What will be the estimated annual gold production of saindak project? A. 2.5 tonnes B. 2 tonnes C. 0.98 Tonnes D. 1.5 tonnes

1 Answer

Answer :

ANSWER: D

Related questions

Description : What will be the estimated annual gold production of saindak project? A. 2.5 tonnes B. 2 tonnes C. 0.98 Tonnes D. 1.5 tonnes

Last Answer : ANSWER: D

Description : What is the annual estimated silver production of saindak project? A. 2.75 tonnes B. 3 tonnes C. 3.2 tonnes D. 3.85 tonnes

Last Answer : ANSWER: A

Description : What is the annual estimated silver production of saindak project? A. 2.75 tonnes B. 3 tonnes C. 3.2 tonnes D. 3.85 tonnes

Last Answer : ANSWER: A

Description : What will be the estimated annual production of copper at saindak project? A. 16000 tones B. 17000 tones C. 18000 tones D. 19000 tones

Last Answer : ANSWER: C

Description : 66 What will be the estimated annual production of copper at saindak project? A. 16000 tones B. 17000 tones C. 18000 tones D. 19000 tones

Last Answer : ANSWER: C

Description : What is the annual production in tones of marble in Pakistan? A. 591800 tonnes B. 760000 tonnes C. 672000 tonnes D. None of bove

Last Answer : ANSWER: A

Description : What is the annual rock salt production in tonnes in Pakistan? A. 1375 Thousand B. 1298 Thousand C. 975 Thousand D. 610 Thousand 75

Last Answer : ANSWER: B

Description : What is the annual rock salt production in tonnes in Pakistan? A. 1375 Thousand B. 1298 Thousand C. 975 Thousand D. 610 Thousand

Last Answer : ANSWER: B

Description : What is the annual production in tones of marble in Pakistan? A. 591800 tonnes B. 760000 tonnes C. 672000 tonnes D. None of bove

Last Answer : ANSWER: A

Description : The deposits of copper, gold and silver have been discovered at _____. A. Dakhni B. Saindak C. Dadhak D. Aghari

Last Answer : ANSWER: B

Description : The deposits of copper, gold and silver have been discovered at _____. A. Dakhni B. Saindak C. Dadhak D. Aghari

Last Answer : ANSWER: B

Description : An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage value of Rs. 50,000. What uniform annual amount must be set aside at the end of each of the 10 years for replacement if ... years is 0.069? (A) Rs. 31050 (B) Rs. 34500 (C) Rs. 37950 (D) Rs. 5000

Last Answer : (A) Rs. 31050

Description : ____________, which is included in the project cost, is estimated on the basis of the year when the enterprise breaks even. A. working capital B. cost of capital C. cost of production D. cost of equity

Last Answer : A. working capital

Description : The average agricultural production from irrigated area is: (a) 1/8 tonnes/ha (b) 2.0 tonnes/ha(c) 2.4 tonnes/ha (d) 2-8 tonnes/ha

Last Answer : (c) 2.4 tonnes/ha

Description : How many tonnes of gold dust did indus valley ruler pay to the Persian?

Last Answer : Need answer

Description : why Novelty Chemicals bought a Motor Vehicle for$110,000 on January 5, 2016. The estimated usefullife of the vehicle is ten years. The disposal valueis estimated at $10,000. Annual depreciation is onthe straight line method?

Last Answer : Novelty Chemicals bought a Motor Vehicle for$110,000 on January 5, 2016. The estimated usefullife of the vehicle is ten years. The disposal valueis estimated at $10,000. Annual ... for annualdepreciation.d) The Balance Sheet extracts for motor vehicle and itsrelated depreciation.full question

Description : A reactor having a salvage value of Rs. 10000 is estimated to have a service life of 10 years. The annual interest rate is 10%. The original cost of the reactor was Rs. 80000. The book value of the reactor after 5 years ... method will be Rs. (A) 40,096 (B) 43,196 (C) 53,196 (D) 60,196

Last Answer : D) 60,196

Description : Age of a tree can be estimated by (a) number of annual rings (b) diameter of its heartwood (c) its height and girth (d) biomass.

Last Answer : (a) number of annual rings

Description : The respective storm totals at three surrounding stations A, B and C are 110, 90 and 70 mm. If the normal annual precipitation amounts at stations X, A, B and C are respectively 1000, 1100, 1200 and 1250 mm, the estimated storm precipitation at X is (A) 75 mm (B) 77 mm (C) 79 mm

Last Answer : Answer: Option B

Description : The energy consumption and production patterns in a chemical plant over a 9 month period is provided in  the table below; Month 1 2 3 4 5 6 7 8 9 Production in Tonnes / month 493 ... and give your inference on the  result ? ( consider 9 month data for evaluation for predicted energy consumption)

Last Answer : It is required to use the equations Y= mX + C and  nC + mΣX = ΣY  cΣX + mΣX2 = ΣXY Month X =  Production in  Tonnes /  month Y =Energy  Consumption MWh  /month  X 2 XY 1 493 78.2 ... 73.7 54756 17240.63 8 239 64.4 57121 15402.96 9 239 72.1 57121 17228.98 3387 665.3 1410683 253221

Description : 98.Monitoring and targeting programs have been so effective that they show typical reductions in annual energy cost in the various industrial sectors between………. a. 10 to 30 % c. 5 to 20% b. 5 to 10 % d. 5 to 30%

Last Answer : 5 to 20%

Description : In respect of total foodgrains production during 2007-08 in India, which is correct in production (million tonnes) ? (A) 230•67 (B) 207•00 (C) 217•85 (D) 200•00 (E) None of these

Last Answer : (C) 217•85

Description : If the production of a factory grows at a 16% p.a., what will be its production for the year 2016 if its production in 2014 was 140 lakh tonnes? a) 222.734 b) 149.597 c) 188.384 d) 28 3.812 e) 180.534

Last Answer : Answer: C Required Production=140(1 + 16/100)2 lakh tones  =140(1 + 4/25)2  =140((25 + 4) /25)²  =140(29/25)²  =140(1.16)²  =140×1.3456  =188.384 lakh tonnes

Description : The following graph represents the installed capacity for cement production (in tonnes) and the actual production (in tonnes) of nine cement plants of a cement company. Capacity utilization of a plant ... difference between total production of large plants and small plants, in tonnes is _____

Last Answer : Correct answer is 120.

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 10 person-months for a systems project where the planning phase was completed in 7.5 person-months.

Last Answer : Ans: True

Description : Estimates of a water supply project depends upon the rate of water supply per capita consumption and probable population estimated at the end of the design period of (A) 5 to 10 years (B) 10 to 15 years (C) 15 to 20 years (D) 20 to 30 years

Last Answer : (D) 20 to 30 years

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : The probability of completing the project can be estimated based  upon the . (A)Uniform distribution curve (B)Normal distribution curve. (C)U-shaped distribution curve (D)None of the above

Last Answer : (B)Normal distribution curve.

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 25 person-months for a systems project where the planning phase was completed in 30 person-months.

Last Answer : Ans: False

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : Function points are used to measure the estimated _____ of a project.  a. complexity  b. effort required  c. program size  d. time required

Last Answer : c. program size

Description : The estimated benefits from a capital budgeting project are expected as cash flows rather than income flows because . A. it is more difficult to calculate income flows than cash flows B. it ... is central to the firm's capital budgeting decision C. this is required by the accounting profession

Last Answer : B. it is cash, not accounting income, that is central to the firm's capital budgeting decision

Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders

Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost

Description : A software project was estimated at 352 Function Points (FP). A four person team will be assigned to this project consisting of an architect, two programmers, and a tester. The salary of the architect is Rs.80,000 per month, the ... ) Rs.28,16,000 (2) Rs.20,90,000 (3) Rs.26,95,000 (4) Rs.27,50,000

Last Answer : (4) Rs.27,50,000 

Description : A cannon of weight 10 tonnes fires a shell of 50 kg with a muzzle velocity of 900 m/sec at an angle of 30?. The time taken for the shell to emerge from the barrel is 0.004 sec. The velocity of the cannon would be a.3.9 m/sec b.7.8 m/sec c.8.95 m/sec d.1.95 m/sec e.5.85 m/sec

Last Answer : a. 3.9 m/sec

Description : The moving parts of a machine which weigh 1 tonne perform vertical simple harmonic motion with an amplitude of 2.5 cm and a period of 0.5 sec. The base of the machine weighs 3 tonnes and rests on the ground. Maximum ... would be a.3.6 tonnes b.2.4 tonnes c.4.0 tonnes d.4.8 tonnes e.4.4 tonnes

Last Answer : e. 4.4 tonnes

Description : A locomotive of weight 100 tonnes is attached to train of wagons weighing 1000 tonnes. The locomotive pulls the wagons with a constant velocity of 36 km/hour. When the coupling between the train and wagons breaks, the wagons roll on 95 m in ... would be a.0.36 m b.0.44 m c.0.77 m. d.0.5 m e.0.66 m

Last Answer : d. 0.5 m

Description : The length of a column, having a uniform circular cross-section of 7.5 cm diameter and whose ends are hinged, is 5 m. If the value of E for the material is 2100 tonnes/cm2 , the permissible maximum crippling load will be (A) 1.288 tonnes (B) 12.88 (C) 128.8 tonnes (D) 288.0

Last Answer : (B) 12.88

Description : A short, hollow cast iron cylinder with a wall thickness of 1 cm is to carry a compressive load of 10 tonnes. If the working stress in compression is 800 kg/cm2, the outside diameter of the cylinder should not be less than a) 0.5cm b) 5 cm c) 2.5cm d) 4.5 cm

Last Answer : b) 5 cm

Description : The length of a column, having a uniform circular cross-section of 7.5 cm diameter and whose endsare hinged, is 5 m. If the value of E for the material is 2100 tonnes/cm2, the permissible maximumcrippling load will be (a) 1.288 tonnes (b) 12.88 (c) 128.8 tonnes (d) 288.0

Last Answer : (b) 12.88

Description : In agricultural sector net value added is estimated by A. Income method B. Expenditure method C. Production method D. All the three

Last Answer : C. Production method

Description : In agricultural sector net value added is estimated by (a) Income method ; (b) Expenditure method ; (c) Production method ; (d) All the three

Last Answer : ; (c) Production method ;

Description : A three hinged parabolic arch hinged at the crown and springing, has a horizontal span of 4.8 m  and a central rise of 1 m. It carries a uniformly distributed load of 0.75 tonne per metre over half  left hand span ... A) 10.8 tonnes  (B) 1.08 tonnes  (C) 1.8 tonnes  (D) 0.8 tonnes 

Last Answer : (B) 1.08 tonnes 

Description : The void ratio of a soil sample decreases from 1.50 to 1.25 when the pressure is increased from 25 tonnes/m2 to 50 tonnes/m2 , the coefficient of compressibility is (A) 0.01 (B) 0.02 (C) 0.05 (D) 0.001

Last Answer : (A) 0.01

Description : If the bearing capacity of soil is 10 tonnes/cm2 and the projection of plain concrete footing from walls, is a cm, the depth D of footing is (A) D = 0.0775 a (B) D = 0.775 a (C) D = 0.775 a (D) D = 0.775 a2

Last Answer : Answer: Option B

Description : Pick up the incorrect statement from the following: (A) Dimensions are measured to the nearest 0.01 m (B) Areas are measured to the nearest 0.01 sq.m (C) Cubic contents are measured to the nearest 0.1 cum (D) Weights are measured to the nearest 0.001 tonnes

Last Answer : (D) Weights are measured to the nearest 0.001 tonnes

Description : In above problem the resultant reaction between the cannon and the ground would be a.1146 tonnes b.573 tonnes c.286.5 tonnes d.50 tonnes e.145 tonnes

Last Answer : b. 573 tonnes