Description : Coast Guard Regulations (46 CFR) require that each alternating current generator arranged for parallel operation shall be provided with _____________. A. more than one means of excitation B. individual circuit fuses C. a high back-pressure trip D. a reverse-power trip
Last Answer : Answer: D
Description : Coast Guard Regulations (46 CFR) require that the emergency diesel generator engine shut down when _____________. A. lubricating oil pressure is lost B. the engine overspeeds dangerously C. fixed CO2 is released into the emergency diesel generator space D. all of the above
Description : Where automatic restart does not present a hazard after a power failure, Coast Guard Regulations (46 CFR) require motor controllers for auxiliaries vital to the propelling equipment to be provided ... overload protection B. low voltage protection C. low voltage release D. reverse current protection
Last Answer : Answer: C
Description : In accordance with Coast Guard Regulations (46 CFR), each battery operated relay-controlled lantern must _____________. A. be readily portable B. contain a dry cell battery having a minimum capacity of ... automatic battery charger to maintain the battery in a fully charged state D. all of the above
Description : According to Coast Guard Regulations (46 CFR), the talking and calling circuits of a sound powered telephone system must be _____________. A. intrinsically safe B. independent of each other C. independently grounded D. connected to a common ground
Last Answer : Answer: B
Description : According to Coast Guard Regulations (46 CFR), which of the following systems must be arranged so as to be energized by the final emergency power source? A. at least one light in the ... operated watertight door system C. each charging panel for temporary emergency batteries D. all of the above
Description : Coast Guard Regulations (46 CFR) require that lighting fixture globes must be protected by guards if the fixtures are located in the ____________. A. steering gear room B. galley C. living quarters D. wheelhouse
Last Answer : Answer: A
Description : In accordance with Coast Guard Regulations (46 CFR), a circuit breaker located in the machinery space and installed in a 440V AC system must _____________. A. be dependent upon mechanical ... the maximum asymmetrical shortcircuit current available at the point of application D. all of the above
Description : When portable cords are connected to devices such as portable tools, you must eliminate direct tension on the joints or terminal screws. Coast Guard Regulations (46 CFR), allow this to be done by ... the plugs together C. installing a special fitting to eliminate plug separation D. all of the above
Description : Coast Guard Regulations (46 CFR) require each switchboard to have ___________. A. non-conductive deck covering at the frount B. non-conductive deck coverings at the rear C. a name plate for each circuit breaker D. all the above
Description : Coast Guard Regulations (46 CFR) require instrument and control wiring in a switchboard to be of what minimum size? A. 12 AWG B. 14 AWG C. 16 AWG D. 18 AWG
Description : Coast Guard Regulations (46 CFR) require that fire door holding and release systems are to comply with subpart _________. A. 111.15 B. 111.54 C. 111.99 D. 111.112
Description : Coast Guard Regulations (46 CFR), require that an indicating light at the propulsion control station will operate if overloading or overheating occurs in a _______________. A. forced draft blower motor B. steering gear motor C. fuel pump motor D. condensate pump motor
Description : Coast Guard Regulations (46 CFR) require manual contactors for operating the general emergency alarm on tank vessels to be located in the navigating bridge, engine room and the ____________. A ... C. crew accommodations and sleeping spaces D. engineering officers' quarters furthest from the bridge
Description : According to U. S. Coast Guard Regulations (46 CFR), the motor controller for a submersible electric motor driven bilge pump should be installed _____________. A. in the shaft alley B. at the submersible bilge pump C. above the uppermost continuous deck D. at the engine room emergency control panel
Description : Which of the following statements is a requirement of Coast Guard Regulations (46 CFR) concerning emergency diesel generator engines? A. The fuel must have a flash point not less than 75°F. B. ... to each side of the vertical. D. The starting battery must produce 12 consecutive cranking cycles.
Description : Which of the following statements of Coast Guard Regulations (46 CFR) concerning battery installations is correct? A. Sign, permanently secured to the battery trays, indicating that 'naked lights or smoking is ... on the bottom. D. Power and lighting batteries must be of the lead-acid type only.
Description : In accordance with Coast Guard Regulations (46 CFR), a steering gear feeder circuit from the emergency switchboard or alternate power supply must have the capacity for continuous operation of the rudder 15° side to side in not more than 60 seconds for a A. 1/4 hour B. 1/2 hour C. 1 hour D. 2 hours
Description : According to Coast Guard Regulations (46 CFR), a battery installation must be in a room that is only for batteries or a box on deck. This would be termed a ____________. A. small installation B. moderate installation C. large installation D. high amp/hour capacity installation
Description : According to Coast Guard Regulations (46 CFR), which of the following is an acceptable lining for battery trays containing alkaline batteries? A. Brass B. Lead C. Steel D. Zinc
Description : Coast Guard Regulations (46 CFR) state that the minimum conductor size allowed for use in flexible electrical cords is ____________. A. 10 AWG B. 14 AWG C. 18 AWG D. 20 AWG
Description : Coast Guard Regulations (46 CFR) state that a continuous trickle charge, supplied from the ship's service power system, is required for batteries supplying power to the ___________. A. emergency diesel ... system for the radar C. portable radios for the lifeboats D. radios installed in the lifeboats
Description : If the illustrated lighting branch distribution box is not for cargo or deck lighting, the Coast Guard Regulations (46 CFR) requires the designed load attached to Branch NO.2 to be no more than _________. EL-0013 A. 5 amps B. 16 amps C. 30 amps D. 50 amps
Description : An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every _____________. A. week B. 2 weeks C. month D. 3 months
Description : Federal Regulations (46 CFR) require the circuit in the illustration to _________. EL-0009 A. be at the vessel's ship's service generator distribution switchboard for normal power, normal lighting ... ground will interfere with the operation of electronic equipment D. All the above are correct
Description : According to Coast Guard Regulation (46 CFR) for emergency power and lighting systems, which of the listed items is the only permissible starting aid for the emergency diesel generator engine? A. Ether B. Lube oil heater C. Jacket water heater D. Fuel oil heater
Description : In the illustration if BRANCH NO. 1 is a lighting circuit for crew's berthing, Federal Regulations (46 CFR) require the maximum fuse rating for that branch to be _________. EL-0013 A. 80% of the connected load B. 15 amps C. 20 amps D. 30 amps
Description : Receptacle outlets aboard ship should be designed so those mounted according to 46 CFR 111 have _____________. A. there must be a sufficient number of receptacle outlets in the crew accommodations for an ... outlet must not have any exposed parts with the plug opening uncovered D. all of the above
Description : The office of the every Inspector should be thoroughly inspected at least once in every by the ________ in accordance with the standard questions a) Quarterly , Supdt b) Half yearly, Supdt c) Twelve month, Supdt d) None of these
Last Answer : c) Twelve month, Supdt
Description : Why must a personal watercraft operator follow US coast guard rules and regulations?
Last Answer : Because they are considered a class A motor vessel
Description : The Department of Transportation regulations 49 CFR require which parameter to be recorded on the shipping paper for hazard class 2.2 nonflammable compressed gases?
Last Answer : no
Description : The standard procedure for maintaining the charge in an emergency diesel starting battery is to trickle charge the battery _____________. A. continuously B. at least once each week C. whenever the charge falls to 75% of full charge D. whenever the electrolyte specific gravity falls to 1.250 or lower
Description : Which of the following statements is/are true regarding requirements for receptacle outlets aboard vessels? A. Each receptacle outlet operating at 100 volts or more must have a grounding pole. B. Outlets ... machinery with a portable light having a 50 foot flexible cord. D. All of the above.
Description : Electrical insulation is classed by the _____________. A. International Association of Electrical Manufacturers B. approximate operating voltage and current expected C. U.S. Coast Guard D. temperature stability of the manufacturing material(s)
Description : In the illustration if BRANCH NO. 1 is a lighting circuit for crew's berthing, 46 CFR requires the maximum fuse rating for that branch to be _________. EL-0013 A. 15 amps B. 80% of the connected load C. 20 amps D. 30 amps
Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month
Last Answer : b) Once a year before monsoon*
Description : The Meeting of Board of Directors must be called at least once– (A) In four months (B) In three months (C) In two months (D) In one month
Last Answer : Answer: In three months
Description : If rubber goods are tested and inspected in house, the individual or individuals performing the tests must NOT test and certify their own personal protective equipment.?
Last Answer : True.
Description : During spring training, Ramon's doctor told him that he must drink exactly one quart of water for every 3 hours of training he put in. If Ramon drank 3 quarts of water each week during the 6 weeks of training, how many hours did he train?
Last Answer : Ramon trained 9 hours per week, totaling 54 hours of training for the full 6-week period.
Description : To check the three line fuses of a three-phase system consisting of a three-phase motor, you must _____________. A. place the starter in the 'stop' position B. make sure the motor is operating at full ... leads across the 'hot' ends of the fuses D. place the leads across the bottom ends of the fuses
Description : As part of a routine maintenance program for deck machinery, you should ___________. A. inspect electrical wiring and pushbutton switches for evidence of corrosion or burned insulation B. disassemble ... covers and ventilate as weather permits D. Check drum switch contact pressure every three months
Description : Mark correct option a) Director General’s circular are issue once in a month b) Each set of circulars should be kept in a guard book . c) In sub offices circular are signed by SPM and other official also d) All the above
Last Answer : d) All the above
Description : The Assistant Divisional Engineer should inspect the equipment at every manned level crossing on the subdivision once in a) 2 months b) 3 months c) 4 months d) 6 months*
Last Answer : d) 6 months
Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.
Last Answer : i) At least once in month*
Description : Which of the following point is noticed in Supdt dairy Gen 1 a) Each days' work and enter particular of his journey when on tour, showing clearly the name of every office, section or mail line ... in connection with irregularities and other matters d) All the above Ans:d 22. Mark the correct optio
Description : The insulation resistance of electric equipment and machinery should be tested for the lowest normal insulation values _____________. A. immediately after shutting down the machine B. every time the brush rigging is ... starting up the machine D. every 30 days whether the machine is in use or not
Description : Cleaning of electrical insulation should be _____________. A. done every six months B. accomplished every 12 months C. determined by need and not the calendar D. performed whenever the electrician is not otherwise busy
Description : Some months have 31 days, how many have 28? One month and that is February February, every 4 years. All months have (at least) 28 days None of the above
Last Answer : All months have (at least) 28 days
Description : I plunge but don't fall. I'm sharp but not smart. I'm disposable but lifesaving. What am I? -Riddles
Last Answer : A syringe.
Description : Competitive crops such as corn or soybean require weed-free period of a). 2 months b). 3-4 weeks c). 3 months d). None of the above