Where Enquiries are ordered by DRM the enquiry report should be submitted to DRM  within  
(a) 5 days  
(b) 7 days*  
(c) 10 days  
(d) 12 days

1 Answer

Answer :

(b) 7 days

Related questions

Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM

Last Answer : (b) One for alternate coach*

Description : Rule 10 of CCS Conduct rules not apply to:- a) Evidence given at an enquiry before an quthority appinted by the Govt, Parliament or a State Legislature b) Evidence given in any ... Evidence given at any departmental enquiry ordered by authorities subordinate to the government d) All the above

Last Answer : d) All the above

Description : c) Following allegation of killing of three civilians in Gandwara in a fake encounter by Jammu and Kashmir police, an enquiry has been ordered. -Democratic 10th

Last Answer : Allegations of killing three civilians in Gandwara by the Jammu and Kashmir police in a fake encounter raises questions on the police force of the state. The challenge here is to control the power of the police and other authoritative officials.

Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters

Last Answer : a) 3 meters*

Description : The maximum time lag between the primer coat and the Ist finishing coat shall not exceed a) 3 days b) 7 days* c) 4 days d) 12 days

Last Answer : b) 7 days*

Description : Enquiries regarding BPO & IPO will be normally considered if made a) Within 6 month from the date of purchase of the order b) Within 1 year from the date of purchase of the order c) Within 1 1/2 year from the date of purchase of the orde d) None of the above

Last Answer : b) Within 1 year from the date of purchase of the order

Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.

Last Answer : (iii) Within 3 months of detection.*

Description : The index map of preliminary report should be to a scale of (a) 1 cm to 0.5 km (b) 1 cm to 1.0 km (c) 1 cm to 2.5 km* (d) 1 cm to 10.0 km

Last Answer : (c) 1 cm to 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : If enquiry officer is not submit or handed over the case records and inquiry report to disciplinary authority then payment of honorarium can be made . The above statement is a. True b. False

Last Answer : b. False

Description : The capacity of high level flushing cistern is generally (a) 7.5 ltrs. (b) 10 ltrs.* (c) 12.5 ltrs. (d) None of these

Last Answer : b) 10 ltrs.*

Description : ormal size of brick used in India is a) 22 x 11.2 x 7 cm* b) 25 x 16 x 8 cm c) 19 x 12 x 9 cm d) 20 x 10 x 5 cm

Last Answer : a) 22 x 11.2 x 7 cm*

Description : What is the testing frequency of new AT weld ? (i) Just after the welding (ii) After 7 days of welding (iii) With in the one month of welding* (iv) None of the above

Last Answer : iii) With in the one month of welding*

Description : Water connection given to contractor for construction work can be discontinued by giving a notice of a)3 days* b) 2 days c)7 days d) no notice is required

Last Answer : a)3 days*

Description : Speed breaker has to be provided on road approaches of level crossing at maximum feasible distance within Railway boundary but not exceeding a) 10 meters b) 15 meters c) 20 meters* d) 200 meters

Last Answer : c) 20 meters*

Description : Rail joints should be avoided within ……………of a bridge abutment. a) 6 m b) 3 m* c) 4 m d) 10 m

Last Answer : b) 3 m*

Description : A detailed project report of the proposed railway line is made after (a) Preliminary survey (b) Reconnaissance survey (c) Final location survey* (d) Traffic survey

Last Answer : (c) Final location survey*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *

Last Answer : d) All the above

Description : What type of report is submitted by the observer upon encountering enemy activly tohigher headquaters through the most secure means?

Last Answer : Need answer

Description : The annual report of the UPSC is submitted to – (1) The President (2) The Supreme Court (3) The Prime Minister (4) The Chairman of the Union Public Service Commission

Last Answer : (1) The President Explanation: The UPSC annually submits a report of its work to the President of India. Further it is sent to each house of Parliament for discussion.

Description : In which one of the following years was Sarkaria Commission, which was empowered to recommend 0 changes in Centre-State relations, submitted its report? (1) 1983 (2) 1984 (3) 1985 (4) 1987

Last Answer : (1) 1983 Explanation: In view of the growing pressure for the greater autonomy, in June 1983 the Union Government appointed a commission under the chairmanship of Justice R.S. Sarkaria to review ... . The commission submitted its report to the then Prime Minister Rajiv Gandhi on 27 October 1987.

Description : The Philippine Accountancy Act of 2004 provides that all Working papers made during an audit shall be the property of the auditor. These working papers shall include the following, except: a. Working ... of documents furnished to the auditor. d. Any report submitted by the auditor to his client.

Last Answer : Any report submitted by the auditor to his client.

Description : A report of bag balance in the pro forma given below will be submitted by each UBO to its _____daily and by each DBO to its weekly. The Circle Bag Office will send a______ of balances in the prescribed pro ... , 5th of each month c) UBO, DBO, monthly report , 10th of each month d) None of these

Last Answer : b) DBO, CBO, monthly report , 5th of each month

Description : In case of Shot Welded Rails the fish plated joint should be avoided on Level Crossings within a distance of --------- from end of level crossing a) 3 meters b) 4 meters c) 5 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : Speed breaker of approved design shall be provided on either side of level crossing at ------ within Railway boundary a) 5 meters b) 15 meters c) 20 meters* d0 30 meters

Last Answer : c) 20 meters

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : The capacity of automatic flushing cistern connected with three urinal shall be (a) 05 litrs. (b) 10 litrs. (c) 12.5 litrs.* (d) None of these

Last Answer : (c) 12.5 litrs.*

Description : The capacity of automatic flushing cistern connected with two urinal shall be (a) 10 litrs.* (b) 12.5 litrs. (c) 05 litrs. (d) None of these

Last Answer : (a) 10 litrs.*

Description : The capacity of automatic flushing cistern connected with one urinal shall be (a) 05 litrs. (b) 10 litrs. (c) 12.5 litrs. (d) None of these

Last Answer : (a) 05 litrs.

Description : Density of each compacted layer should be ascertained by taking soil samples on either side of Central Line at a) 5 meter interval b) 10 meter interval* c) 12 meter interval d) 15 meter internal

Last Answer : b) 10 meter interval*

Description : hat action to be taken if slag is not separated within 20 ± 3 seconds? (i) Tap inside. (ii) Tap outside * (iii) Good reaction (iv) Tap well in time

Last Answer : ii) Tap outside *

Description : In LWR track on BG a) Level crossing should be separated by providing SEJs b) Level crossing cannot be provided in LWR. c) Level crossing should not fall within the breathing length of LWR* d) Level crossing should be laid with rail free fastenings.

Last Answer : c) Level crossing should not fall within the breathing length of LWR*

Description : The normal procedure for promotion should be by …………..Qualified men will be entitled to promotion by seniority within their own groups. a) Trade test* b) Interview c) Recommendation d) Random selection

Last Answer : a) Trade test*

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : What is the app. Weight of 52 kg portion? (i) 10 kg (ii) 11 kg* (iii) 12 kg (iv) None of the above

Last Answer : (ii) 11 kg*

Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm

Last Answer : c) 450 mm*

Description : From distribution main of 50 mm size, number of service pipes of 15 mm size can be taken off are ------ a) 6 b)10 c) 12 e):20*

Last Answer : e):20*

Description : From the distribution main of 40 mm size, number of service pipe of 20 mm size can be taken off are ------- a)3 B) 6* c) 10 d) 12

Last Answer : B) 6*

Description : From distribution main of 40 mm size , number of service pipe of 15 mm size can be taken off are--------- a) 3 b) 6 c) 10 d) 12*

Last Answer : d) 12*

Description : Maximum curvature permitted on B.G. is (a) 8 degree (b) 10 degree* (c) 12 degree (d) 16 degree

Last Answer : (b) 10 degree*

Description : How many zones are in Indian railway a. 8 b. 10 c. 16* d. 12

Last Answer : c. 16*

Description : No appeal against such alternative will lie to a higher authority unless it is submitted within the usual time limit of _______ from the date of communication a) Three months b) Six month c) One year d) One month

Last Answer : b) Six month

Description : Representations against recovery should be submitted by aggrieved Government servant within a ------------- a. One Month b. Two month c. Three Month

Last Answer : b. Two month

Description : Indian type W.C. pan shall have 10cm. S.C.I. trap P or S type with effective seal of (a) 5 cm.* (b) 10 cm. (c) 7.5 cm (d) None of these

Last Answer : (a) 5 cm.*

Description : In Epoxy pressure grouting, pressure is kept as a) 2 to 4 kg./sqcm. b) 3 to 6 kg./sqcm. c) 3 to 10 kg./sqcm. d) 3.5 to 7 kg./sqcm.*

Last Answer : d) 3.5 to 7 kg./sqcm.*