How many days did it take to build the raft?

1 Answer

Answer :

four

Related questions

Description : How to Build a Raft

Last Answer : How to Build a Raft A raft is a perfect substitute for a fisher who does not have access to a boat. Materials Required Something to cut the wood with (a hatchet) Logs (spruce is recommended) Heavy ... look when compared to a plain raft. However, the danger is that leaves can get slippery when wet.

Description : A good tree for raft building?

Last Answer : drift wood?

Description : Where can i rent a whitewater raft in toronto or buy a used one?

Last Answer : craigslist!!!

Description : Imagine you are on a sinking raft in the middle of the Pacific with great white sharks surrounding you. How do you stop this predicament? -Riddles

Last Answer : Stop imagining!

Description : is raft concrete or abstract noun?

Last Answer : raft concrete

Description : What is the meaning of the word raft ?

Last Answer : raft , floating piece of wood ,

Description : If a raft drifted on the gulf stream begining in Florida were might it reach land?

Last Answer : Need answer

Description : If a raft drifted on the Gulf Stream beginning in Florida where might it reach land.?

Last Answer : toward Europe

Description : What did Huck find when he landed the raft?

Last Answer : Feel Free to Answer

Description : How do you keep a raft from tipping?

Last Answer : Need answer

Description : What is the principle of a life Jacket'? (1) It provides oxygen to a drowning person (2) It increases the volume of the person to keep him afloat (3) It decreases the volume of the person to keep him afloat (4) The person can sit on it like a raft

Last Answer : (2) It increases the volume of the person to keep him afloat Explanation: The upward-pushing force that keeps things afloat is called buoyancy. For an object to float it must be able to equal ... a person, it acts to significantly increase their volume for only a very small increase in their mass.

Description : A raft foundation is provided if its area exceeds the plan area of the building by (A) 10 % (B) 20 % (C) 40 % (D) 50 %

Last Answer : Answer: Option D

Description : For a number of columns constructed in a rcjw, the type of foundation provided, is (A) Footing (B) Raft (C) Strap (D) Strip

Last Answer : Answer: Option D

Description : To support a heavy structure in sandy soil, the type of foundation generally used, is (A) Combined footing (B) Raft footing (C) Pier footing (D) Strap footing

Last Answer : Answer: Option C

Description : The foundation in which a cantilever beam is provided to join two footings, is known as (A) Strip footing (B) Strap footing (C) Combined footing (D) Raft footing

Last Answer : Answer: Option B

Description : The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than (A) The column spacing (B) One-third the column spacing (C) Half the column spacing (D) Three-fourth the column spacing

Last Answer : Answer: Option B

Description : Raft foundations are used for: (A) Providing increased area of foundation over poor bearing capacity of soil (B) Spanning over small soft or loose pockets (C) Counter acting the hydrostatic effect (D) All the above

Last Answer : Answer: Option D

Description : For providing a raft foundation, the following activities are involved 1. Ramming the foundation bed 2. Excavation of the soil upto required depth 3. Laying the reinforcement over the foundation bed 4. Curing the cement concrete placed over ... 2, 1 (C) 2, 1, 3, 5, 4 (D) 3, 2, 5, 1, 4

Last Answer : Answer: Option C

Description : The maximum total settlement for raft foundation on clayey soils should be limited to (A) 25 mm (B) 25 to 40 mm (C) 40 to 65 mm (D) 65 to 100 mm

Last Answer : Answer: Option D

Description : While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: (A) Pile formation (B) Raft foundation (C) Grillage foundation (D) None of these

Last Answer : Answer: Option B

Description : For the construction of flyovers in sandy soils, the type of foundation provided, is (A) Strap footing (B) Raft footing (C) Combined footing (D) Pier footing

Last Answer : Answer: Option D

Description : The raft slab is projected beyond the outer walls of the structure by (A) 5 to 10 cm (B) 15 to 20 cm (C) 25 to 30 cm (D) 30 to 45 cm

Last Answer : Answer: Option D

Description : The type of footing which is used to transmit heavy loads through steel columns is (A) Raft foundation (B) Grillage foundation (C) Well foundation (D) Isolated footing

Last Answer : Option B

Description : Raft foundation are generally preferred to when the area required for individual footing, is more than (A) 25% to total area (B) 30% of total area (C) 40% to total area (D) 50% of total area

Last Answer : Option D

Description : The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as (A) Combined footing (B) Strap footing (C) Raft footing (D) None of these

Last Answer : Option C

Description : In soils possessing low bearing capacity, the type of foundation generally provided, is (A) Column footing (B) Grillage footing (C) Raft footing (D) All the above

Last Answer : Option D

Description : raft increases with increase in forward speed for most of the implement, mainly due to a) More rapid acceleration of any soil particles that is moved appreciably b) More working width c) Increased working depth d) Draft decreases with increase in speed of implement

Last Answer : a) More rapid acceleration of any soil particles that is moved appreciably

Description : One of the following is a shallow foundation a) Pile foundation b) Raft foundation* c) Under reamed pile foundation d) Well foundation

Last Answer : b) Raft foundation*

Description : Explain raft foundation with neat sketch and explain its suitability. 

Last Answer : Raft Footing: It is suitable where ground is soft. Clayey or marshy having low bearing capacity, and where sub soil water conditions are uncertain. The raft foundation is also used to reduce settlement below highly compressible soils

Description : State the necessity of providing (i) Combined column footing and (ii) Raft foundation

Last Answer : (i) Combined column footing:- A combined footing provided as a column for two or more columns in a row. Combine footing is also provided when the columns are very near to each other and ... total individual footing area of all columns exceeds 50% of built up area of building at ground floor.

Description : What is the principle of a ‘Life Jacket’? (1) It provides oxygen to a drowning person (2) It increases the volume of the person to keep him afloat (3) It decreases the volume of the person to keep him afloat (4) The person can sit on it like a raft

Last Answer : It increases the volume of the person to keep him afloat

Description : Suggest suitable situation for Raft foundation and Pile foundation.

Last Answer : Suitability of Raft foundation:  1) Where the allowable bearing capacity of soil is less or the bridge load is heavy. 2) Where the hard soil is not available within 1.5m to 2.5m below the ... heavy scouring of river bed is expected. 4) Where heavy concentrated loads are to be taken by foundation.

Description : Can a house be built on a grave ? My question is , will it be legal to build a house on top of a grave that is many days old or a few days old ?

Last Answer : It is illegal and reprehensible to build a house on a grave. The gravediggers are insulted by this act. Even sitting on a grave is a heinous act. The Prophet (peace and blessings of Allaah be upon ... Albahroor Rayek 2/195 ; Fatawa Tatarkhania 2/165 ; Fatawa Bayaziyah ; Majmoo 'Fatawa 22 / 194-95)

Description : A can build up a wall in 8 days while B can break it in 3 days. A has worked for 4 days and then B joined to work with A for another 2 days only. In how many days will A alone build up the remaining part of the wall? a) 13/3 days b) 22/3 days c) 7/4 days d) 7 days e) None of these

Last Answer : Amount of work done by A in one day = 1/8th of the total work B can break 1/3rd of the work in one day Therefore, if both of them are working together then the work done in one day = 1/8 - 1/3 = -5/24 ... = 11/12 Time taken by A to finish 11/12th of the work = 11/12 8 = 22/3 days Answer: b)