of: A. Performance Analysis B. Quality Metrics C. Process Improvement Plan D. Quality Improvement Plan

Last Answer : C. Process Improvement Plan

Description :  Which of the following is the most important element of Project Management Plan that is useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : . An independent relationship must exist between the attribute that can be measured and the external quality attribute. a) True b) False

Last Answer : b) False

Description : Quality planning is the process of developing a quality plan for a) team b) project c) customers d) project manager

Last Answer : b) project