Water connection given to contractor for construction work can be discontinued by giving a  notice of  
a)3 days*
b) 2 days  
c)7 days
d) no notice is required

1 Answer

Answer :

a)3 days*

Related questions

Description : Mobilization advance up to 10% of the cost of work is given to a contractor (A) On commencement of work at site for payment of loan taken by him (B) For the purchase of construction ... staff (D) For all activities required to start the work at site on finalization of the contract document

Last Answer : (D) For all activities required to start the work at site on finalization of the contract document

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None

Last Answer : b) Lifting*

Description : Wells Fargo Bank just cancelled lines of credit giving 60 days notice. How does it affect everyone?

Last Answer : Effect on me: Zero - never had an account with them. My guess is that their new CEO decided that the profit margin on those was not large enough. Their prerogative. They have no obligation to ... dig themselves out of the hole they created with the fraudulent accounts they created. This is a one off

Description : An annual general meeting may be called after giving shorter notice instead of 21 clear days, if consent is accorded by– (A) All the directors of company (B) All the members entitled to vote there at (C) Majority of members entitled to vote there all (D) None of the above

Last Answer : Answer: All the members entitled to vote there at

Description : A temporary enclosure in a river or Lake built around a working area for the purpose of excluding water during construction is known a) Caisson b) Augur c) Cofferdam * d) Sheet pile wall

Last Answer : c) Cofferdam *

Description : What is the testing frequency of new AT weld ? (i) Just after the welding (ii) After 7 days of welding (iii) With in the one month of welding* (iv) None of the above

Last Answer : iii) With in the one month of welding*

Description : The maximum time lag between the primer coat and the Ist finishing coat shall not exceed a) 3 days b) 7 days* c) 4 days d) 12 days

Last Answer : b) 7 days*

Description : Where Enquiries are ordered by DRM the enquiry report should be submitted to DRM within (a) 5 days (b) 7 days* (c) 10 days (d) 12 days

Last Answer : (b) 7 days

Description : Independent Contractor Notice?

Last Answer : Independent Contractor Notice(Download)You are acting as an independent contractor for ________________________. As an independent contractor, you should be aware of the following ... Date:Independent Contractor___________________CustomerI, the principal officer of Independent Contractor, do hereby

Description : At least how many days of prior notice is required for the impeachment to the President of India? (1) 7 days (2) 14 days (3) 21 days (4) 30 days

Last Answer : (2) 14 days Explanation: For impeachment of President of India at least fourteen days notice in writing is required.

Description : Survey of the major projects is done by (a) Chief Engineer (b) Chief Administrative Officer (CAO) construction* (c) Divisional Railway Manager (d) Railway Board

Last Answer : (b) Chief Administrative Officer (CAO) construction*

Description : Which of the following stone is best suited for construction of piers and abutments of Railway Bridge a) Granite* b) Sandstone c) Limestone d) Quartzite

Last Answer : a) Granite*

Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000

Last Answer : b) 1, 00,000*

Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method

Last Answer : c) Launching of girders with the help of a

Description : Depth of construction in a girder bridge means the depth from a) RL to HFL b) RL to top of bed block * c) RL to bottom of bed block d) RL to Bed level

Last Answer : b) RL to top of bed block *

Description : Number of sleepers required having sleeper density of M+7 for one Km of BG single line is (a) 1360 (b) 1540* (c) 1660 (d) None of the above

Last Answer : (b) 1540*

Description : While filling the tender for any work, the contractor considers (A) Site survey (B) Availability of construction materials (C) Availability of labour (D) All the above

Last Answer : (D) All the above

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description : Weather traffic block is required for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.

Description : Weather protection of track is required during block for execution of AT Welding? (i) Yes.* (ii) No (iii) As decided by site supervisor (iv) As per site condition

Last Answer : (i) Yes.*

Description : For calling the Extraordinary General Meeting a clear notice of ……… days must be given to all the members. (A) 7 (B) 15 (C) 21 (D) 30

Last Answer : Answer: 21

Description : How to Choose a Contractor for Your Construction Job?

Last Answer : If you have a construction job that needs to be completed in your home, there are a few things that you should know before you hire a contractor. You will want to make sure that you hire a ... do the best job for you, so trust your instincts when selecting a contractor for your construction job.

Description : The pumping system should be capable of supplying the normal quantity of water required in 24 hours in a)12 hours or less b) 16 hours or less c) 20 hours or less* d) 8 hours or less

Last Answer : c) 20 hours or less*

Description : A rural water supply serves a population of 10, 000 at the rate of 50 litres per capita per day . For the chlorine dose of 2 PPM the required amount of bleaching powder with 20% available chlorine will be a. 0.5 kg b. 5 kg * c. 10 kg d. 15 kg

Last Answer : b. 5 kg

Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.

Last Answer : (iii) Within 3 months of detection.*

Description : When was the collar painting done ? (i) After the welding * (ii) after one week of welding (iii) After 15 days of welding (iv) None of the above

Last Answer : (i) After the welding *

Description : What is the duration for supervisors course (TW-3)? (i) One week * (ii) Two weeks (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) One week

Description : What is the duration for Refresher course for welders (TW-2)? (i) One week* (ii) Two weeks (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) One week*

Description : What is the duration for Initial course for welders (TW-1)? (i) Two weeks* (ii) One week (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) Two weeks*

Description : The approximate ratio between the strength of cement concrete at seven days and 28 days is a) 3/ 4 b) 2/3* c) 1/2 d) 1/3

Last Answer : b) 2/3*

Description : A new railway line is required to be constructed beaus’ of following reasons (a) Strategic and political considerations (b) Development of backward area (c) To shorten existing rail link (d) Any of them*

Last Answer : d) Any of them*

Description : The purpose of reconnaissance survey (a) To determine technical fenibility of the line* (b) To assess whether such a line is required or not (c) To decide the final alignment of the railway line (d) None of the above

Last Answer : (a) To determine technical fenibility of the line*

Description : Biochemical Oxygen Demand (BOD) of sewage is the (a) Oxygen required to oxidise (b) Oxygen required to oxidise biologically inactive organic matter* (c) a and b both (d) none of these

Last Answer : (b) Oxygen required to oxidise biologically inactive organic matter*

Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required

Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*

Description : Minimum traffic block required for execution of AT Weld ? (i) 70 minutes (ii) 70-75 minute.* (iii) 60 mints (iv) 1 hrs and 30 mints

Last Answer : (ii) 70-75 minute.*

Description : What is the validity after supervisors course (TW-3)? (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.* (ii) 2 years (iii) 5 Years (iv) 10 Years

Last Answer : (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.*

Description : Number of bricks required for 1 cubic meter of brick masonry is a)400 b) 450 c) 500* d) 550

Last Answer : c) 500*

Description : The size of bridge timber required for the standard spans up to 18.3 m a) 250 x 150mm*. b) 250 x 180mm. c) 250 x 240mm d) 250 x 200mm

Last Answer : a) 250 x 150mm*.

Description : Speed restriction required for using CC cribs as temporary arrangement is a) 20 kmph* b) 40 kmph c) 35 kmph d) 30 kmph

Last Answer : a) 20 kmph*

Description : .Minimum earth cushion required over RCC Box is a) 300 mm b) 600 mm c) 0* d) 1000 mm

Last Answer : c) 0*

Description : Minimum Free Board required in a bridge is a) 1 m* b) 1.20 m c) 600 mm d) 300 mm

Last Answer : a) 1 m*

Description : “Composite sleeper index” is employed to determine a) sleeper density requirement b) number of fixtures required for a particular type of sleeper c) durability of sleeper d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Last Answer : d) mechanical strength of wooden sleepers and thereby gives its suitability as to be used as li sleepers.*

Description : In which of the following cases no notice is required to be given to adverse pary  before producing secondary documentary evidence? a) When original is destroyed b) When original is immovable c) When original is electronic record d) When original is in possession of adverse party

Last Answer : d) When original is in possession of adverse party

Description : PH value of drinking water as per wh0 standards should lie between a)5 and 5.5 b)6 and 7 c) 7 and 7.5 d)7 and 8.5*

Last Answer : d)7 and 8.5*

Description : Do women notice when you absentmindedly finger their brastrap/clasp while giving them a hug?

Last Answer : Yes!! If you snap it hard! absentmindly uhuh sure

Description : Tenant rights if my lease has expired and I am giving the landlord a 30 notice to vacate,can I be ev?

Last Answer : Tenant rights if my lease has expired and I am giving the landlord a 30 notice to vacate,can I be evicted?

Description : A continuing guarantee may at any time be revoked by the surety as to future transactions by giving a ____ to the creditor. a) By notice b) By Oral c) By death of surety ` d) none of these

Last Answer : a) By notice

Description : As per norms for desirable amenity as given to model station, the water coolers should be provided on stations classified as --- (a) A & B (b) A,B & C (c) A,B,C & D* (d) A, B,C, D & E (e) A

Last Answer : (c) A,B,C & D*

Description : The ratio of volume of water present in a given soil sample to the total volume of voids in it is known as a) Percentage of air voids b) Degree of saturation * c) Void rat

Last Answer : b) Degree of saturation *