What is DPC?
a) Damp proof course *  
b) weathering course  
c) Treatment the foundation  
d) Treatment over the roof

1 Answer

Answer :

a) Damp proof course *

Related questions

Description : The measurement is not made in square metres in case of (A) D.P.C. (Damp proof course) (B) Form works (C) Concrete Jeffries (D) R.C. Chhajja

Last Answer : (D) R.C. Chhajja

Description : Mastic asphalt is generally used for (A) Damp proof course (B) Water proof layer (C) Partition walls (D) Both (A) and (B

Last Answer : Answer: Option D

Description : In ordinary residential and public buildings, the damp proof course is generally provided at (A) Ground level (B) Plinth level (C) Water table level (D) Midway ground level and water-table level

Last Answer : Answer: Option B

Description : Black cotton soils are a) Heavy clay soils varying from clay to Loam, with clay content of 40 to 50% formed by decomposition of rocks by long continued weathering* b) Compacted and ... underneath d) Dark brown earthy materials formed due to partial or complete decomposition of vegetable matter

Last Answer : a) Heavy clay soils varying from clay to Loam, with clay content of 40 to 50% formed by decomposition of rocks by long continued weathering*

Description : Suggest one type of materials for water proofing for the following situations. i. Rising dampness in building ii. Leakages in dam iii. Concrete continuously in wet or damp condition iv. Leakages in lavatory ,bathroom and kitchen floor v. Cracks on plastered surface vi. Cracks on roof surface

Last Answer : i. Flexible materials like butyl rubber, hot bitumen (asphalt), plastic sheets, bituminous felts, sheets of lead. ii. Liquid applied cementitious membranes iii. Liquid applied cementitious membranes ... v. Liquid applied cementitious membranes. vi. Brick bat coba, liquid applied bituminous membrane.

Description : bridge foundation having less then 2M depth below bed level in case of arch bridges and 1.2M depth below bed level in case of other bridges is termed as

Last Answer : …Shallow foundation..

Description : Foundation and substructure of the bridge should be inspected by SE/P.Way/Works a) Once a year any time b) Once a year before monsoon* c) Once a year after monsoon d) Once in 3 month

Last Answer : b) Once a year before monsoon*

Description : Maximum tilt specified during sinking of well foundation is a) 1 in 10 b) 1 in 50 c) 1 in 100* d) 1 in 150

Last Answer : c) 1 in 100*

Description : Well foundation may be of the following type a) circular b) D type c) Double D type d) Any of the above*

Last Answer : d) Any of the above*

Description : Weep holes are provided in a) piers b) trestle piers c) foundation d) abutments*

Last Answer : d) abutments*

Description : One of the following is a shallow foundation a) Pile foundation b) Raft foundation* c) Under reamed pile foundation d) Well foundation

Last Answer : b) Raft foundation*

Description : What is the validity after supervisors course (TW-3)? (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.* (ii) 2 years (iii) 5 Years (iv) 10 Years

Last Answer : (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.*

Description : What is the validity after Refresher course for welders (TW-2)? (i) Six monyhs (ii) One year (iii) Two years.* (iv) All are wrong

Last Answer : (iii) Two years.*

Description : Type of competency certificate issued after TW-1 course? (i) Competency for two years (ii) Provisional competency.* (iii) Competency for six months (iv) Competency to do welding independently

Last Answer : (ii) Provisional competency.*

Description : What is the duration for supervisors course (TW-3)? (i) One week * (ii) Two weeks (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) One week

Description : What is the duration for Refresher course for welders (TW-2)? (i) One week* (ii) Two weeks (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) One week*

Description : What is the duration for Initial course for welders (TW-1)? (i) Two weeks* (ii) One week (iii) As decided by TPP/LKO (iv) 3 working days

Last Answer : (i) Two weeks*

Description : Angle of crossing of a bridge is the angle between a) C.L. of water course/road to C.L. of track* b) C.L. of water course to C.L. of pier c) C.L. of water course to normal (perpendicular) of C.L. of track d) C.L. of abutment to C.L. of pier

Last Answer : a) C.L. of water course/road to C.L. of track*

Description : Skew of a bridge is the angle between a) C.L. of water course to C.L. of track b) C.L. of water course to C.L. of pier c) C.L. of water course/road to normal (perpendicular) of C.L. of track* d) C.L. of abutment to C.L. of pier

Last Answer : c) C.L. of water course/road to normal (perpendicular) of C.L. of track*

Description : What is the full form of 'DPC' ? -How To ?

Last Answer : The full form of 'DPC' is Departmental Promotion Committee

Last Answer : DPC - Full Dabhol Power Company

Description : The break in service should affect promotion through normal DPC The above said statement is a. True b. False

Last Answer : a. True

Description : Indicate which of the statement is incorrect (a) The detritus tank is type of a grit chamber (b) In detritus tank, velocity of flow is further reduced (c) Grit chambers are provided in the sewage ... to remove the heavier inorganic matter as grit, sand etc. from the sewage (d) None of them*

Last Answer : (d) None of them*

Description : Pick up the correct statement from the following: (A) The cost of square rooms is less (B) The expenditure on the foundation and roof for the double storeyed building is nearly half of that ... cost of construction of a house may be minimised by restricting the height floors (D) All the above

Last Answer : Answer: Option D

Description : An ideal ware house, is provided (A) Water proof masonry walls (B) Water proof roof (C) Few windows which remain generally closed (D) All the above

Last Answer : Answer: Option D

Description : Anyone got any hints tips or ideas for the ITIL Foundation V3 Course test?

Last Answer : It’s a certification. At this point, either you know it or you don’t.

Description : Money order payable to a person who is not permanent resident within the jurisdiction of office of payment a) Will not be paid b) Payment will be made only through cheques c) Payment will be made only ... d) Can be paid in the normal course on satisfactory proof of identity of the person in the MO

Last Answer : d) Can be paid in the normal course on satisfactory proof of identity of the person in the MO

Description : Foot over bridge must be provided on the following type of stations as per minimum essential facility criteria (a) A, B, C, & D class station (b) A,B & C class station* (c) A, & B class station (d) Only A class station

Last Answer : b) A,B & C class station*

Description : Dumpy level is most suitable when (a) The instrument is to be shifted frequently (b) Fly leveling is being done over long distance (c) Many readings are to be taken from a single setting of the instrument* (d) All of the above

Last Answer : (c) Many readings are to be taken from a single setting of the instrument*

Description : What is the speed restriction to be observed for train passing? (i) Necessary speed restriction shall be observed until the grinding operation is over.* (ii) 30KMPH (iii) 45 KMPH (iv) Not required

Last Answer : (i) Necessary speed restriction shall be observed until the grinding operation is over.*

Description : The height of formation depends upon the a) Ground contours and the gradient adopted* b) Ground contour only c) Gradient adopted only d) Rainfall intensity over the year

Last Answer : a) Ground contours and the gradient adopted*

Description : A level crossing qualifies for construction of Road Over Bridge/ Under Bridge on Cost sharing basis with State Government when the Train Vehicle Unit is more than a) 50,000 b) 1, 00,000* c) 3, 00,000 d) 5, 00,000

Last Answer : b) 1, 00,000*

Description : The clear distance between consecutive sleepers laid over unballasted bridge on BG should not exceed a)300mm b)400mm c)450mm* d)550mm

Last Answer : c)450mm*

Description : The danger level should be marked with a bright red band …… wide centrally over a white band …… wide for a length of……… a) 5 cm, 10 cm, 60 cms* b) 10 cm, 20 cm, 60 cm c) 15 cm, 30 mm, 60 cm d) None of the above

Last Answer : a) 5 cm, 10 cm, 60 cms*

Description : The minimum cushion specified over an arch bridge is -- a) 0.5m b) 0.9m c) 1.0m* d) 1.2 m

Last Answer : c) 1.0m*

Description : The height gauge need to be provided in a) ROB b) RUB* c) FOB d) Fly Over

Last Answer : b) RUB*

Description : .Minimum earth cushion required over RCC Box is a) 300 mm b) 600 mm c) 0* d) 1000 mm

Last Answer : c) 0*

Description : The minimum vertical clearance of foot over bridge gangway is a) 2100 mm b) 3660 mm c) 6525 mm d) 2710 mm

Last Answer : d) 2710 mm

Description : The vertical clearance of bottom most foot over bridge structure above rail level is a) 6525 mm* b) 3660 mm c) 5330 mm d) 6250 mm

Last Answer : a) 6525 mm*

Description : The horizontal clearance of edge of foot over bridge structure from face of platform is a) 6525 mm b) 3660 mm* c) 5330 mm d) 5300 mm

Last Answer : b) 3660 mm*

Description : Temporary staging for casting PSC Box Girder for a ROB over the Railway span shall be removed a) after hardening of concrete b) before hardening of concrete c) during concreting d) after stressing the cables

Last Answer : d) after stressing the cables

Description : For A Class, the gross clearance of over maximum moving dimension for BG is (a) 100mm (b) 125mm (c) 150mm* (d) 175mm

Last Answer : (c) 150mm*

Description : For A class ODC, the gross clearance over maximum moving dimension of B.G is (a) 150mm (b) 175mm (c) 225 mm* (d) (d) 250mm

Last Answer : (c) 225 mm*

Description : O.D.C. Stands for (a) On direct current (b) Over dimensioned consignment* (c) None of them (d) Operating & gate

Last Answer : (b) Over dimensioned consignment*

Description : Maximum distance apart of trolley refuges on bridges with main spans of 100metre or more is i. 50 mtr j. 100 mtr k. 200 mtr l. a refuge over each pair*

Last Answer : l. a refuge over each pair*

Description : How to dry out a damp carpet without a heater?

Last Answer : Do you have a large fan? And I wouldn’t reccomend salt. Maybe baking soda? Then carpet steam wash it.

Description : High finish walnut table has white marks from damp fruit bowl. Any suggestions on how to remove them?

Last Answer : Oddly, one trick is to cut a walnut in half and rub over the white ring. It can be used for woods other than walnut. Another trick is to find a crayon that matches finish and rub in, then buff. Neither will have a high finish but might make table look better.

Description : What is more wet? Damp or Moist?

Last Answer : answer:MOIST.

Description : i have a area in flower bed that stays damp, what grows well in this area?

Last Answer : Need Answer

Description : my fuschia is becomming dry and brittle but soil is damp and it hangs in shade

Last Answer : Need Answer