_____________ is used to accomplish the project economically in the minimum available
time with limited resources
A. Project Scheduling.
B. Network Analysis.
C. Budget Analysis.
D. Critical Planning.

1 Answer

Answer :

A. Project Scheduling.

Related questions

Description : ____________ is a graphical representation of the various activity and event relating to a project. A. Network analysis. B. Scheduling technique. C. Logical Model. D. Network Diagram

Last Answer : D. Network Diagram

Description : _____________ is primarily concerned with the identification, qualification and evaluation of the project resources. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : B.Feasibility analysis.

Description : Additional time which a non-critical activity can consume without increasing the project duration is called _____________. A. Total Float. B. Free Float C. Independent Float. D. Dependant Float

Last Answer : A. Total Float.

Description : ______________ is the analysis of costs and benefits of a proposed project with the goal of assuming a rational allocation of limited funds. A. Project formulation. B. Project evaluation. C. Project appraisal . D. Project Design.

Last Answer : C. Project appraisal .

Description : According to the PMBOK guide which of the following statements is right in terms  of using reserve analysis to determine a project budget ? a. Reserve analysis always plans contingency reserves ... not practical. e. Contingency reserves have never been a concern when planning a project budget.

Last Answer : . Reserve analysis always plans contingency reserves for unexpected project scope and  project costs, which are part of your project budget.

Description : According to the PMBOK guide, which of the following statements is  right in terms of using reserve analysis to determine a project budget? Select one: A. Reserve analysis always plans ... not practical. E. Contingency reserves have never been a concern when planning a project budget.

Last Answer : A. Reserve analysis always plans contingency reserves for unexpected project scope and  project costs, which are part of your project budget.

Description : Project mission and objectives, procedures and systems used, and organization resources used typically appear in the _____ section of the final project report. A. Analysis B. Recommendation C. lessons learned D. financial feasibility

Last Answer : A. Analysis

Description : Swot Analysis is a _____________ tool A. Conceptual B. Modern C. Scientific D. Traditional

Last Answer : A. Conceptual

Description : _____________ can be defined as a specifically evolved work plan densed to achieve a specific objective within a specific period of time A. Idea generation. B. Opportunity Scanning. C. Project. D. Strategy.

Last Answer : C. Project.

Description : _____________ may be defined as the excess of present value of project cash inflows over that of out flows. A. Net present value technique. B. Average rate of return. C. Benefit-Cost ratio. D. Internal rate of return

Last Answer : A. Net present value technique.

Description : _____________ refers to some action which is a time consuming effort necessary to complete a specific event. A. A Network. B. An Activity. C. An Event. D. A Node.

Last Answer : B. An Activity.

Description : ______________ describes the direction, the enterprise is going in, what its goals are, where it wants to be,and how it is going to get there. A. project report B. technical anlaysis C. market analysis D. financial analysis

Last Answer : A. project report

Description : ____________ is primarily concerned with the identification of the project demand potential and the selection of the optimal technology. A. Techno-economic analysis. B. Feasibility analysis. C. Input analysis. D. Financial analysis.

Last Answer : A. Techno-economic analysis.

Description : The minimum amount of------------------,irrespective of such private participation,could be specified at a minimum 17.5 per cent of project costs by lending institutions. A. bank loans B. promotors contribution C. fixed capital D. working capital

Last Answer : B. promotors contribution

Description : Which of the following activity is undertaken immediately after feasibility study and before  the requirement analysis and specification phase? A. Project Planning B. Project Monitoring C. Project Control D. Project Scheduling

Last Answer : A. Project Planning

Description : Reserve bank of India is a/an _______. A. statutory corporation. B. company limited by guarantee. C. company limited by shares. D. unlimited company.

Last Answer : A. statutory corporation.

Description : A business arrangement where one party allows another party to use a business Name and sell its products or services is known as__________. A. A cooperative. B. A franchise. C. An owner-manager business. D. A limited company

Last Answer : B. A franchise.

Description : A business arrangement where one party allows another party to use a business name and sell its products or services is known as__________. A. A cooperative. B. A franchise. C. An owner-manager business. D. A limited company.

Last Answer : B. A franchise.

Description : CPM stands for____________. A. Continuous Path Method. B. Clear Path Method. C. Critical Path Method. D. Critical Probabilistic Method.

Last Answer : C. Critical Path Method.

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : NABARD is a Bank for _____________ development A. Urban B. Agricultural and Rural C. Scientific D. Agriculture and research

Last Answer : B. Agricultural and Rural

Description : When a firm enters into some business which is related with its present business in terms of technology, marketing or both it is called as _____________. A. conglomerate diversification. B. horizontal integration. C. vertical integration. D. concentric integration.

Last Answer : D. concentric integration.

Description : _____________ is an event-oriented approach . A. CPM. B. GERT. C. PERT. D. WASP.

Last Answer : 1

Description : An individual who starts, creates and manages a new business can be called _____________. A. A leader B. A manager C. A professional D. An entrepreneur

Last Answer : D. An entrepreneur

Description : The 'T' in a PESTLE analysis refers to ___________. A. Time. B. Technology. C. Training. D. Talent.

Last Answer : B. Technology.

Description : Industry analysis should include information on – a) Market size of competitor’s product b) Growth rate of suppliers c) New product entry d) Economic conditions

Last Answer : d) Economic conditions

Description : The content of the final report typically includes the following topics __________. A. Executive summary B. review and analysis C. recommendations D. If all the above are correct.

Last Answer : D. If all the above are correct.

Description : Which of the following factors should not be included in PESTLE analysis? A. Government re-cycling policy. B. Proposed reduction in interest rates. C. Competitor activity. D. Demographic changes.

Last Answer : C. Competitor activity.

Description : In analysis of man-environment relationship Pragmatic Possibilism implies that : (A) There is no limit for man to exploit resources of earth (B) There are limited possibilities to explore earth's ... to keep in mind only his basic needs while planning to harness the potential of resourceful earth 

Last Answer : (C) The man has to watch and assess the situation and then go ahead with resource utilization

Description : Underestimation of project cost leads to ___________. A. Time under run. B. Cost under run C. Time over run. D. Cost over run

Last Answer : D. Cost over run

Description : Every entrepreneur should draw an _______ for his project to ensure the timely completion of all activities involved in setting up an enterprise. A. cost structure B. implementation plan C. market structure D. production structure

Last Answer : B. implementation plan

Description : market potential of the project report includes ________. A. demand and supply conditions B. market strategy C. after sales service D. all the above

Last Answer : D. all the above

Description : what are the components of then project report ________. A. requirement of funds B. location C. manpower D. all the above

Last Answer : All

Description : Integration of project management with the organization takes place with the _______________. A. master budjet B. strategic plan C. Process of managing actual projects D. both b and c

Last Answer : D. both b and c

Description : Project management is ideally suited for a business environment requiring all of the following except _________. A. Flexibility B. Innovation C. speed D. Repetability

Last Answer : A. Flexibility

Description : Which of the following is not considered to be a characteristic of a project? A. An established objective B. Complex tasks C. A clear beginning and end D. Only for internal use

Last Answer : D. Only for internal use

Description : ____________, which is included in the project cost, is estimated on the basis of the year when the enterprise breaks even. A. working capital B. cost of capital C. cost of production D. cost of equity

Last Answer : A. working capital

Description : A project, which may not add to the existing profits, should be financed by _________ A. debentures. B. preference share capital. C. equity capital. D. public deposits.

Last Answer : A. debentures.

Description : The process of preparing an inventory of skills needed for effective implementation of the project is called as ____________. A. Economic viability. B. Financial feasibility. C. Technical feasibility. D. Managerial competence.

Last Answer : D. Managerial competence.

Description : __________________ is the systematic development of a project idea for the eventual purpose of arriving at an investment decision. A. Project identification. B. Project formulation. C. Project feasibility. D. Project evaluation.

Last Answer : B. Project formulation.

Description : PERT stands for __________. A. Programme Evaluation and Research Techniques. B. Project Evaluation and Review Techniques. C. Programme Evaluation and Review Techniques. D. Project Evaluation and Research Techniques.

Last Answer : C. Programme Evaluation and Review Techniques.

Description : Large investment is made in fixed assets, the project will be termed as __________. A. Capital Intensive. B. Labour Intensive. C. Product Intensive. D. Market Intensive.

Last Answer : A. Capital Intensive.

Description : Primary data is________. A. the most important data. B. the data that is collected first. C. new data specifically collected for a project. D. data that is collected second.

Last Answer : C. new data specifically collected for a project.

Description : Project crashing is the method for -------------  A. Shortening the project duration by reducing the time of one or more critical  activities  B.Adding resources at critical points  C.Doing technical analysis of the finished work for review  D.Adding duration to each activity

Last Answer : A. Shortening the project duration by reducing the time of one or more critical  activities

Description : Are there grants available for buying a business?

Last Answer : Have you contacted the local SBA? It would seem to be to everyone’s advantage that you conclude this deal, if it is as you describe.

Description : In backward areas, term loans for expansion or setting up a new unit are available at __________ . A. concessional terms. B. differential terms. C. standard terms. D. specific terms.

Last Answer : A. concessional terms.

Description : Strategic planning: (a) Addresses the organization's basic mission or business, issuing broad statements of purpose or direction that have a long lead time. (b) Involves managers in each unit of ... overall plans of the organization. (d) Determines the day-to-day operations within an organization.

Last Answer : (a) Addresses the organization's basic mission or business, issuing broad statements of purpose or direction that have a long lead time.

Description : The technology used to distribute service requests to resources is referred to as _____________ a) load performing b) load scheduling c) load balancing d) all of the mentioned

Last Answer : load balancing

Description : The technology used to distribute service requests to resources is referred to as _____________ a) load performing b) load scheduling c) load balancing d) all of the mentioned

Last Answer : load balancing

Description : During the planning development process, at times it is necessary to make certain assumptions to enhance the project plan when the data is not available. In regard to making those assumptions, ... upon historical data used for the project.  4. Senior management predefines the budget constraints.

Last Answer : 1. The assumptions will be considered as true, real, or certain.