Estimates of a water supply project depends upon the rate of water supply per capita
consumption and probable population estimated at the end of the design period of
(A) 5 to 10 years
(B) 10 to 15 years
(C) 15 to 20 years
(D) 20 to 30 years

1 Answer

Answer :

(D) 20 to 30 years

Related questions

Description : If V is total consumption of water in litres for a population of N individuals, per capita  consumption or water allowance for the water supply Q, is given by  (A) Q = V/12N (B) Q = V/24N (C) Q = V/265N (D) None of these

Last Answer : (C) Q = V/265N

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : For a given activity, the optimistic time, pessimistic time and the most probable estimates are 5, 17 and 8 days respectively, The expected time is (A) 8 days (B) 9 days (C) 10 days (D) 15 days

Last Answer : (B) 9 days

Description : The design flood commonly adopted in India for barrages and minor dams is (a) Probable maximum flood (b) A flood of 50 – 100 years return period (c) Peak flood (d) Standard project flood or a 100-year flood, whichever is higher

Last Answer : (d) Standard project flood or a 100-year flood, whichever is higher

Description : The supply of labour in the economy depends on - (1) Population (2) National income (3) Per capita income (4) Natural resources

Last Answer : (1) Population Explanation: The supply curve for labor depends on variables such as population, wage rates, etc. in developing countries, the vast population base explains the relatively lower wage ... accessibility to labour supply. This is just the opposite in the case of developed countries.

Description : The supply of labour in the economy depends on (1) Population (2) National income (3) Per capita income (4) Natural resources

Last Answer : Population

Description : An earth moving equipment costs Rs. 5,00,000 and has an estimated life of 10 years and a salvage value of Rs. 50,000. What uniform annual amount must be set aside at the end of each of the 10 years for replacement if ... years is 0.069? (A) Rs. 31050 (B) Rs. 34500 (C) Rs. 37950 (D) Rs. 5000

Last Answer : (A) Rs. 31050

Description : As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken (A) 1.80 litres for 5 to 10 users (B) 1.20 litres for 15 users (C) 1.35 for 20 users (D) All the above

Last Answer : (D) All the above

Description : The design period of sewage treatment works in normally A. 5 – 10 years B. 15 – 20 years C. 30 – 40 years D. 40 – 50 years

Last Answer : ANS: B

Description : An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is (A) Rs. 8,43,750 (B) Rs. 8,75,000 (C) Rs. 10,50,000 (D) Rs. 11,56,250

Last Answer : (A) Rs. 8,43,750

Description : A manufacture undertakes to supply 2000 pieces of a particular component at Rs.25 per piece. According to his estimates, even if 5% fail to pass the quality tests, then he will make a profit of 25%. However as it turned out, ... A. Rs 12,000 B. Rs 13,000 C. Rs 14,000 D. Rs 15,000 E. None f these

Last Answer : Answer - B. Rs 13,000 Explanation: 5% of 2000=100 so 2000-100=1900 so,if he sells 1900 he will get 25% profit cost per piece rs 25 so 25x 1900 don't solve here if 125% . ... /125=38000=CP if 50% rejected,only 1000 pieces sold so 1000 25=25000=SP loss=cp-sp= 38000-25000=13000

Description : For calculating the tractive force along an upgrade of an asphalt road, the most probable value of the co-efficient of traction resistance is assumed (A) 1/10 (B) 1/20 (C) 1/30 (D) 1/100

Last Answer : Answer: Option D

Description : The total domestic consumption in a city water supply, is assumed (A) 20 % (B) 30 % (C) 40 % (D) 60 %

Last Answer : (D) 60 %

Description : Preliminary project report for a road project must contain (A) The detailed estimated cost based on detailed design (B) The several alternatives of the project that have been considered (C ... , traffic survey, concept design and approximate cost (D) The contract documents for inviting tenders

Last Answer : (C) The soil survey, traffic survey, concept design and approximate cost

Description : Rate of flow of sewage is generally assumed A. More than the rate of water supply B. Equal to the rate of water supply C. Less than the rate of water supply D. At 150 litres per capita

Last Answer : ANS: D

Description : Dry weather flow is: A. Average daily rate of flow B. Average monthly rate of flow C. Average annual rate of flow D. Water supply allowance per capita

Last Answer : ANS: D

Description : The population of India is about 1.2 billion. Take the average consumption of energy per person per year in India as 30 Mega Joules. If this consumption is met by carbon based fuels and the rate of ... tons (B) 540 million metric tons (C) 5400 million metric tons (D) 2400 million metric tons 

Last Answer : (B) 540 million metric tons

Description : A machine is purchased for Rs. 10,000,00 and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000. The book value of the machine at the end of 5 years using general straight line method ... Rs. 4,75,000 (B) Rs. 5,75,000 (C) Rs. 6,50,000 (D) Rs. 8,50,000

Last Answer : (B) Rs. 5,75,000

Description : The per capita birth rate of a population is known as its: w) mortality x) natality (pron: nay-tal-eh-ty) y) population density z) carrying capacity

Last Answer : ANSWER: X -- NATALITY

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : A software project was estimated at 352 Function Points (FP). A four person team will be assigned to this project consisting of an architect, two programmers, and a tester. The salary of the architect is Rs.80,000 per month, the ... ) Rs.28,16,000 (2) Rs.20,90,000 (3) Rs.26,95,000 (4) Rs.27,50,000

Last Answer : (4) Rs.27,50,000 

Description : Most important method for calculating discharge for planning a water supply project, is  (A) Velocity area method  (B) Weir or spillway method  (C) Use of venturi-meter  (D) Using power plant consumption 

Last Answer : (A) Velocity area method

Description : If an animal consumes 15 L of oxygen every 30 minutes what is the rate of oxygen consumption in ml per minute?

Last Answer : Need answer

Last Answer : At present the per capita consumption of fish in the country is 30 kg.

Description : What is per capita Energy Consumption in Pakistan? A. 283 TOE B. 287 TOE C. 280 TOE D. 275 TOE

Last Answer : ANSWER: A

Description : What is per capita Energy Consumption in Pakistan? A. 283 TOE B. 287 TOE C. 280 TOE D. 275 TOE

Last Answer : ANSWER: A

Description : Poverty line is expressed in terms of an overall _______ A. Per capita Income B. Per Capita consumption expenditure C. Per Capita entertainment expenditure D. Per Capita development expenditure E. Per Capita GDP

Last Answer : B. Per Capita consumption expenditure Explanation: In India consumption-expenditure has been made the basis for the measurement of the minimum standard. The usual method is to fix a poverty level. This level is expressed in terms of an overall per capita consumption-expenditure.

Description : Energy consumption per unit of GDP is called as: a) Energy Ratio b) Energy intensity c) Per capita consumption d) None

Last Answer : Energy intensity

Description : 79 State true or false. Nordic countries consumption of energy per capita is among the highest in the world. a) True b) False

Last Answer : true

Description : At present, in terms of per capita energy consumption (kWh/year), identify the correct sequence. (A) Brazil > Russia > China > India (B) Russia > China > India > Brazil (C) Russia > China > Brazil > India (D) China > Russia > Brazil > India

Last Answer : (C) Russia > China > Brazil > India

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : The probability of completing the project can be estimated based  upon the . (A)Uniform distribution curve (B)Normal distribution curve. (C)U-shaped distribution curve (D)None of the above

Last Answer : (B)Normal distribution curve.

Description : The project schedule is used to determine all of the following except which one?  A. Cost estimates B. Activity start dates C. Float times D. Activity end dates

Last Answer : A. Cost estimates

Description : In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net ... load should not exceed (A) 10 mm (B) 15 mm (C) 20 mm (D) 25 mm

Last Answer : Answer: Option D

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description : A shaft 9 m long is subjected to a torque 30 t-m at a point 3 m distant from either end. The reactive torque at the nearer end will be (A) 5 tonnes metre (B) 10 tonnes metre (C) 15 tonnes metre (D) 20 tonnes metre

Last Answer : (D) 20 tonnes metre

Description : The period of long term plan for the development of roads in India, known as Bombay Plan (Aug. 1958), is (A) 5 years (B) 10 years (C) 15 years (D) 20 years

Last Answer : Answer: Option D

Description : Which one of the following would be the probable date of kidding for a she-goat that has been successfully serviced on First of March ? (All dates belong to the same year) (A) June 12 (B) July 29 (C) August 28 (D) September 15 (E) May 30

Last Answer : (C) August 28

Description : As a result of wrong use of tooth brush the patients MOST probable complaint will be, A. Spontaneous pain or discomfort B. Occasional pain during brushing of the teeth C. Occasional pain during consumption of sweets

Last Answer : C. Occasional pain during consumption of sweets

Description : What would be the most probable date of giving the delivery of one day old chicks by a hatchery farmer, who has put the fertile eggs of hen on his well functioning incubator on First of January ? (A) February 20 (B) February 5 (C) January 29 (D) January 22 (E) January 15

Last Answer : (C) January 29

Description : As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is (A) 10 Lux (B) 15 Lux (C) 20 Lux (D) 30 Lux

Last Answer : Answer: Option D

Description : If the price of burger rises from `12 per piece to `20 per piece as a result of which the daily sales decreases from 300 to 200 pieces per day. The price elasticity of demand can be estimated as (a) 0.5 ; (b) 0.8 ; (c) 0.25 ; (d) 2.10

Last Answer : (a) 0.5 ;

Description : Using typical industry standards for estimating project time schedules, the estimated  analysis phase would be 25 person-months for a systems project where the planning phase was completed in 30 person-months.

Last Answer : Ans: False

Description : . When estimating project time schedules using industry standards, the estimated  project completion time for a systems project would be _____ person-months if the actual  planning phase were completed in 6 person-months.  a. 30  b. 40  c. 17.14  d. 9  e. 50

Last Answer : b. 40

Description : Which of the following results by dividing national income by size of population? (1) Per capita income (2) Subsistence level (3) Subsistence expenditure- (4) Per capita production

Last Answer : (1) Per capita income Explanation: Per capita income or average income or income per person is a measure of mean income within an economic aggregate, such as a country or city. It is calculated by ... in the aggregate (such as GDP or Gross National Income) and dividing it by the total population.

Description : Which is the parameter for the economic development? (1) Per capita monetary income (2) National income (3) Per capita rural income (4) Population

Last Answer : (1) Per capita monetary income Explanation: A majority of economists such as Simon Kuznets, Meter and Baldwin, Hicks D. Samuelson, Pigeon and others consider national income as the most suitable ... economic growth is meaningless if it does not improve the standard of living of the common masses.

Description : An underdeveloped economy is characterized by A. High per capita real income B. Large proportion of labor force in the tertiary sector C. State of deprivation of large proportion of population D. All the above

Last Answer : C. State of deprivation of large proportion of population

Description : An underdeveloped economy is characterized by A. High per capita real income B. Large proportion of labor force in the tertiary sector C. State of deprivation of large proportion of population D. All the above

Last Answer : C. State of deprivation of large proportion of population