Permitted wind velocity for running of trains on the bridge a) 72 km/h*
b) 58 km/h
c) 64 km/h
d) No limits

1 Answer

Answer :

a) 72 km/h*

Related questions

Description : Track structure for CC+8 t+ 2 t loaded trains is:- (a) 52 Kg 90 UTS;PSC 1540 sleepers/ Km.; 250 mm ballast. (b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.* (c) 52 Kg 72 UTS;PSC 1540 sleepers/ Km.; 300 mm ballast. (d) 90 R;PSC 1340 sleepers/ Km.; 250 mm ballast.

Last Answer : b) 60 Kg 90 UTS;PSC 1660 sleepers/ Km.; 300 mm ballast.*

Description : Two trains 120 m and 80 m in length are running in opposite directions with velocities 42 km/h and 30 km/h respectively.

Last Answer : Two trains 120 m and 80 m in length are running in opposite directions with velocities 42 km/h ... In what time will they completely cross each other?

Description : Two trains are moving in opposite directions at 60 km/hr and 90 km/hr. Their lengths are 1.10 km and 0.9 km respectively. The time taken by the slower train to cross the faster train in seconds is: A.58 sec B.50 sec C.48 sec D.56 sec E.None of these

Last Answer : Answer – C (48 sec) Explanation – Relative speed = all lengths/time [60+90] = [1.10 +0.9 ]/time [ PLUS when opposite direction] time=2/150 = 1/75 h 1 hour______3600 sec 1/75 hr______? ?= 3600/75=48 sec

Description : A bridge is generally specified as “Br. No. 180 (5x9.10m G) at km 345/5-6”. a) Effective Span b) Width of bridge c) Clear Span* d) Overall length of bridge

Last Answer : c) Clear Span*

Description : A train 100 m long is moving with the velocity of 72 km/hr. Find the time it takes to cross the bridge which is 2 km long? -Science

Last Answer : Given Lenght of Train = 100m , velocity = 72 km/hr = 20 m/s, Lenght of the Bridge =2 Km. Total distance covered by the train to fully pass the bridge = 2000 + 100 = 2100 m So, time taken time=distancevelocity=210020=105sectime=distancevelocity=210020=105sec

Description : Definition of minor bridge e) Single span less than 12m f) Total linear water way less than 18m g) Both a) & b)* h) None of the above

Last Answer : g) Both a) & b)*

Description : In case of water crossing danger level in bridges a) speed restriction be imposed b) traffic be suspended till water recedes c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic* d) bridge watchman is to be posted

Last Answer : c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic*

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : In new Rail as well as second hand rails how much end bends of the rails in vertical are permitted when checked with one meter straight edge before welding? (i) +0.5mm, -0 mm in vertical * (ii) +0.2mm, -.3 mm in vertical (iii) +0.3mm, -2 mm in vertical (iv) 0 mm, +.5 mm in vertical

Last Answer : (i) +0.5mm, -0 mm in vertical *

Description : Maximum curvature permitted on B.G. is (a) 8 degree (b) 10 degree* (c) 12 degree (d) 16 degree

Last Answer : (b) 10 degree*

Description : The wind velocity is measured using___

Last Answer : Anemometer

Description : A Railway Stations is provided for the following purpose (a) To entrain or detrain the passengers (b) To load or off load the goods or parcels (c) To enable the faster trains to overtake the slower trains (d) All the above*

Last Answer : d) All the above*

Description : A train leaves Mumbai for chennai at 6 : 45 a.m. and goes at the rate of 100 km/h. Another train leaves Chennai for Mumbai at 4.30a.m. and goes at the rate of 120 km/h. If the distance between both is 1240 km, at what distance from Mumbai will the two trains meet? A) 210km B) 324km C) 115km D) 440km

Last Answer : ANSWER: D  Explanation:  Given speed of the first train = 100kmph  speed of the second train = 120kmph  The second train leaving Chennai starts its journey earlier and it travels = 120 *(6.45a.m. ... train covers 4.40 *100 = 440 km  Therefore the first train meet to the second train at 440km

Description : The distance between two stations ooty and chennai is 615km. A train with speed of 75 km/h leaves ooty at 8:00 am towards chennai. Another train with speed of 105 km/h leaves Chennai at 9 : 00 am towards ooty . Then, at what time both trains meet? A) 6 B) 12 C) 18 D) 24

Last Answer : ANSWER:B  Explanation:  First train leaves at 8.00am and second leaves at 9.00am  So,first train that is , from ooty to Chennai has covered  75 km distance in 1 hr.  So , distance left by between the station = ... the trains will meet , 3 hr after second train left  i.e., 9.00 am +3 = 12.00 pm

Description : Two trains of equal length are running on parallel lines in the same direction at 46 km/hr and 36 km/hr. The faster train passes the slower train in 36 seconds. The length of each train is: A.40 m B.55 m C.65 m D.50 m E.None of these

Last Answer : Answer- D (50) Explanation – Relative speed= total lengths/time (46-36) x 5/18 = [L + L ] / 36 10 x (5/18) x36 x (1/2)= L L=50 m

Description : Two trains are running in opposite directions with the same speed. If the length of each train is 120 metres and they cross each other in 12 seconds, then the speed of each train (in km/hr) is: A.12 kmph B.24 kmph C.36 kmph D.48 kmph E.None of these

Last Answer : Answer – C (36 kmph) Explanation – Let the speed of each train be x m/sec. Then, relative speed of the two trains = 2x m/sec. So, 2x = (120 + 120)/12 ⇔ 2x = 20 ⇔ x = 10. ∴ Speed of each train = 10 m/sec = [10 x 18/5] km/hr = 36 km/hr

Description : Two trains are running at 40 km/hr and 20 km/hr respectively in the same direction. Fast train completely passes a man sitting in the slower train in 5 seconds. What is the length of the fast train? A.27 7/9 m B.28 m C.29 m D.30 2/7 m E.None of these 

Last Answer : Answer – A (27 7/9 m) Explanation – When SAME direction- MINUS Relative speed = (40-20) km/hr = [20 x 5/18] m/sec = [50/9] m/sec. Length of faster train = sxt=[50/9 x 5] m = 250/9 m = 27 7/9 m.

Description : Two trains are running at 120 km/hr and 60km/hr respectively in the same direction. Fast train completely passes a boy sitting in the slower train in 15 seconds. What is the length of the fast train? A) 150m B) 550 m C) 250m D) 215m 

Last Answer :  ANSWER: C  Explanation:  Speed of the 1st train = 120km/hr  Speed of the 2nd train = 60km/hr If the direction is given in the same direction then we subtract the relative speed.  Relative speed = (120 - 60) ... / 3 * 15)m  =(750/3)m  = 250m  Therefore the length of the faster train is 250m

Description : A train M speeding with 60km/hr crooses another train N, running in the same direction in 1 min. If the lengths of the trains M and N be 50m and 100m respectively. What is the speed of train N? A) 15 km/hr B) 61km/hr C) 51km/hr D) 50k/hr

Last Answer : ANSWER: C Explanation:  Let the speed of be train N be ‘x’km/hr  Speed of M relative to N = (60 – x)km/hr  = (60-x) * 5/18]m/s = (300 – 5x / 18)m/s  150 / (300 – 5x / 18) =60  2700/300-5x=60  2700=18000-300x 300x=15300  x= 153/3  x=51km/hr  Therefore the speed of the train is 51 km/hr

Description :  Let p and q be two trains 65m and 70m long are running on parallel tracks in the same direction with a speed of 34km/hr and 25 km/hr. how long will it take to clear off each other from the moment they met? A) 54sec B) 56sec C) 45sec D) None of these

Last Answer : ANSWER : A  Explanation :  Speed of the train p = 34km/hr  Speed of the train q = 25 km/hr  If the direction is given in the same direction then we subtract  So relative speed of trains = (34 - 25)km/hr  = 9 km ... 65 + 70)m  = 135m  Therefore time = (135 / (5/2))sec  = 270/5 sec  =54 sec.

Description : If a transmitting antenna is 100 meters high and a separate receiving antenna is 64 meters high, what is the maximum space wave communication distance possible between them? A. 18 km B. 72 km C. 164 km D. 656 km

Last Answer : B. 72 km

Description :  Find the speed and average speed of a bus which leaves salem at 4 p.m. and reaches madurai in the same day at 8 p.m. The distance between the two stations is 216 km and the total time for stoppage is 1 hour between these stations. a) 54,72 b) 62,84 c) 72,54 d) 82,64

Last Answer : C Total time taken = 4 hours; Time of stoppage = 1 hour, that is, actual time taken = 4 hours - 1 hours = 3 hours Speed = Distance/Time = 216/3 = 72 km/hr Average speed = Total Distance/ Total Time = 216/4 = 54 km/hr

Description : A bus can travel 25% faster than a jeep. Both start from point P at the same time and reach point Q, 225 kms away from P, at the same time. On the way, however, the bus lost about 37.5 minutes while stopping at the ... is the speed of the jeep? a) 64 km/hr b) 72 km/hr c) 68 km/hr d) 56 km/hr

Last Answer : B Let speed of the jeep =x kmph Then, speed of the bus =(100+25)x/100 =125x/100 =5x/4 kmph Time taken by the jeep to travel from P to Q =225/x hours Time taken by the bus to travel from p to Q =225/(5x/4) + ... 225/x=900/5x+37.5/60 225/x=180/x+37.5/60 45/x =37.5/60 37.5x=45*60 X=72 km/hr

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : On a branch line one new AT Weld with 00 probe shows a signal of 58 is. (i) DFWO* (ii) DFWR (iii) IMRW (iv) OBSW

Last Answer : i) DFWO*

Description : As per IRCA rules, the rejection limits for wheel flange thickness is - (a) 38mm (b) 25.4mm (c) 16mm* (d) 20 mm

Last Answer : (c) 16mm*

Description : 65- Grade of 72 UTS rail is? (i) 880 (ii) 1080 (iii) 710* (iv) None of above

Last Answer : (iii) 710*

Description : The colour of bag containing Portion for 72 UTS ? (i) Pink (ii) Green (iii) Red * (iv) Black

Last Answer : (iii) Red *

Description : To take care of differential cooling rail ends of 72 UTS rails are lifted by? (i) 1 to 1.5 mm (ii) 1 to 2 mm (iii) 2 to 2.5 mm (iv) 3 to 4 mm *

Last Answer : iv) 3 to 4 mm *

Description : The speed of a motor car changes from 18 km/h to 72 km/h in 5 s. Its acceleration is (a) 6 m/s2 (b) 5 m/s2 (c) 4 m/s2 (d) 3 m/s2

Last Answer : Ans:(d)

Description : A train, 1800 meters long running at the rate of 204 km/hr will cross a platform in: A) 16 B) 32 C) 45 D) 64 

Last Answer : ANSWER: B  Explanation: Speed of the train = 204 km/hr. We have to find the time in seconds, so convert the speed in the unit of m/sec. Therefore 204 km/hr = 204 x 5/18 m/s  = 1020/18 m/s  Length ... m/sec  Time = distance/speed  = 1800/(1020/18)sec  = (1800*18/1020)sec  = 32 sec (approx.)

Description : Foot over bridge must be provided on the following type of stations as per minimum essential facility criteria (a) A, B, C, & D class station (b) A,B & C class station* (c) A, & B class station (d) Only A class station

Last Answer : b) A,B & C class station*

Description : Number of sleepers required having sleeper density of M+7 for one Km of BG single line is (a) 1360 (b) 1540* (c) 1660 (d) None of the above

Last Answer : (b) 1540*

Description : The number of standard rails (13 m) for one km. BG section single line section is (a) 120 (b) 154* (c) 168 (d) 196

Last Answer : (b) 154*

Description : The index map of preliminary report should be to a scale of (a) 1 cm to 0.5 km (b) 1 cm to 1.0 km (c) 1 cm to 2.5 km* (d) 1 cm to 10.0 km

Last Answer : (c) 1 cm to 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by Index map area at a scale of 1 cm = ---- km. (a) 2.5 km* (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km

Last Answer : (a) 2.5 km*

Description : The project report of the reconnaissance survey should be accompanied by a map of the area at a scale of 1 cm= --- km. (a) 2.5 km (b) 5.0 km (c) 10.0 km (d) 15.0 km (e) 20.0 km*

Last Answer : (e) 20.0 km*

Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*

Last Answer : g) All the above*

Description : Which of the following stone is best suited for construction of piers and abutments of Railway Bridge a) Granite* b) Sandstone c) Limestone d) Quartzite

Last Answer : a) Granite*

Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000

Last Answer : b) 1, 00,000*

Description : In case of bridge is distressed category I then special restriction of___hall be imposed

Last Answer : 15 kmph

Description : In case of distressed bridge category II, ADEN shall inspect the bridge

Last Answer : once in 6 months

Description : In important bridge the total linear waterway is

Last Answer : 300 m or the total water way is 1000 sq.m.

Description : The URN of minor bridge shall be represented by its

Last Answer : ORN

Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as

Last Answer : …Shallow foundation..

Description : A bridge having super structure with “Single or duplicate girders with cross sleepers on top flanges” is classified as a) RSJ girder bridge b) Cross Girder c) Deck plate girder* d) Open web girder

Last Answer : c) Deck plate girder*

Description : While finalizing the IRBM, which of the following have been taken into account. a) Indian RailwaysGeneral Rules 1976 b) Indian Railways Code for Engineering Department 1993 c) Bridge Rules and Substructure d) All the above*

Last Answer : d) All the above*

Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk

Last Answer : b) SSE/SE/JE/ Br.*

Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method

Last Answer : c) Launching of girders with the help of a

Description : Which cement should not be used for bridge slabs ro RCC frames a) OPC b) Portland Pozzolana cement * c) Portland furnace slag cement d) Rapid hardening cement

Last Answer : b) Portland Pozzolana cement *