Lubrication of ERC and inserts in corrosion prone areas and platform line is done:- (a) Once in a month.
(b) Once in a fortnight.
(c) Once in a week.
(d) Once in a year.*

1 Answer

Answer :

(d) Once in a year.*

Related questions

Description : The Inward Correspondence Register concerning Public Complaints maintained in Record Offices in the Selection Grade should be checked personally by the Record Officer or the Officer authorized in this behalf: (A) Daily (B) One in a week (C) Once in a fortnight (D) Once in a month

Last Answer : (B) One in a week

Description : The posting of the Regd. Newspaper without prepayment should be stopped and license deemed to be cancelled in the event of non payment of a bill a) Within one week following the fortnight to which ... relates. c) Within fortnight following the fortnight to which the bill relates. d) None of these

Last Answer : c) Within fortnight following the fortnight to which the bill relates.

Description : In areas where there is severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339* b) One coat of zinc chromate priming to IS : 104 e) Two cover coats of red oxide paint to IS :123 f) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : a) Two coats of aluminium paint to IS : 2339*

Description : In areas where there is no severe corrosion Finishing coat will be a) Two coats of aluminium paint to IS : 2339 b) One coat of zinc chromate priming to IS : 104 c) Two cover coats of red oxide paint to IS :123* d) One coat of zinc chrome - red oxide priming to IS : 2074

Last Answer : c) Two cover coats of red oxide paint to IS :123*

Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month

Last Answer : b) Once a year before monsoon*

Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.

Last Answer : i) At least once in month*

Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months

Last Answer : a) Once in three months*

Description : Special inspection of distressed bridges shall be carried out by Asst. Engineer is a) Once in three months b) Once in two months* c) Once in a month d) Once in six months

Last Answer : b) Once in two months*

Description : One of the following works does not require CRS sanction a) Regirdering/ Rebuilding b) Erection of new FOB c) Erection of platform shelter* d) Pipe line crossing

Last Answer : c) Erection of platform shelter*

Description : Periodical Census of traffic at unmanned level Crossings should be done once in a) Once in 6 years b) Every year c) Once in 3 years* d) Once in 5 years

Last Answer : c) Once in 3 years*

Description : Deep screening of entire track must be done at least:- (a) Once in a quarter. (b) Once in a year. (c) Once in 5 years. (d) Once in 10 years.*

Last Answer : (d) Once in 10 years.*

Description : When was the collar painting done ? (i) After the welding * (ii) after one week of welding (iii) After 15 days of welding (iv) None of the above

Last Answer : (i) After the welding *

Description : Greasing of bearings of Steel girder bridges is done once in years.

Last Answer : Three

Description : The purpose of lubrication in an antifriction bearing is (a) to reduce the friction between balls and races (b) dissipation of frictional heat prevention of corrosion (c) protection of the bearing from dirt and other foreign particles (d) all of the mentioned

Last Answer : (d) all of the mentioned

Description : Wood is well suited to use as bearing on straw walker cranks in combine due to fact a) Wood corrosion resistance b) Split bearing are needed for practical purpose c) It can take radial as well as thrust loads d) No lubrication is required

Last Answer : b) Split bearing are needed for practical purpose

Description : Corrosion in Steel girder bridges may be prevented by : a) Protective coatings by painting b) Metallising c) Use of epoxy based paints d) All the above*

Last Answer : d) All the above*

Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*

Last Answer : d) All the above*

Description : Permissible wear of web & foot of rail due to corrosion is:- (a) 15 mm. (b) 1.5 mm.* (c) 0.5 mm. (d) 2.5 mm.

Last Answer : (b) 1.5 mm

Description : Height of Low level platform for passengers for BG is --- high (a) 0.455 m* (b) 0.560 m (c) 0.650 m (d) 0.760 m

Last Answer : (a) 0.455 m*

Description : Height of high level platform for passengers for BG is --- high (a) 0.455 m (b) 0.560 m (c) 0.650 m (d) 0.760 m*

Last Answer : (d) 0.760 m*

Description : Height of platform of a flag station in cutting above rail level is (a) Same height as Rail level (b) 305 mm above rail level (c) 455 mm above rail level (d) 840mm above rail level*

Last Answer : (d) 840mm above rail level*

Description : Number of taps on platform as per norms for recommended level of facilities (a) One for every coach (b) One for alternate coach* (c) One every 200 metres distance (d) At the discretion of DRM

Last Answer : (b) One for alternate coach*

Description : Number of taps to be provided on ‘A’ category stations on each platform as per norms of minimum essential facilities are (a) 20 taps (b) 15 taps (c) 12 taps* (d) One taps for each bogie

Last Answer : (c) 12 taps*

Description : For ‘B’ category stations as per minimum essential facility it is necessary to provide (a) High level platform (b) Medium level platform* (c) Rail level platform (d) All the above

Last Answer : (b) Medium level platform*

Description : For ‘A’ category stations it is necessary to provide (a) High level platform* (b) Medium level platform (c) Rail level platform (d) All the above

Last Answer : (a) High level platform*

Description : Numbers of taps on each platform of ‘C’ category station as per norms of minimum essential facility criteria are (a) 6* (b) 8 (c) 12 (d) 15

Last Answer : (a) 6*

Description : Numbers of taps on each platform of ‘B’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12* (d) 15

Last Answer : (c) 12*

Description : Numbers of taps on each platform of ‘A’ category station as per norms of minimum essential facility criteria are (a) 6 (b) 8 (c) 12 (d) 15*

Last Answer : d) 15*

Description : Facia boards of platform shelters shall have a minimum horizontal clearance of ……. from C.L. of track at a minimum height of 4.61m above RL. a) 2360 mm b) 3660 mm c) 3000 mm d) 1600 mm*

Last Answer : d) 1600 mm*

Description : The horizontal clearance of edge of foot over bridge structure from face of platform is a) 6525 mm b) 3660 mm* c) 5330 mm d) 5300 mm

Last Answer : b) 3660 mm*

Description : Requirement of water for platform washing is a)5 litre per square metre per day * b)10 litre per square meter per day c) 15 litre per square metre per day d)20 litre per square metre per day

Last Answer : a)5 litre per square metre per day *

Description : The maximum height above rail level for B.G. goods platform is ……. Mm (a) 1000mm (b) 1050mm (c) 1065mm* (d) 1075mm

Last Answer : (c) 1065mm*

Description : The gradient of a platform is generally (a) 1 in 1000 (b) 1 in 750 (c) 1 in 500* (d) 1 in 250

Last Answer : (c) 1 in 500*

Description : What is maximum height above rail level for low-level passenger platform for BG? (a) 300mm (b) 455mm* (c) 525mm (d) 550mm

Last Answer : (b) 455mm

Description : The minimum horizontal distances form centre of track to face of passenger platform coping for B.G. is ……. Mm (A) 1650 MM. (B) 1670 MM* (C)1676 MM (D) 1685 MM

Last Answer : (B) 1670 MM*

Description : Maximum height above rail level of high passenger Platform a. 860 mm b. 900 mm c. 840 mm&* d. 875 mm

Last Answer : c. 840 mm&*

Description : Longest platform of the world on BG is a) At Sonepur station* b) At Sasaram station c) At Allahabad station d) At Kharagpur station

Last Answer : a) At Sonepur station*

Description : Which of the following is the most prone to atmospheric corrosion? (A) Silver (B) Iron (C) Tin (D) Copper

Last Answer : (B) Iron

Description : Alloys having more than 80% copper are generally more (A) Abrasion resistant (B) Corrosion resistant (C) Prone to season cracking (D) Machinable

Last Answer : (B) Corrosion resistant

Description : The frequency of census at a level crossing having TVU between 75000 to 1 lakh will be once a) In 2 years b) In 3 years* c) In 4 years d) Every year

Last Answer : b) In 3 years*

Description : riodicity of recording of camber in PSC girders a) Once in a year* b) Once in two years c) Once in three years d) During the detailed inspection of SE/Br.

Last Answer : a) Once in a year*

Description : Periodicity of Under water inspection a) Once in a year b) Once in two years* c) Whenever high flood occurs d) Along with detailed inspection of SE/Br

Last Answer : b) Once in two years*

Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years

Last Answer : a) Within one year of installation*

Description : Shelf life of Paint aluminium when paste and oil are mixed a) Oneday* b) 1 year c) 6 month d) None of the above

Last Answer : a) Oneday*

Description : Shelf life of Paint Red Oxide Ready mixed (IS : 123) a) 4 month b) 1 year* c) 6 month d) None of the above

Last Answer : b) 1 year*

Description : Traffic survey is done to find out (a) The most promising route for the railway in the area (b) The possible traffic the railway line will carry (c) Standard of railway line to be followed (d) All the above*

Last Answer : d) All the above*

Description : Which of the following survey are required to be done before the construction of new railway line. (a) Traffic survey (b) Reconnaessarice survey (c) Preliminary survey (d) Final location survey (e) All the above

Last Answer : e) All the above

Description : The failure of ball bearings used in electric motors can result from _____________. A. failure to clean the bearing before repacking B. failure to maintain proper alignment C. excess lubrication forcing the bearing full of grease and eliminating all areas of expansion D. all of the above

Last Answer : Answer: D

Description : What is the duration for supervisors course (TW-3)? (i) One week * (ii) Two weeks (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) One week