____________ is a graphical representation of the various activity and event relating to a
project.
A. Network analysis.
B. Scheduling technique.
C. Logical Model.
D. Network Diagram

1 Answer

Answer :

D. Network Diagram

Related questions

Description : _____________ is used to accomplish the project economically in the minimum available time with limited resources A. Project Scheduling. B. Network Analysis. C. Budget Analysis. D. Critical Planning.

Last Answer : A. Project Scheduling.

Description : ____________ is primarily concerned with the identification of the project demand potential and the selection of the optimal technology. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : A. Techno-economic analysis.

Description : _____________ refers to some action which is a time consuming effort necessary to complete a specific event. A. A Network. B. An Activity. C. An Event. D. A Node.

Last Answer : B. An Activity.

Description : The technique for establishing and maintaining priorities among the various jobs of a project, is known (A) Event flow scheduling technique (B) Critical ratio scheduling (C) Slotting technique for scheduling (D) Short interval scheduling

Last Answer : (B) Critical ratio scheduling

Description : EST stands for ____________. A. Earliest Start Time. B. Event Start Time. C. Effective Start Time. D. Essential Start Time.

Last Answer : A. Earliest Start Time.

Description : ____________, which is included in the project cost, is estimated on the basis of the year when the enterprise breaks even. A. working capital B. cost of capital C. cost of production D. cost of equity

Last Answer : A. working capital

Description : The process of preparing an inventory of skills needed for effective implementation of the project is called as ____________. A. Economic viability. B. Financial feasibility. C. Technical feasibility. D. Managerial competence.

Last Answer : D. Managerial competence.

Description : Which of the following factors should not be included in PESTLE analysis? A. Government re-cycling policy. B. Proposed reduction in interest rates. C. Competitor activity. D. Demographic changes.

Last Answer : C. Competitor activity.

Description : _____________ may be defined as the excess of present value of project cash inflows over that of out flows. A. Net present value technique. B. Average rate of return. C. Benefit-Cost ratio. D. Internal rate of return

Last Answer : A. Net present value technique.

Description : ______________ describes the direction, the enterprise is going in, what its goals are, where it wants to be,and how it is going to get there. A. project report B. technical anlaysis C. market analysis D. financial analysis

Last Answer : A. project report

Description : Project mission and objectives, procedures and systems used, and organization resources used typically appear in the _____ section of the final project report. A. Analysis B. Recommendation C. lessons learned D. financial feasibility

Last Answer : A. Analysis

Description : _____________ is primarily concerned with the identification, qualification and evaluation of the project resources. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : B.Feasibility analysis.

Description : ______________ is the analysis of costs and benefits of a proposed project with the goal of assuming a rational allocation of limited funds. A. Project formulation. B. Project evaluation. C. Project appraisal . D. Project Design.

Last Answer : C. Project appraisal .

Description : Additional time which a non-critical activity can consume without increasing the project duration is called _____________. A. Total Float. B. Free Float C. Independent Float. D. Dependant Float

Last Answer : A. Total Float.

Description : …………. represent graphical representation of various files and programs of an operating system. -Technology

Last Answer : Icons represent graphical representation of various files and programs of an operating system.

Description : …………. represent graphical representation of various files and programs of an operating system. -Technology

Last Answer : Recycle Binrepresent graphical representation of various files and programs of an operating system.

Description : Pick up the correct statement from the following: (A) A graphical representation of spectral reflectance verses the various growth stages of a crop, depicts a phonologic pattern B) The changes in ... characteristic of the object which helps in the identification of the object (D) All of these

Last Answer : Answer: Option D

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : The graphical representation of variation of axial load on y axis and position of cross section along x axis is called as _____ (a) Bending moment diagram (b) Shear force diagram (c) Stress-strain diagram (d) Trust diagram

Last Answer : (d) Trust diagram

Description : a. SAN generates as action potential which stimulates atrial systole. b. ECG is an electrical representation of the graphical activity of the heart du

Last Answer : a. SAN generates as action potential which stimulates atrial systole. b. ECG is an electrical ... one of the main symptoms of this disease.

Description : a. SAN generates as action potential which stimulates atrial systole. b. ECG is an electrical representation of the graphical activity of the heart du

Last Answer : a. SAN generates as action potential which stimulates atrial systole. b. ECG is an electrical ... one of the main symptoms of this disease.

Description : While scheduling a project by C.P.M. (A) A project is divided into various activities (B) Required time for each activity is established (C) Net work is drawn by connecting the activities and the events (D) All the above

Last Answer : (D) All the above

Description : The Markets and Competitors section of a business plan should contain ____________. A. A statement of the target market. B. The size of each market segment. C. The key characteristics of buyers in each business segment. D. All the above.

Last Answer : a

Description : O & M refers to ____________ A. overall efficiency of business. B. efficiency of office and administrative work. C. office work measurement. D. office and management study.

Last Answer : D. office and management study.

Description : District Industries Centres are located ____________. A. in each district. B. in each state. C. only in selected districts. D. only in selected states.

Last Answer : A. in each district.

Description : The type of diversification in which the company adds up same type of products at the same level of production is ____________. A. conglomerate diversification. B. horizontal integration. C. vertical integration. D. concentric integration.

Last Answer : B. horizontal integration.

Description : A commercial banker would prefer a ____________ debt-equity ratio over the years as it indicates financial strength of a unit. A. Declining. B. Increasing. C. Stable. D. Fluctuating.

Last Answer : A. Declining A commercial banker would prefer a declining debt-equity ratio over the years as it indicates the financial strength of a unit. A declining debt-equity ratio means that the company ... fluctuating ratio might indicate that the company is not able to manage its debt and equity properly.

Description : __________________ is a problem -solving technique designed to produce numerous ideas in a short period A. Synectics. B. Delphi technique. C. Brain storming. D. Nominal group technique.

Last Answer : C. Brain storming.

Description : _____________ is an event-oriented approach . A. CPM. B. GERT. C. PERT. D. WASP.

Last Answer : 1

Description : Activities which must be finished before a given event can occur are termed as _________. A. Preceeding Activities. B. Succeeding Activities C. Concurrent Activities D. Dummy Activities.

Last Answer : A. Preceeding Activities.

Description : Industry analysis should include information on – a) Market size of competitor’s product b) Growth rate of suppliers c) New product entry d) Economic conditions

Last Answer : d) Economic conditions

Description : Swot Analysis is a _____________ tool A. Conceptual B. Modern C. Scientific D. Traditional

Last Answer : A. Conceptual

Description : The content of the final report typically includes the following topics __________. A. Executive summary B. review and analysis C. recommendations D. If all the above are correct.

Last Answer : D. If all the above are correct.

Description : The 'T' in a PESTLE analysis refers to ___________. A. Time. B. Technology. C. Training. D. Talent.

Last Answer : B. Technology.

Description : Which of the following is a recognized disadvantage of setting up as a start-up as compared with other routes to market entry? A. less satisfaction of the owners. B. less help from various agencies. C. there are more funds required. D. there is a high failure rate.

Last Answer : D. there is a high failure rate.

Description : The activity which occurs when the new venture is started is called - a) Motivation b) Business skills c) Departure point d) Goal orientation

Last Answer : c) Departure point

Description : ______________ is an activity-oriented approach. A. CPM B. PERT C. GERT D. WASP

Last Answer : A. CPM

Description : ……………….. Shows the process of creating something new. a) Innovation b) Business model c) Modeling d) Creative flexibility

Last Answer : a) Innovation

Description : Which one of the following is not considered as one of the building blocks of the model entrepreneur? A. technical skills. B. management competencies. C. business awareness. D. personal attributes.

Last Answer : C. business awareness.

Description : Every entrepreneur should draw an _______ for his project to ensure the timely completion of all activities involved in setting up an enterprise. A. cost structure B. implementation plan C. market structure D. production structure

Last Answer : B. implementation plan

Description : market potential of the project report includes ________. A. demand and supply conditions B. market strategy C. after sales service D. all the above

Last Answer : D. all the above

Description : what are the components of then project report ________. A. requirement of funds B. location C. manpower D. all the above

Last Answer : All

Description : Integration of project management with the organization takes place with the _______________. A. master budjet B. strategic plan C. Process of managing actual projects D. both b and c

Last Answer : D. both b and c

Description : Project management is ideally suited for a business environment requiring all of the following except _________. A. Flexibility B. Innovation C. speed D. Repetability

Last Answer : A. Flexibility

Description : Which of the following is not considered to be a characteristic of a project? A. An established objective B. Complex tasks C. A clear beginning and end D. Only for internal use

Last Answer : D. Only for internal use

Description : The minimum amount of------------------,irrespective of such private participation,could be specified at a minimum 17.5 per cent of project costs by lending institutions. A. bank loans B. promotors contribution C. fixed capital D. working capital

Last Answer : B. promotors contribution

Description : A project, which may not add to the existing profits, should be financed by _________ A. debentures. B. preference share capital. C. equity capital. D. public deposits.

Last Answer : A. debentures.

Description : Underestimation of project cost leads to ___________. A. Time under run. B. Cost under run C. Time over run. D. Cost over run

Last Answer : D. Cost over run

Description : __________________ is the systematic development of a project idea for the eventual purpose of arriving at an investment decision. A. Project identification. B. Project formulation. C. Project feasibility. D. Project evaluation.

Last Answer : B. Project formulation.

Description : PERT stands for __________. A. Programme Evaluation and Research Techniques. B. Project Evaluation and Review Techniques. C. Programme Evaluation and Review Techniques. D. Project Evaluation and Research Techniques.

Last Answer : C. Programme Evaluation and Review Techniques.