How many stages on one off new installation will be carried out?

1 Answer

Answer :

two

Related questions

Description : estimating on one off new installations will be carried out in how many stages?

Last Answer : two

Description : What is the role of an occupier of a major accident hazard installation in preparation of off-site emergency plan?

Last Answer : An occupier of a major accident hazard installation has to provide such information relating to industrial activity under his control to the concerned authority i.e. the District Emergency Authority/ ... required including the nature, extent and likely effects of site of possible major accident. 

Description : Pick out the wrong statement. (A) Cellulose acetate membranes are used in dialysis process (B) Elutriation process refers to when the soluble material is largely concentrated on the surface of an ... that various streamflow from one to another (D) Zirconia probe is used for the humidity measurement

Last Answer : (D) Zirconia probe is used for the humidity measurement

Description : Clipping off the top of rice seedlings containing immature stages of insects reduces the carry over of infestation of

Last Answer : Ans. Rice hispa (2) Wheat

Description : I was carried into a dark room, and set on fire. I wept, and then my head was cut off. What am I? -Riddles

Last Answer : A Candle.

Description : Pick up the incorrect statement from the following: A. The mixture of water and waste products, is called sewage B. The treated sewage effluents, are generally used for irrigating the ... is called sewerage D. The old convergence system was definitely better than water carried sewerage system

Last Answer : ANS: D

Description : A voltmeter located on a control panel has been operating correctly for six months, suddenly burns out. After removing it, it is found that neither side of the meter has been grounded. When ... side and the ground C. installed exactly as the old installation D. grounded to the positive side

Last Answer : Answer: C

Description : Should the government pay for or at least subsidize the installation of new hot water heaters?

Last Answer : answer:That is more on the last mile end of energy conservation of things. While it would make sense, it's also a costly undertaking. A water heater may only be $250 but how many millions ... only see someplace like the EU. We are too stuck in the 19th century to do something that progressive.

Description : When buying a new car, would you recommend aftermarket leather installation?

Last Answer : answer:It all up to the upholster that’s doing the install. It could good or bad. The stretch can be baggy. Should include all surfaces, armrest, console…. It will cost them a thousand dollars or more to do.

Description : New laptop came with DVD installation disk but no DVD drive. Advice?

Last Answer : It’s a kind of cruel joke. What they’ll want you to do now is buy the external DVD drive.

Description : What files do I need to copy if I transfer Windows 7 from laptop to pendrive ,for later installation on new HDD ?

Last Answer : It’s not possible to copy an installation of windows like that. You can make an image of the c drive to an external HD and then copy the image back to the new drive when it is installed.

Description : Why my linux mint cinnamon new installation is slower than booting from usb?

Last Answer : It seems like your linux installation is using memory swapping to disk space allotted to swap area which is making RAM 'useless'. Even if you got 2GB memory the swap area is the culprit here. So ... =10 Then save the file and reboot your system. Now your linux mint installation will be blazing fast.

Description : In case new installation is to be done, what basic guidelines should be followed for grounding?

Last Answer : a. Earthing conductors in outdoor areas shall be burried 500 mm below finished grade level unless stated otherwise.  b. Minimum 6000 mm spacing between rod pipe electrode shall be provided unless ... pipe or plate electrode treated earth pit, which in turn shall be connected to station earthing.  

Description : In a heat treatment shop, steel components are heat-treated in batches of 80 Tons. The  heat treatment cycle is as follows;  Increase temperature from 30 OC to 850 OC in 3 hours.  ... efficiency of 80%, for same requirement. The investment towards installation of  the new furnace is Rs. 50

Last Answer : Quantity of steel treated per batch - 80 Tons a. Efficiency of Furnace: Useful heat supplied to steel - 80000 x 0.12 x (850 - 30)   = 7872000 kcal/batch .1 mark Total heat ... = Rs. 64400/batch Efficiency of new LPG furnace - 80% Heat supplied in new LPG furnace - 7872000/0.8

Description : When a company reviews sales, costs, and profit projections for a new product to find out whether these factors satisfy the company's objectives, they are in which of the following new ... testing 2. Commercialization 3. Business analysis 4. Marketing strategy development 5. none of these

Last Answer : Business analysis