A planning phase for an engineering component generated 80 engineering drawings.

The QA team randomly selected 8 drawings for inspection. This exercise can BEST be

described as example of:

A. Inspection

B. Statistical Sampling

C. Flowcharting

D. Control Charting

1 Answer

Answer :

B. Statistical Sampling

Related questions

Description : .A planning phase for an engineering component generated 80 engineering drawings. The QA  team randomly selected 8 drawings for inspection. This exercise can BEST be described as  example of: A. Inspection B. Statistical Sampling C. Flowcharting D. Control Charting

Last Answer : B. Statistical Sampling

Description : Which of the following is the most efficient means of product quality inspection? 1. Acceptance sampling  2. 100% inspection  3. Variable sampling  4. a and c

Last Answer : 3. Variable sampling

Description : Project management is the second major component of the planning phase of the  systems development life cycle (SDLC), and it includes three steps: creating the work  plan, staffing the project, and controlling and directing the project.

Last Answer : Ans: True

Description : Assembling project team and assigning their responsibilities are done during which phase of a  project management? (A) Initiation (B) Planning (C) Execution (D) Closure

Last Answer : A) Initiation

Description : The element of the audit planning process most likely to be agreed upon with the client before implementation of the audit strategy is the determination of the a. Methods of statistical sampling to be used ... for the auditor's opinion. d. Schedules and analyses to be prepared by the client's staf

Last Answer : Schedules and analyses to be prepared by the client's staf

Description : Bob Roberts of Roberts Construction is planning to buy a piece of earth-moving equipment. He would most likely base his purchase decision on ______ of the alternative machines: A)description B)sampling C)inspection D)reputation

Last Answer : C)inspection

Description : A project planning methodology is any structured approach used to guide the project team  during development of the project plan. What is an example of this methodology? 1. Standard forms or templates.  2. Upper management involvement  3. Functional work authorizations 4. Stakeholders skills

Last Answer : 1. Standard forms or templates.

Description : In the ____ stage, of project identification the project ideas generated above are  screened and a preliminary exercise is conducted to weed out the bad or unviable ideas.

Last Answer : Ans. Screening

Description : According to a statistical report: over 30% of all projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such ... change management b) Poor requirements management c) Poor quality control d) All of the mentioned

Last Answer : b) Poor requirements management

Description : Project risk management is best described as: a. managing responses to threats. b. identifying and acknowledging threats and opportunities. c. planning responses to threats. d. minimising threats and maximising opportunities.

Last Answer : d. minimising threats and maximising opportunities.

Description : Project risk management is best described as:  a. managing responses to threats.  b. identifying and acknowledging threats and opportunities.  c. planning responses to threats.  d. minimising threats and maximising opportunities.

Last Answer : d. minimising threats and maximising opportunities.

Description : )The engineer of the project in the planning phase and makes a significant contribution to the  technical scope. This is an example of what type of skill and knowledge? 1. Inherent  2. Stakeholder  3. Technical evaluation  4. Convergent thinking

Last Answer : 2. Stakeholder

Description : Identify, from among the following, the correct statement. a) One of the main challenges Engineering facing today is the requirement of most systems to work with a multitude of  homogenous systems ... of component based assembly, we find  that onlyless than 20% of today's is still custom built

Last Answer : c) does not wear-out in the traditional sense of the term, but  does tend to deteriorate as it evolves

Description : Component-based Engineering allows faster delivery. a) True b) False

Last Answer : a) True

Description : This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Project  Management . 1. Which of the following is not project management goal? a) Keeping overall ... agreed time c) Maintaining a happy and well-functioning development team d) Avoiding customer complaints

Last Answer : d) Avoiding customer complaints

Description : Constantine suggests four “organizational paradigms” for  engineering teams. The best project team organizational model to use when handling extremely complex problems is  a. Random paradigm b. Open paradigm c. Synchronous paradigm d. Closed paradigm

Last Answer : a. Random paradigm

Description : In connection with the examination of financial statements, an independent auditor could be responsible for failure to detect a material fraud if a. Accountants performing important parts of the ... . The fraud was perpetrated by one client employee, who circumvented the existing internal control

Last Answer : The auditor planned the work in a hasty and inefficient manner.

Description : In connection with the examination of financial statements, an independent auditor could be responsible for failure to detect a material fraud if a. Statistical sampling techniques were not used on ... partsof the work failed to discover a close relationship between the treasurer and the cashie

Last Answer : The auditor planned the work in a hasty and inefficient manner.

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : Quality control in the final analysis is : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements  2. a production system  3. an inspection system  4. fitness for purpose

Last Answer : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements

Description : At a work site, statistical quality control of concrete means (A) Measurement of risks to eliminate failures (B) Applying the theory' of probability to sample testing or inspection (C) Reduction in wastage of inspection costs (D) Reduction in costs for the removal of defects

Last Answer : (B) Applying the theory' of probability to sample testing or inspection

Description : Which of the following is not true for a Responsibility Assignment Matrix (RAM): A. Defines what project team is responsible for each WBS component B. Defines what project member is ... . Text description of roles, responsibilities, authorities D. Defines all people associated with each activity

Last Answer : C. Text description of roles, responsibilities, authorities

Description : Which of the following is not true for a Responsibility Assignment Matrix (RAM): A. Defines what project team is responsible for each WBS component B. Defines what project member is ... . Text description of roles, responsibilities, authorities D. Defines all people associated with each activity

Last Answer : C. Text description of roles, responsibilities, authorities

Description : Quality planning is the process of developing a quality plan for a) team b) project c) customers d) project manager

Last Answer : b) project

Description : Quality planning is the process of developing a quality plan for a) team b) project c) customers d) project manager

Last Answer : b) project

Description : Why are changes to the project scope necessary? Select one: a. To understand reports b. To reflect new information c. To begin planning the project d. To teach team members what they need to know about their jobs e. To establish a trusting project culture

Last Answer : b. To reflect new information

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : Quality planning is the process of developing a quality plan for (A) team (B) project (C) customers (D)project manager

Last Answer : (D)project manager

Description : The successful project managers spend most of their time:  A. Planning with their personnel  B. Planning with the top management  C. Communication with the project team (Ans.)  D. Studying project results

Last Answer : C. Communication with the project team (Ans.)

Description : From HR perspective, the project manager's responsibility in the planning role includes: 1. Hiring the team  2. Developing work schedules 3. Forecasting  4. Feedback sessions  5. Both b and c

Last Answer : 5. Both b and c

Description : The successful project managers spend most of their time: 1. Planning with their personnel  2. Planning with the top management  3. Communication with the project team  4. Studying project results.

Last Answer : 3. Communication with the project team

Description : The PM distributed a document to the stakeholders, which described the software to be  developed, the functionality, the users it would serve and the installation timeline. The document  was an example of: ... scope  4. It was not complete enough to be either a product or a project scope document

Last Answer : 4. It was not complete enough to be either a product or a project scope document

Description : The numbering of the nodes in A-O-A is done  A.From left to right B.From Right to Left  C.Randomly  D.On the basis of the duration of the activity

Last Answer : A.From left to right

Description : What is the probability that a randomly selected bit string of length 10 is a palindrome? (A) 1/64 (B) 1/32 (C) 1/8 (D) ¼

Last Answer : (B) 1/32

Description : The statistical tool that depicts a project’s tasks and the relationships between those tasks is  known as (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (D) PERT chart

Description : Configuration management is best described as: a. control in the implementation of changes to project schedules. b. an organization to review proposed changes to the project deliverables ... and documentation. d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Configuration management is best described as:  a. control in the implementation of changes to project schedules.  b. an organisation to review proposed changes to the project deliverables ... and documentation.  d. creation, maintenance and controlled change of the project deliverables.

Last Answer : d. creation, maintenance and controlled change of the project deliverables.

Description : Determining the sample interval (represented by k), randomly selecting a number between 1 and k, and including each kth element in your sample are the steps for which form of sampling? a. Simple Random Sampling b. Stratified Random Sampling c. Systematic Sampling d. Cluster sampling

Last Answer : c. Systematic Sampling

Description : Which of the following techniques yields a simple random sample? a. Choosing volunteers from an introductory psychology class to participate b. Listing the individuals by ethnic group and choosing a ... from the table. d. Randomly selecting schools, and then sampling everyone within the school.

Last Answer : c. Numbering all the elements of a sampling frame and then using a random number table to pick cases from the table

Description : Research ethics has a direct connection more often with which stages of research ? (A) Defining and delimiting the scope of research. (B) Problem formulation and reporting of research ... deciding the sampling technique for research. (D) Deciding about statistical techniques and data analysis.

Last Answer : (B) Problem formulation and reporting of research findings. 

Description : Fill in the blank. Risk must be considered in the _____ phase and weighed against  the potential benefit of the project’s success in order to decide if the project should  be chosen. Select one: a. completion b. closeout c. execution d. planning e. initiation

Last Answer : e. initiation

Description : Fill in the blanks. It is during the ______________ phase that the decision should be  made regarding whether the project should continue. During this phase, ____________  must be considered and weighed ... . closeout, resources c. execution, performance d. planning, timing e. initiation, risk

Last Answer : e. initiation, risk

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 10 person-months for a systems project where the planning phase was completed in 7.5 person-months.

Last Answer : Ans: True