Using a Projector to project to a very close screen (stage performance)

1 Answer

Answer :

Could you try doing a rear projection? Most projectors have a “mirror image” setting designed so that you can project onto a semi-transparent screen from behind and have the image appear correctly to people in front of the screen. The other standard way of doing this is to mount the projector (and maybe the screen) at a pretty high angle so that people’s shadows won’t get in the way. If you have a lighting designer for your show, he or she should also be able to help with these issues. (I’ll also make sure my fellow ask-public-ite and lighting designer friend reads this question).

Related questions

Description : How can I prepare a stage backdrop that serves as a projector screen at the same time?

Last Answer : That might not be a great idea because the people in front of the screen will cause shadows on the screen, but if you want an inexpensive way to do it, you could get several wooden palates stacked on top of each other with butcher paper spread out and stapled onto it.

Description : Best type of projector for reverse projection on an outdoor stage?

Last Answer : What is your budget? The town I live in just got a grant for one but I think it was over $6500.

Description : Where can I find a projector screen that 'dispenses' itself horizontally as opposed to vertically?

Last Answer : The screen I have seen used at meetings is on a track that can be pivoted to pull vertically or horizontally. Perhaps it’s an option as opposed to a standard use?

Description : Can a white sheet be used instead of a projector screen?

Last Answer : In many cases a white sheet can be used as a screen. However, you may lose some of the crispness or detail of whatever you're attempting to project.

Description : A smart classroom is a teaching space which has (i) Smart portion with a touch panel control system. (ii) PC/Laptop connection and DVD/VCR player. (iii) Document camera and specialized software (iv) Projector and screen Select the ... (C) (i), (ii) and (iii) only (D) (i), (ii), (iii) and (iv)

Last Answer : Answer: B

Description : Could I connect my XBox to a projector?

Last Answer : Yes, it is possible to set up a Xbox to a projector. It would be similar to setting up any other equipment to the projector, you just have to make sure you have the inputs on the projector that match the cord you have for your Xbox.

Description : Best Battery Powered Portable Projector?

Last Answer : answer:What projectors have you looked at? Picos are rated at 30-50 lumens, hence the ability to be battery operated a step up in quality would be the pocket projectors (200-300 lumens) that weigh ... . FAVI E3-LED-PICO and Optoma Pico PK301 Projector are top rated picos and both output 50 lumens.

Description : Suggestions for a great home theater projector under $1200?

Last Answer : answer:http://www.projectorcentral.com/ good place to start- check out the buyers guide http://www.projectorcentral.com/home_theater_buyers_guide_6.htm

Description : Given the fact that 15 years ago I still played on my zx spectrum and now I play xbox360 on a hd projector with surround sound, what do you think we will be playing in 15 years time, or what will be the next big technological advance?

Last Answer : contact lens monitors

Description : Where can I rent a projector for a day?

Last Answer : answer:Slides or old-fashioned film? We had to reborrow our old 16 mm we had given to a friend to show old family movies. I had them then transferred to video (also now out-of-date. The whole issue ... in your city? At least you can use a white sheet or wall for a screen. Happy birthday, grandma.

Description : A student focuses the image of a candle flame, placed at about 2 m from a convex lens of focal length 10 cm, on a screen. After that he moves gradually the flame towards the lens and each time focuses its ... d) What is seen on the screen when the flame is very close (at about 5 cm) to the lens?

Last Answer : (a) The student moves the lens away from the screen to focus the image because on moving the candle towards the lens, the image distance increases. (b)The size of the image increases when the object ... on the screen. A virtual image is formed behind the candle on the same side of the screen.

Description : . Chunori is a dramatic technique featuring an actor suspended in midair and moving over stage and audience. Once done using ropes, it is now executed using steel wires. In what sort of performance would you get to witness Chunori?

Last Answer : Kabuki

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : Which device shall I pick for presentations using a projector?

Last Answer : answer:Well, Nvidia, Valve and Razer have anounced small devices that would be better than the iPedo. There is the Razer Edge. It is a high spec gaming tablet PC. Has an HDMI port, but there are adapters ... of those three though, I would grab the Razer Edge, if you can live with the price that is.

Description : How to project on to a screen using a live camcorder?

Last Answer : answer:Get a video camera with a s-video output and connect it to projector that has a s-video input. Project onto a screen the video from the camera. Do you have any equipment now? Can you rent the equipment?

Description : For a shortened vertical antenna, where should a loading coil be placed to minimize losses and produce the most effective performance? A. As low as possible on the vertical radiator B. Near the center of the vertical radiator C. As close to the transmitter as possible D. At a voltage node

Last Answer : B. Near the center of the vertical radiator

Description : Which of the following would give the greatest gliding performance? a. Flight at VMD b. Flight at 1.32VMD c. Flight at the best CL/CD ratio d. Flight close to CL MAX

Last Answer : d. Flight close to CL MAX

Description : Which of the following would give the greatest gliding performance? a. Flight at VMD b. Flight at 1.32VMD c. Flight at the best CL/CD ratio d. Flight close to CL MAX

Last Answer : d. Flight close to CL MAX

Description : What is the last letter of a four letter word meaning dramatic performance on stage?

Last Answer : y for play

Description : Which one of the following is correct? A. In a multistage compressor adiabatic efficiency is less than stage efficiency B. In a multistage turbine adiabatic efficiency is less than the stage ... compressor is greater than one D. Preheat factor does not affect the multistage compressor performance

Last Answer : ANSWER : A

Description : Customers go through a two-stage buying process: The Rough Cut and the Fine Cut. In the Rough Cut, buyers focus on four product characteristics. Which one of the following is NOT one of these four product characteristics? a. Performance b. Age c. Size d. Reliability e. Price

Last Answer : b. Age

Description : What is the effect of increase in altitude on the performance of single stage reciprocating compressors? 

Last Answer : With the increase in altitude, there will be reduction in air pressure, which results in increase in compression ratio, leading to higher discharge temperature and reduced efficiency. 

Description : Which of the following learner characteristics are likely to influence the effectiveness of teaching aids and evaluation systems to ensure positive results? (A) Learner's family background, age and ... . (D) Learner's maturity level, academic perfor mance level and motivational dispositions. 

Last Answer : (D) Learner’s maturity level, academic perfor mance level and motivational dispositions.

Description : what- The ardent fans of the singer crowded close to the stage during the concert?

Last Answer : emotional

Description : The final stage of the selling process is the 1. closing 2. trial close 3. presentation 4. follow-up 5. overcoming of objection

Last Answer : follow-up

Description : The final stage of the selling process is the A)closing. B)trial close. C)presentation. D)follow-up. E)overcoming of objections.

Last Answer : D)follow-up

Description : VNC shows ipod screen too close?

Last Answer : answer:Which VNC program is it? There’s an option in TightVNC Viewer to scale the image in the client computer, which would solve the problem.

Description : What is a manual brake close screen testing line for my car radio?

Last Answer : Need answer

Description : Can I attach the Willow Hurdles screen fence to my deck to close off the outdoor stairway?

Last Answer : You could use fence staples if you want it permanent.

Description : Which of the following condition is essential for observing Fraunhofer diffraction? A. Source must be close to slit and screen should be at infinite distance B. Both source and screen must be close to ... infinity and screen should be close to the slit D. Both source and screen must be at infinity

Last Answer : D. Both source and screen must be at infinity

Description : If I were to ask you for the first song that comes to your mind from a musical [stage/screen] what might your selection be?

Last Answer : answer:“If I were a rich man…..” Did you want to know the name of the musical as well?

Description : Which is the only phone which is powerful and gives best performance -Technology

Last Answer : It is iphone 12 which is the best phone till now. No other phone can beat this iphone 12.

Description : The software that helps the computer in maintaining its performance is called ………….. -Technology

Last Answer : The software that helps the computer in maintaining its performance is calledUtility software.

Description : Rama is preparing a presentation on her company’s annual performance. She wants some text present on a slide to fly in from the left, -Technology

Last Answer : (c) Custom Animation can be used for the desired functionality.

Description : Herman Cain -- Serious candidate for president, or best comedy performance art project in US history?

Last Answer : There was an interview where he was asked whether or not he agreed with Obama’s actions in Libya. He just sat there, and did not know what to say. Afterwards he was asked by a reporter if that shows that he has no idea about foreign policy, and he responded by shouting “999”. Serious candidate? No.

Description : Project performance consists of (A) Time (B) Cost (C) Quality (D) All of the above

Last Answer : (C) Quality

Description : Which one of the following statements best defines teamwork? a. People working collaboratively towards a common goal. b. Developing skills that will enhance project performance. c. Gathering the ... together to work on a project. d. Establishing vision and direction towards a common purpose.

Last Answer : a. People working collaboratively towards a common goal.

Description : . The process that evaluates overall project performance to provide confidence is called: a. quality assurance. b. quality planning. c. quality control. d. quality audit.

Last Answer : a. quality assurance.

Description : A(n) _ is a review of the quality plan, procedures, data collection, and analysis by  an outside group. Select one: a. scope document b. project appraisal c. cost performance index d. analogous estimate e. quality audit

Last Answer : e. quality audit

Description : Fill in the blanks. It is during the ______________ phase that the decision should be  made regarding whether the project should continue. During this phase, ____________  must be considered and weighed ... . closeout, resources c. execution, performance d. planning, timing e. initiation, risk

Last Answer : e. initiation, risk

Description : Which of the following project baselines provides the basis for measurement of  the expected cash flow against requirements over time and is often displayed as an  S curve? Select one: a. Schedule baseline b. Cost performance baseline c. Scope baseline d. Plan baseline e. Initiation baseline

Last Answer : b. Cost performance baseline

Description : The purpose of project planning is to identify various areas of the project work and the  influencing factors, and subsequently define the boundaries of the project performance.  (True/False)

Last Answer : Ans. True

Description : Project performance consists of (A)Time (B)Cost (C)Quality (D)All of the above

Last Answer : (D)All of the above

Description : Effective project management focuses on the four P’s. What are those  four P’s? a. People, performance, payment, product b. People, product, process, project c. People, product, performance, project d. All of the above.

Last Answer : b. People, product, process, project

Description : Which of these characteristics are used to determine the scope of a project? a. Only performance. b. Only context. c. Information objectives, function, performance d. None of the above.

Last Answer : c. Information objectives, function, performance

Description : In tracking, reporting and controlling, the process engage whether the project results are in accordance with a. project plans b. performance specification c. both a, b d. none of the above

Last Answer : c. both a, b

Description :  A project with total budget cost of 30 crores is scheduled to be completed in 80 weeks. A periodic review was carried out at end of 60 weeks and results are as given:  Budgeted cost of work performed (EV) = 17 ... crores What is the cost performance index?  A.0.895  B.0.81  C.0.90  D.1.12

Last Answer : A.0.895

Description : A cost performance index (CPI) of 0.89 means:  A. At this time, we expect the total project to cost 89 percent more than planned  B. When the project is completed we will have spent 89 ... at 89 percent of the rate planned  D. The project is only getting 89 cents out of every dollar invested

Last Answer : D. The project is only getting 89 cents out of every dollar invested

Description : Project Manager must ensure that it develops appropriate trade off/s as  A. Time, cost and performance  B. Time, value and performance  C.Men, Materials and Machines  D.Money, Cost and Return on Investment

Last Answer : A. Time, cost and performance

Description : Which risk is connected to the circumstance outside the project that may influence the  scope of work and the performance of the organization?  A.Operational Risk  B.Financial Risk  C.Strategic Risk  D.Contextual Risk

Last Answer : D.Contextual Risk