A 6 month project in R&D costs____________; while a 12 month project in R&D costs ________. a. 1,000,000; 1,500,000
b. 650,000; 850,000
c. 500,000; 1,000,000
d. 750,000; 1,000,000
e. 1,000,000; 750,000

1 Answer

Answer :

c. 500,000; 1,000,000

Related questions

Description : Repositioning moves a product on the Perceptual Map from its old location to a new one. When does the new location become active? a. The day the R&D project completes b. The following year ... R&D project completes d. The day capacity and automation is purchased e. The day capacity is purchased

Last Answer : a. The day the R&D project completes

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.

Description : Investing in Quality Function Deployment Effort can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce R&D cycle time and increase demand. d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets. e. increase demand.

Last Answer : d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets.

Description : Investing in Vendor Just In Time can a. reduce material costs and R&D cycle time. b. reduce administrative costs and labor costs. c. reduce R&D cycle time and increase demand. d. reduce material costs and administrative costs. e. reduce material costs and increase demand.

Last Answer : d. reduce material costs and administrative costs.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : Within the process management initiatives, concurrent engineering a. reduces material cost, inventors’ carrying costs and administrative overhead. b. reduces labor costs. c. increases the effectiveness of the sales budget and therefore demand. d. reduces R&D cycle time. e. none of the above.

Last Answer : d. reduces R&D cycle time.

Description : Within the Process Management Initiatives, channel support systems a. reduce material cost. b. reduce labor costs. c. increase demand. d. reduce R&D cycle time. e. none of the above.

Last Answer : c. increase demand.

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : Period costs include a. R&D. b. promotion. c. sales and administration expenses. d. all of the above.

Last Answer : d. all of the above.

Description : Investing in Concurrent Engineering can a. reduce R&D cycle time. b. reduce labor and administrative costs. c. increase demand and reduce labor costs d. reduce R&D cycle time and increase demand.

Last Answer : a. reduce R&D cycle time.

Description : Investing in CPI can a. reduce administrative costs. b. reduce material and administrative costs. c. reduce material costs. d. reduce labor costs and reduce R&D cycle time.

Last Answer : c. reduce material costs.

Description : What does not drive length of R&D project? a. The product's automation level on the Production line. b. The amount of money You are willing to spend on it. c. The number of R&D projects underway ... of the product's new location to an existing product in your company's line. e. The labor strike.

Last Answer : The labor strike.

Description : R&D project length can be as long as ___________. a. 3 months b. 2 years c. 1 year d. 3 years

Last Answer : d. 3 years

Description : A small dairy farm daily produces 100 kilograms of average quality buffalo milk and sells it to an organised dairy at the rate of Rs. 100 per kilogram of total solids contained in the milk. How much would be the daily gross ... (D) Between Rs. 1,000 and Rs. 1,100 (E) Between Rs. 1,650 and Rs. 1,850

Last Answer : (B) Between Rs. 1,250 and Rs. 1,400

Description : When working with Outside Sales, each salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : d. $125,000.

Description : When working with inside sales, each inside salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : c. $50,000.

Description : What is most likely to happen on introduction of a new product, if you do not buy the production line, in the year prior to the product's introduction? a. You cannot manufacture your new product. b. ... new product would stock out and there would be a loss in sales revenue. e. None of the above.

Last Answer : a. You cannot manufacture your new product.

Description : .Finance Decisions should be made a. before the other departments enter their decisions. b. at any time. c. after the other departments have entered their decisions. d. after the R&D department has entered its decisions. e. none of the above.

Last Answer : c. after the other departments have entered their decisions.

Description : .A functional manager is responsible for a. one of the five market segments. b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI. c. one of the five products in the starting product line. d. none of these. e. monitoring competitors in their entirety.

Last Answer : b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI.

Description : These TQM initiatives reduce administrative overhead; reduces the R&D cycle time and enhances the effectiveness of the promotion and sales budget. a. Concurrent Engineering (CCE); Channel Support systems ... Inventory d. Channel Support systems and Six Sigma e. Quality Initiative Training (QIT)

Last Answer : b. Quality Function Deployment and Benchmarking

Description : This process management initiative reduces R&D cycle time, a. Concurrent Engineering (CCE) b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)

Description : Using the R&D Spreadsheet to design your products, you have which of the following projects to choose from? a. Repositioning b. Invention c. Reliability adjustment d. All of the above e. None of the above

Last Answer : d. All of the above

Description : How can the R&D cycle time be reduced? a. Increasing automation levels b. Budgeting money to quality initiatives c. Increasing R&D budget d. Decreasing product portfolio e. Decreasing capacity

Last Answer : b. Budgeting money to quality initiatives

Description : R&D projects can drive a product’s: a. size. b. age. c. reliability. d. performance. e. all of the above.

Last Answer : e. all of the above.

Description : R&D completion time depends on a. number of projects in R&D. b. automation rating. c. similarity to existing products. d. size of the product. e. a, b, and c.

Last Answer : e. a, b, and c.

Description : R&D completion time can be diminished a. by repositioning a product. b. the more a company changes a product’s MTBF. c. when several products are put into R&D at the same time. d. when a company takes advantage of existing technology. e. none of the above.

Last Answer : d. when a company takes advantage of existing technology.

Description : When an R&D effort started in 2001 completes on September 15, 2002, the product revision kicks in a. October 1, 2002. b. immediately upon completion. c. January 1, 2003. d. R&D has no effect on product revisions. e. September 15, 2003.

Last Answer : b. immediately upon completion.

Description : Which one is not an area in which Capstone® separates company activities? a. Marketing b. Production c. R&D d. Logistics e. TQM

Last Answer : d. Logistics

Description : Soon to be set up India Post Payments Bank will have how many branches in the country? A) 650 B) 550 C) 500 D) 750 E) 600

Last Answer : A) 650 Explanation: The communications and IT minister Ravi Shankar Prasad has said that all 650 branches of the payment bank set up by the department of posts will be established by September 2017.

Description : The compound interest accrued on an amount of Rs. 25,500 at the end of three years is Rs. 8,440.5.What would be the simple interest accrued on the same amount at the same rate in the same period? a) Rs. 5,450/- b) Rs. 8,750/- c) Rs. 4,350/- d) Rs. 3,650/- e) Rs. 7,650/- 

Last Answer : A = P + Interest = 25500 + 8440.5 = 33940.5 A = P + 1 + (R/100)^3 33940.5 = 25500 a + R/100)^3 a + R/100)^3 = 33940.5 / 25500 a + R/100)^3 = 1.331 a + R/100)^3 = ... R = 10% Simple Interest = Principle Rate Time / 100 = 25500 10 3/100 = 7650 Answer: e)

Description : Companies can enter a Recruiting Spend budget up to an additional ____. a. $5,000 b. $7,500 c. $10,000 d. $20,000 e. $50,000

Last Answer : a. $5,000

Description : If you want to add 500,000 units of capacity to an assembly line with an automation rating of 5, how much will it cost? a. 1,200,000 b. 1,300,000 c. 13,000,000 d. 24,000,000 e. 26,000,000

Last Answer : c. 13,000,000

Description : When working with Distributors, each distributor costs a. $35,000. b. $100,000. c. $50,000. d. $125,000.

Last Answer : b. $100,000.

Description : Your ___________ department controls the performance and size, therefore position of your sensor products within the market. a. Planning b. Finance c. R&D d. Marketing

Last Answer : c. R&D

Description : A point or some points you consider for your strategy are a. strive to give your customers the top two buying criteria. b. the perceptual map is more important as a rough cut consideration than a fine cut ... , it does not matter how good your product is if you stock out. d. all of the above.

Last Answer : d. all of the above.

Description : If you reduce automation in the production component of Marketing, you will: a. slow down R&D designs. b. incur a retooling cost. c. lose the game. d. none of the above.

Last Answer : b. incur a retooling cost.

Description : TQM initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required to design, ... quality resulting in improved cost structures. e. improve product quality and business procedures.

Last Answer : b. improve product quality while reducing the time and resources required to design, manufacture, warehouse and ship products.

Description : Capital employed is Rs.50,000 Trading Profit amounted Rs.12,200, Rs.15,000 and Rs.2000 loss for 2016, 2017 and 2018 respectively. Rate of interest is 8% and the rate of risk is 2% Remuneration from alternative employment of the ... A Rs.8,000 B Rs.8,800 C Rs.8,850 D Rs.9,500 ANS: Rs.8,850

Last Answer : A

Description : Process Management Initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required ... improved efficiencies and costs structures. d. improve product quality and business procedures.

Last Answer : a. improve business procedures, resulting in improved efficiencies and cost structures.

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : If the purchases made during the year were Rs. 60,000, the balance of stock in trade at the beginning and at the end of the year were Rs. 12,000 and Rs. 9,000 respectively and the gross profit on sales was 1/5th, when which ... year ? (A) Rs. 15,750 (B) Rs. 14,000 (C) Rs. 12,500 (D) Rs. 17,250

Last Answer : Answer: Rs. 12,500

Description : Transmission of oil should be changed after every working hours about a) 550 hours b) 650 hours c) 70 hours d) 850 hours

Last Answer : c) 70 hours

Description : Ceramic recuperators (made of SiC) is economical, only when used for preheating combustion air above __________ °C. (A) 250 (B) 650 (C) 850 (D) 1000

Last Answer : (B) 650

Description : The temperature at which plastic layer formation takes place during carbonisation of coal varies from __________ °C. (A) 100 to 150 (B) 350 to 450 (C) 550 to 650 (D) 700 to 850

Last Answer : (B) 350 to 450

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : Adding one additional unit of capacity costs a. $4 x Change (difference) in Automation Level b. $6 + ($4 x Current Automation Level). c. $6 x Change (difference) in Automation Level. d. $4 + ($6 x Current Automation Level). e. none of these.

Last Answer : b. $6 + ($4 x Current Automation Level).

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : This process management initiative reduces material costs and administrative overhead. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : b. Vendor/Just-in-Time Inventory (JIT)