Preliminary project report for a road project must contain
(A) The detailed estimated cost based on detailed design
(B) The several alternatives of the project that have been considered
(C) The soil survey, traffic survey, concept design and approximate cost
(D) The contract documents for inviting tenders

1 Answer

Answer :

(C) The soil survey, traffic survey, concept design and approximate cost

Related questions

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : The first stage of deciding the alignment of a hill road, is (A) Reconnaissance (B) Detailed survey (C) Trace-out (D) Preliminary survey

Last Answer : Answer: Option A

Description : After inviting tenders for supply of raw materials, two quotations are received as follows- Supplier P Rs. 2.20 per unit, Supplier Q Rs. 2.10 per unit plus Rs. 2,000 fixed charges irrespective of the units ordered. The ... (a) 22,000 units (b) 20,000 units (c) 21,000 units (d) None of the above.

Last Answer : (b) 20,000 units

Description : First operation during the detailed survey of a hill road, is (A) Hydrological and soil surveys (B) Adjustment of alignment along with curves (C) Derivation of longitudinal and cross-sections (D) Fixation of Bench Marks

Last Answer : Answer: Option D

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : The most reliable estimate is (A) Detailed estimate (B) Preliminary estimate (C) Plinth area estimate (D) Cube rate estimate

Last Answer : (A) Detailed estimate

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : Estimates of a water supply project depends upon the rate of water supply per capita consumption and probable population estimated at the end of the design period of (A) 5 to 10 years (B) 10 to 15 years (C) 15 to 20 years (D) 20 to 30 years

Last Answer : (D) 20 to 30 years

Description : Energy audit can be classified as. a) Preliminary audit. c) Detailed audit. b) Both (a) and (b). d) Only option (a).

Last Answer : Both (a) and (b). 

Description : Energy audit can be classified as. a) Preliminary audit. b) Detailed audit. c) Both (a) and (b). d) Only option (a).

Last Answer : Both (a) and (b). 

Description : The is the simplest and quickest type of audit. a) Detailed audit. b) Energy audit. c) Preliminary audit

Last Answer :       <!-- [endif] -->Preliminary audit.

Description : A landscape designer uses many __________ in developing the preliminary design for a project. a. Perfect plans b. Bubble diagrams c. Site surveys d. Problem statements

Last Answer : Bubble diagrams

Description : Any postal article suspected to contain any goods of which the transmission by post is prohibited by or under any enactment for the time being in force is received for delivery at a post office: (A ... of the postal staff (D) The officer incharge shall send the postal article to RLO for disposa

Last Answer : (B) The officer incharge of the post office will issue notice to the addressee inviting him to attend post office and shall in his presence open and examine the postal articles

Description : In CRC based design, a CRC Team consists of : (a) one or two users representatives (b) several programmers (c) project co-ordinators (d) one or two system analysts Codes : (A) (a) and (c) (B) (a), (b), (c) and (d) (C) (a), (c) and (d) (D) (a), (b) and (d)

Last Answer : Answer: C

Description : Pick up the correct statement from the following: (A) Detailed survey is carried out for a strip of land about 30 m at sharp curves (B) Levels are taken along the trace cut at an interval of 20 m (C) Contour interval is generally adopted at 2 metres vertical interval (D) All the above

Last Answer : Answer: Option D

Description : A truck driver was walking on the opposite side of a road. He passed several traffic policemen but no one stopped him , why ?

Last Answer : Because then he is not with the truck. He was walking.

Description : Contract documentation is an input to both the Close Project and Contract Closure  processes. Contract documentation might include all of the following except for which  one?  A. Supporting documents B. Contract changes C. Financial documents D. Procurement audit documents

Last Answer : D. Procurement audit documents

Description : ) One of the initial project documents, issued by senior management, which outlines the  authority of the project manager, is called Project charter. As a seller, what other document can  be used in this place: 1. Work breakdown structure  2. Project scope  3. Contract  4. Internal memo

Last Answer : 3. Contract

Description : Project Scope: 1. is of concern only at the start of the project  2. is mainly a problem to be handled by the change control procedures during the project  execution phase.  3. Should ... . is usually not a problem after the contract or other document authorizing the project has been  approved.

Last Answer : 3. Should be managed and controlled from the project concept through close-out

Description : Which of the instruments is not used in Preliminary survey. (a) Theodelite (b) Tacheometer (c) Dumpy level (d) Plane table (e) None of them*

Last Answer : (e) None of them*

Description : A Unit Price (UP) contract provides: 1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the  contract progresses  2. a reimbursement of allowable cost of services ... unit rates and the  final price is dependent on the quantities needed to carry out the work.

Last Answer : 4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the  final price is dependent on the quantities needed to carry out the work

Description : Pre incorporation contract is also known as _________ A. Provisional B. Preliminary C. Illegal D. Legal

Last Answer : A. Provisional

Description : Once project planning is complete, project managers document their plan in A. SPMP document B. SRS document C. Detailed Design document D. Excel Sheet

Last Answer : A. SPMP document

Description : Earned value management integrates scope, cost, and schedule measures to:  A. assess project performance and progress.  B. develop a preliminary budget. C. assess communication effectiveness among project team members. D. assess whether all requirements were met.

Last Answer : A. assess project performance and progress.

Description : Which type of project cost estimate is the most accurate? 1. Preliminary  2. Definitive  3. Order of magnitude  4. Conceptual

Last Answer : 2. Definitive

Description : Pick up the correct statement from the following: (A) The directions of plumb lines suspended at different points in a survey are not strictly parallel (B) In surveys of small extent, the effect of ... of large extent, the effect of curvature of the earth must be considered (D) All the above

Last Answer : (D) All the above

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : The fundamental factor in the selection of pavement type is (A) Climatic condition (B) Type and intensity of traffic (C) Sub-grade soil and drainage conditions (D) Availability of funds for the construction project

Last Answer : Answer: Option B

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : The probability of completing the project can be estimated based  upon the . (A)Uniform distribution curve (B)Normal distribution curve. (C)U-shaped distribution curve (D)None of the above

Last Answer : (B)Normal distribution curve.

Description : Once the project is approved and moves into the planning stage, what happens  in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : What can you say about the following statements? I. XML tags are case-insensitive. II. In JavaScript, identifier names are case-sensitive. III. Cascading Style Sheets (CSS) cannot be used with XML. IV. All well-formed ... IV are false. (3) only I and III are false. (4) only II and IV are false. 

Last Answer : Answer: Marks to all

Description : The index map of preliminary report should be to a scale of (a) 1 cm to 0.5 km (b) 1 cm to 1.0 km (c) 1 cm to 2.5 km* (d) 1 cm to 10.0 km

Last Answer : (c) 1 cm to 2.5 km*

Description : Which of the following is not an example of formal communication? a. Contract b. email c. Project status report d. Status meeting

Last Answer : b. email

Description : Which of the following is not an example of formal communication? a. Contract b. email c. Project status report d. Status meeting

Last Answer : b. email

Description : Design of horizontal curves on highways, is based on (A) Design speed of vehicles (B) Permissible friction on the road surface (C) Permissible centrifugal ratio (D) All the above

Last Answer : Answer: Option D

Description : Summer milk has been estimated to contain 1.6 times as much vitamin __ as winter milk. a) Ab) B c) C d) D

Last Answer : a) A

Description : What sauce would you make/serve to dip chicken tenders into wrapped in basil and prosciutto?

Last Answer : Because I’m not having a particularly original kind of day, marinara with lots of parmesan is what comes to my mind first. I’m hoping that someone else will have a better thought. That dish sounds yummy!

Description : Where can I find recipes that include chicken tenders?

Last Answer : Chicken tenders are extremely versatile. You can fry them, grill them, boil them or even steam them if you like. They are very tender and taste delicious however they are cooked.

Description : The divisional supdt may sanction Rs ____ in each case for a period of three month only, for temporay arrangements for conveyance of mails without calling tenders a) 2500/- b) 30000/- c) 5000/- d) 10000

Last Answer : c) 5000/

Description : Currency notes and coins are called as: a) Flat money b) Legal tenders c) Fiat money d) Both b and c

Last Answer : d) Both b and c

Description : I want a new phone, but my contract with AT&T isnt over, What must i do to get the new phone? Do i report it stolen or Broken? HELP?

Last Answer : You wait for your upgrade, buy one online or buy one in store for full price. You have no insurance or warranty, bad move cupcake. Hysterical punctuation and caps makes you look silly and does not emphasize your points.

Description : Write the essential road characteristics to be considered in traffic engineering.

Last Answer : The essential road characteristics to be considered in traffic engineering are as follows: i) Gradient ii) Curve of road iii) Design speed iv) Friction between road and tyre surface

Description : Ms. Achla, works as a Programmer in a survey firm named “National Survey Foundation”. In her current project, she is supposed to design -Technology

Last Answer : S. No.Control used to inputControl1TRAINEE’S NAMETextField2TRAINING LOCATIONRadio Button/Combo Box3GRADE THE SESSION(Excellent, Good, Satisfactory, Unsatisfactory)Radio Button/Combo Box4SUGGESTIONSText Area

Description : .Prior to beginning the field work on a new audit engagement in which a CPA does not possess expertise in the industry in which the client operates, the CPA should a. Reduce audit risk by lowering ... the industry. d. Obtain a knowledge of matters that relates to the nature of the entity's business

Last Answer : Obtain a knowledge of matters that relates to the nature of the entity's business