Description : Special inspection of distressed bridges Group II shall be carried out by Inspector (Concerned) is a) Once in three months* b) Once in two months c) Once in a month d) Once in six months
Last Answer : a) Once in three months*
Description : Curve inspection shall be carried out by Sectional PWI a. Once in three months b. Once in six months c. Once in four months* d. None of above
Last Answer : c. Once in four months
Description : Sensitivity calibration against temp. variation shall be carried out. (i) At least once in month* (ii) quarterly. (iii) at least once in six months (iv) Any of above.
Last Answer : i) At least once in month*
Description : Initial inspection for PSC girders / Welded girder bridges as per IRBM 1998 a) Within one year of installation* b) Once in 3 years d) Once in 2 years d) Once in 5 years
Last Answer : a) Within one year of installation*
Description : In arch bridges, Cracks/ lean/ bulge in parapet walls, Bulging or separation of spandrel from arch barrel, are the signs of distressed bridge under a) Group I b) Group II* c) Both of the above d) None of the above
Last Answer : b) Group II*
Description : Speed restrictions is suggested for distressed bridges on Group II a) upto maximum of 15 kmph b) 25 kmph to 50 kmph* c) 75 kmph d) 60 kmph
Last Answer : b) 25 kmph to 50 kmph*
Description : Speed restrictions is suggested for distressed bridges on Group I a) upto maximum of 15 kmph* b) 25 kmph c) 50 kmph
Last Answer : a) upto maximum of 15 kmph*
Description : The Assistant Divisional Engineer should inspect the equipment at every manned level crossing on the subdivision once in a) 2 months b) 3 months c) 4 months d) 6 months*
Last Answer : d) 6 months
Description : In case of distressed bridge category II, ADEN shall inspect the bridge
Last Answer : once in 6 months
Description : In case of bridge is distressed category I then special restriction of___hall be imposed
Last Answer : 15 kmph
Description : Investigation for important bridges may be carried out in which stage a) Technical feasibility study (reconnaissance survey) b) Techno-economic feasibility study (preliminary engineering survey) c) Detailed survey and project report stage (final location survey) d) All the above *
Last Answer : d) All the above
Description : riodicity of recording of camber in PSC girders a) Once in a year* b) Once in two years c) Once in three years d) During the detailed inspection of SE/Br.
Last Answer : a) Once in a year*
Description : The level of guard rail in bridges shall not be lower than that of running rail by more than a) 25 mm* b) 55 mm c) 75 mm d) 65 mm
Last Answer : a) 25 mm*
Description : As per GCC Engineer shall mean_____
Last Answer : DEN / XEN
Description : Greasing of bearings of Steel girder bridges is done once in years.
Last Answer : Three
Description : Periodicity of Under water inspection a) Once in a year b) Once in two years* c) Whenever high flood occurs d) Along with detailed inspection of SE/Br
Last Answer : b) Once in two years*
Description : Periodical inspection of PSC & Composite girders a) Once in 3 years b) Once in 5 years * c) Once in 2 years d) Once in 5 years
Last Answer : b) Once in 5 years *
Description : Periodical inspection of Welded girders a) Once in 3 years b) Once in 3 years* c) Once in 2 years d) Once in 5 years
Last Answer : b) Once in 3 years*
Description : Cracks in return walls/ wing walls or Slight tilting/ bulging of abutments are the signs of distressed bridge under a) Group I b) Group II* c) Both of the above d) None of the above
Description : Settlement of foundations or Tilted piers and abutments will be considered as distressed bridge as a) Group I* b) Group II c) Both of the above d) None of the above
Last Answer : a) Group I*
Description : Whoever holds out any threat of injury to any public servant, or to any person in whom he believes that public servant to be interested shall be punished with imprisonment of either description for a term which may ... fine or with both. a) Six month b) Three month c) One year d) Two year
Last Answer : a) Six month, One thousand
Description : Resistance to the taking of property by the lawful authority of a public servant shall be punished with simple imprisonment may extend_____ , or with fine which may extend to ____ or with both a) One month, five hundred b) Three months, five hundred c) Six month, one thousand d) None of these
Last Answer : c) Six month, one thousand
Description : DFWR weld shall be replaced. (i) Within 2 months of detection. (ii) Within 1 year of detection. (iii) Within 3 months of detection.* (iv) after 3 days of detection.
Last Answer : (iii) Within 3 months of detection.*
Description : Type of competency certificate issued after TW-1 course? (i) Competency for two years (ii) Provisional competency.* (iii) Competency for six months (iv) Competency to do welding independently
Last Answer : (ii) Provisional competency.*
Description : What is the validity of Provisional competency certificate? (i) Valid for executing 50 joints or six months whichever is earlier. (ii) Valid for executing 100 joints or six months whichever is earlier.* (iii) Valid for executing 50 joints. (iv) Valid for six months
Last Answer : (ii) Valid for executing 100 joints or six months whichever is earlier.*
Description : If an offender is sentenced to imprisonment for a term exceeding six months but not exceeding one year, the term of solitary confinement (a) Shall not exceed 15 days (b) Shall not exceed one month (c) Shall not exceed two months (d) Shall not exceed forty-five days
Last Answer : (c) Shall not exceed two months
Description : An ordinance issued by the Governor, without the approval of the State Legislature shall be effective for a period of – (1) Six months (2) Six weeks (3) One year (4) One month
Last Answer : (2) Six weeks Explanation: The Governor has the power of making ordinances during the recess of the legislature to meet some emergency. A Governor's Ordinance ceases to operate six weeks after the reassembly of the legislature if not disapproved by the state legislature.
Description : Mark the correct option a) Omission to produce document to public servant by person legally bound to produce it shall be punished with simple imprisonment for a term which may extend to one month, or with ... or with fine which may extend to one thousand rupees, or with both d) Al the above
Last Answer : d) Al the above
Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month
Last Answer : b) Once a year before monsoon*
Description : Lubrication of ERC and inserts in corrosion prone areas and platform line is done:- (a) Once in a month. (b) Once in a fortnight. (c) Once in a week. (d) Once in a year.*
Last Answer : (d) Once in a year.*
Description : An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every _____________. A. week B. 2 weeks C. month D. 3 months
Last Answer : Answer: C
Description : Every public authority shall designate an officer at each sub divisional level a) Central Asst. public information officers/State Asst. public information officer b) Central information/State information ... c) Central public information officer/State public information officer d) All the above
Description : The date of painting of steel work should be painted in white on the out side of the left girder a) of the 1st span only b) first span only but on all spans for Imp. Bridges* c) of the all spans d) None of the above
Last Answer : b) first span only but on all spans for Imp. Bridges*
Description : What is the clear distance between two consecutive steel channel sleepers on Girder bridges? (a) 450 mm* (b) 510 mm (c) 500 mm (d) 460 mm
Last Answer : (a) 450 mm*
Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*
Last Answer : g) All the above*
Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as
Last Answer : …Shallow foundation..
Description : If the SSE/SE/JE/ Br. working in the section is not readily available, another SSE/SE/JE may be authorised by …………….. to witness payment on the section. a) DEN b) SSE/SE/JE/ c) AEN (Bridges)* d) Office clerk
Last Answer : c) AEN (Bridges)
Description : The total number of bridges on I.R.is about a)1 Lac b)1.25 Lacs* c)1.50 Lacs d)2 Lacs
Last Answer : b)1.25 Lacs*
Description : Spacing of Trolley refuges a) Every 100m b) If span is more than 100m, on each pier c) Ballasted deck bridges – every 50m d) All the above*
Last Answer : d) All the above*
Description : Flood level gauge to be marked in a) All important bridges* b) All major bridges c) All minor & major bridges d) All bridges
Last Answer : a) All important bridges*
Description : Corrosion in Steel girder bridges may be prevented by : a) Protective coatings by painting b) Metallising c) Use of epoxy based paints d) All the above*
Description : Renewal of slack rivets should be taken up in steel girder bridges: a) All rivets which are hand loose or which have lost 50% of their head by corrosion. b) All hammer loose rivets where corrosion has set ... . c) In end stiffeners when the percentage of hammer loose rivets is >30% d) All the above*
Description : n Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 12.20 < 30.5 m a) 300 mm b) 600 mm* c) 500 mm d) 450 mm
Last Answer : b) 600 mm*
Description : In Girder and Slab Bridges Danger level should be marked below bottom of girders/slabs for water way is > 6.10 < 12.2 m a) 300 mm b) 600 mm c) 450 mm* d) 500 mm
Last Answer : c) 450 mm*
Description : Clear distance between consecutive sleepers not to exceed on bridges in BG is a) 450 mm* b) 600 mm c) 510 mm d) 500 mm
Last Answer : a) 450 mm*
Description : Mostly long span rail-cum road bridges are provided with a) rocker & roller bearings b) segmental roller with oil bath* c) Sliding bearings d) centralised bearings
Last Answer : b) segmental roller with oil bath
Description : For railway bridges with spans in excess of 30.5m, generally provided with a) deck type girders b) open web through girders* c) semi through girders d) shallow type girders
Last Answer : b) open web through girders*
Description : Temporary arrangements for rebuilding of Railway bridges can be executed by providing a) Temporary girder b) Temporary diversion c) Any of the above* d) None of the above
Last Answer : c) Any of the above*
Description : In case of water crossing danger level in bridges a) speed restriction be imposed b) traffic be suspended till water recedes c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic* d) bridge watchman is to be posted
Last Answer : c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic*
Description : Maximum vertical clearance (VC) for a slab/ girder bridges with discharge above 3000 cumecs is a) 300 mm b) 1500 mm c) 1800 mm* d) 600 mm
Last Answer : c) 1800 mm*