Description : For a major bridge, the URN would comprise of a) single digit b)eight digits* c) six digits d) four digits
Last Answer : b)eight digits*
Description : Abbreviation of URN …
Last Answer : Unique Rating Number
Description : In the eight digit code given in the rating system the first digit is called -- a) URN b) ORN* c) CRN d) None of the above
Last Answer : b) ORN*
Description : Definition of minor bridge e) Single span less than 12m f) Total linear water way less than 18m g) Both a) & b)* h) None of the above
Last Answer : g) Both a) & b)*
Description : Pipe culvert is a/an a) major bridge b) minor bridge* c) unimportant bridge d) important bridge
Last Answer : b) minor bridge*
Description : In case of distressed bridge category II, ADEN shall inspect the bridge
Last Answer : once in 6 months
Description : The embankment width in approach of the bridge shall be a) 5870 mm b) 6525 mm c) 6850 mm* d) 6000 mm
Last Answer : c) 6850 mm*
Description : In a temporary signaling arrangements for a bridge work in BG section, speed board shall be placed in advance of 30 m from the a) C.L. of the bridge b) Termination Board c) Start of the bridge/work spot* d) Caution Board
Last Answer : c) Start of the bridge/work spot*
Description : .In a temporary signaling arrangements for a bridge work in BG section, caution board shall be placed in advance of ……. m from start of the bridge/ work spot. a) 30 m b) 1200 m* c) 677 m d) 1000 m
Last Answer : b) 1200 m*
Description : Flood level gauge to be marked in a) All important bridges* b) All major bridges c) All minor & major bridges d) All bridges
Last Answer : a) All important bridges*
Description : Foot over bridge must be provided on the following type of stations as per minimum essential facility criteria (a) A, B, C, & D class station (b) A,B & C class station* (c) A, & B class station (d) Only A class station
Last Answer : b) A,B & C class station*
Description : The project report of final location survey gives tabulated statement of the following (a) Curve abstract (b) Gradient abstract (c) Bridge abstract (d) Important bridges (e) Station machinery (f) Stations and stations sites (g) All the above*
Last Answer : g) All the above*
Description : Which of the following stone is best suited for construction of piers and abutments of Railway Bridge a) Granite* b) Sandstone c) Limestone d) Quartzite
Last Answer : a) Granite*
Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000
Last Answer : b) 1, 00,000*
Description : In case of bridge is distressed category I then special restriction of___hall be imposed
Last Answer : 15 kmph
Description : In important bridge the total linear waterway is
Last Answer : 300 m or the total water way is 1000 sq.m.
Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as
Last Answer : …Shallow foundation..
Description : A bridge having super structure with “Single or duplicate girders with cross sleepers on top flanges” is classified as a) RSJ girder bridge b) Cross Girder c) Deck plate girder* d) Open web girder
Last Answer : c) Deck plate girder*
Description : While finalizing the IRBM, which of the following have been taken into account. a) Indian RailwaysGeneral Rules 1976 b) Indian Railways Code for Engineering Department 1993 c) Bridge Rules and Substructure d) All the above*
Last Answer : d) All the above*
Description : Payment to bridge staff on the section will be made by the pay clerk in the presence of a) SSE/SE/JE/ P.Way b) SSE/SE/JE/ Br.* c) SSE/SE/JE/ Works d) Office clerk
Last Answer : b) SSE/SE/JE/ Br.*
Description : At locations where access to the new bridge construction is available by rail, the launching of girders upto 18.3 m which method is ideal. a) slew in slew out method b) gantry method c) Launching of girders with the help of a BFR*: d) Pantoon method
Last Answer : c) Launching of girders with the help of a
Description : Which cement should not be used for bridge slabs ro RCC frames a) OPC b) Portland Pozzolana cement * c) Portland furnace slag cement d) Rapid hardening cement
Last Answer : b) Portland Pozzolana cement *
Description : When proposed depth of construction of a bridge is more than the existing depth of construction in a bridge work, the existing rail level requires a) Lowering b) Lifting* c) Slewing d) None
Last Answer : b) Lifting*
Description : What is the clear distance between two consecutive bridge Timbers or Girder bridge? (a) 450 mm (b) 510 mm* (c) 500 mm (d) 520 mm
Last Answer : (b) 510 mm*
Description : The clear distance between consecutive sleepers laid over unballasted bridge on BG should not exceed a)300mm b)400mm c)450mm* d)550mm
Last Answer : c)450mm*
Description : Permitted wind velocity for running of trains on the bridge a) 72 km/h* b) 58 km/h c) 64 km/h d) No limits
Last Answer : a) 72 km/h*
Description : Definition of major bridge a) Single span of 12m & above b) Total linear water way more than 18m c) Both a) & b)* d) None of the above
Last Answer : c) Both a) & b)*
Description : Length of bridge timber in BG a) outer to outer of girder plus 305mm b) 2440mm c) whichever is more in a) & b)* d) whichever is less in a) & b)
Last Answer : c) whichever is more in a) & b)*
Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*
Last Answer : d) 100 m
Description : Rail joints should be avoided within ……………of a bridge abutment. a) 6 m b) 3 m* c) 4 m d) 10 m
Last Answer : b) 3 m*
Description : The size of bridge timber required for the standard spans up to 18.3 m a) 250 x 150mm*. b) 250 x 180mm. c) 250 x 240mm d) 250 x 200mm
Last Answer : a) 250 x 150mm*.
Description : When as small area of girder bridge should be painted when requiring immediate painting; known as a) patch painting* b) periodical through painting c) Any of the above d) None of the above
Last Answer : a) patch painting*
Description : Entire steel work of girder bridge should be painted at regular interval; known as a) patch painting b) periodical through painting* c) Any of the above d) None of the above
Last Answer : b) periodical through painting*
Description : In arch bridges, Cracks/ lean/ bulge in parapet walls, Bulging or separation of spandrel from arch barrel, are the signs of distressed bridge under a) Group I b) Group II* c) Both of the above d) None of the above
Last Answer : b) Group II*
Description : Cracks in return walls/ wing walls or Slight tilting/ bulging of abutments are the signs of distressed bridge under a) Group I b) Group II* c) Both of the above d) None of the above
Description : Settlement of foundations or Tilted piers and abutments will be considered as distressed bridge as a) Group I* b) Group II c) Both of the above d) None of the above
Last Answer : a) Group I*
Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month
Last Answer : b) Once a year before monsoon*
Description : An important bridge is one which has total waterway of equal to or more than a) 1000 sq.metres.* b) 800 sq. metres c) 500 sq. metres d) 300 sq. metres
Last Answer : a) 1000 sq.metres.*
Description : In case of water crossing danger level in bridges a) speed restriction be imposed b) traffic be suspended till water recedes c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic* d) bridge watchman is to be posted
Last Answer : c) traffic be suspended till a responsible person inspects the site and declares it safe for running traffic*
Description : The minimum cushion specified over an arch bridge is -- a) 0.5m b) 0.9m c) 1.0m* d) 1.2 m
Last Answer : c) 1.0m*
Description : The minimum vertical clearance of foot over bridge gangway is a) 2100 mm b) 3660 mm c) 6525 mm d) 2710 mm
Last Answer : d) 2710 mm
Description : The vertical clearance of bottom most foot over bridge structure above rail level is a) 6525 mm* b) 3660 mm c) 5330 mm d) 6250 mm
Last Answer : a) 6525 mm*
Description : The horizontal clearance of edge of foot over bridge structure from face of platform is a) 6525 mm b) 3660 mm* c) 5330 mm d) 5300 mm
Last Answer : b) 3660 mm*
Description : Super structure of a bridge includes a) Girder/Slab* b) Abutment c) Piers d) Bed block
Last Answer : a) Girder/Slab*
Description : Sub structure of a bridge does not include a) Abutment b) Girder/Slab* c) Piers d) Wing and Return walls
Last Answer : b) Girder/Slab*
Description : In a single span bridge, the clear span is the distance between a) Centres of Abutments b) Inner faces of Abutments* c) Outer faces of Abutments d) Width of Abutment
Last Answer : b) Inner faces of Abutments*
Description : Angle of crossing of a bridge is the angle between a) C.L. of water course/road to C.L. of track* b) C.L. of water course to C.L. of pier c) C.L. of water course to normal (perpendicular) of C.L. of track d) C.L. of abutment to C.L. of pier
Last Answer : a) C.L. of water course/road to C.L. of track*
Description : Skew of a bridge is the angle between a) C.L. of water course to C.L. of track b) C.L. of water course to C.L. of pier c) C.L. of water course/road to normal (perpendicular) of C.L. of track* d) C.L. of abutment to C.L. of pier
Last Answer : c) C.L. of water course/road to normal (perpendicular) of C.L. of track*
Description : Depth of construction in a girder bridge means the depth from a) RL to HFL b) RL to top of bed block * c) RL to bottom of bed block d) RL to Bed level
Last Answer : b) RL to top of bed block *
Description : Minimum Free Board required in a bridge is a) 1 m* b) 1.20 m c) 600 mm d) 300 mm
Last Answer : a) 1 m*