Process Management Initiatives
a. improve business procedures, resulting in improved efficiencies and cost  structures.
b. improve product quality while reducing the time and resources required to design,  manufacture, warehouse and ship products.
c. improve business procedures and product quality, resulting in improved efficiencies and  costs structures.
d. improve product quality and business procedures.

1 Answer

Answer :

a. improve business procedures, resulting in improved efficiencies and cost  structures.

Related questions

Description : TQM initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required to design, ... quality resulting in improved cost structures. e. improve product quality and business procedures.

Last Answer : b. improve product quality while reducing the time and resources required to design, manufacture, warehouse and ship products.

Description : Within the process management initiatives, concurrent engineering a. reduces material cost, inventors’ carrying costs and administrative overhead. b. reduces labor costs. c. increases the effectiveness of the sales budget and therefore demand. d. reduces R&D cycle time. e. none of the above.

Last Answer : d. reduces R&D cycle time.

Description : Within the Process Management Initiatives, channel support systems a. reduce material cost. b. reduce labor costs. c. increase demand. d. reduce R&D cycle time. e. none of the above.

Last Answer : c. increase demand.

Description : This process management initiative reduces material cost and, to a lesser degree, labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : c. Continuous Product Improvement systems (CPI)

Description : These TQM initiatives reduce administrative overhead; reduces the R&D cycle time and enhances the effectiveness of the promotion and sales budget. a. Concurrent Engineering (CCE); Channel Support systems ... Inventory d. Channel Support systems and Six Sigma e. Quality Initiative Training (QIT)

Last Answer : b. Quality Function Deployment and Benchmarking

Description : How can the R&D cycle time be reduced? a. Increasing automation levels b. Budgeting money to quality initiatives c. Increasing R&D budget d. Decreasing product portfolio e. Decreasing capacity

Last Answer : b. Budgeting money to quality initiatives

Description : This process management initiative reduces material costs and administrative overhead. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : b. Vendor/Just-in-Time Inventory (JIT)

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : Customer demand is driven by a. price, product, promotion and TQM/Process Initiatives. b. customer survey. c. positioning and price. d. market share. e. market share, positioning and price.

Last Answer : b. customer survey.

Description : This process management initiative reduces labor costs. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Channel Support systems d. Quality Initiative Training (QIT)

Last Answer : d. Quality Initiative Training (QIT)

Description : In the Capstone® simulation, what are the components of a product's material cost? a. Cost of Inventory on hand and the cost to store it b. Reliability component cost and positioning component ... , shipping and handling d. Level of automation and product reliability e. None of the above

Last Answer : b. Reliability component cost and positioning component cost

Description : What is most likely to happen on introduction of a new product, if you do not buy the production line, in the year prior to the product's introduction? a. You cannot manufacture your new product. b. ... new product would stock out and there would be a loss in sales revenue. e. None of the above.

Last Answer : a. You cannot manufacture your new product.

Description : Which of the following initiatives of dynamic cloud infrastructure reduce operating cost , improve responsiveness and utilize resources? A. Asset management. B. Virtualization and Consolidation. C. Service Management. D. Information Infrastructure.

Last Answer : Virtualization and Consolidation.

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : This process management initiative reduces R&D cycle time, a. Concurrent Engineering (CCE) b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)

Description : This process management initiative increases the effectiveness of the Sales Budget and therefore demand. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : d. Channel Support systems

Description : .A functional manager is responsible for a. one of the five market segments. b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI. c. one of the five products in the starting product line. d. none of these. e. monitoring competitors in their entirety.

Last Answer : b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI.

Description : Investing in Quality Function Deployment Effort can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce R&D cycle time and increase demand. d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets. e. increase demand.

Last Answer : d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : A 6 month project in R&D costs____________; while a 12 month project in R&D costs ________. a. 1,000,000; 1,500,000 b. 650,000; 850,000 c. 500,000; 1,000,000 d. 750,000; 1,000,000 e. 1,000,000; 750,000

Last Answer : c. 500,000; 1,000,000

Description : Higher automation leads to lower production costs and has what effect on repositioning a product on the perceptual map? a. makes it more difficult and expensive b. makes it easier and cheaper c. no effect d. eliminates repositioning

Last Answer : a. makes it more difficult and expensive

Description : )Which of the following is NOT one of the primary needs for good project scheduling? 1. Cutting costs and reducing time  2. Decreasing the time required for decision making  3. Eliminating idle time  4. Developing better trouble shooting procedures.

Last Answer : 4. Developing better trouble shooting procedures.

Description : Using the R&D Spreadsheet to design your products, you have which of the following projects to choose from? a. Repositioning b. Invention c. Reliability adjustment d. All of the above e. None of the above

Last Answer : d. All of the above

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : Which three factors drive labor cost? a. Production capacity b. Wage and benefit rates c. Automation levels d. Second shift/Overtime costs e. b, c, d

Last Answer : e. b, c, d

Description : The strategy of adjusting and optimising energy using systems and procedures so as to reduce energy requirements per unit of output while holding constant or reducing total cost of producing the output from the ... is . a) Energy Management b) Energy audit c) Energy utilisation d) Energy wastage

Last Answer : Energy Management

Description : What does not drive length of R&D project? a. The product's automation level on the Production line. b. The amount of money You are willing to spend on it. c. The number of R&D projects underway ... of the product's new location to an existing product in your company's line. e. The labor strike.

Last Answer : The labor strike.

Description : If a product's Automation rating is substantially increased, it will: a. take longer to move the product across the Perceptual Map. b. take a shorter time to move the product across the Perceptual Map. ... Perceptual Map. d. have no effect on the product moving across the Perceptual Map. e. other.

Last Answer : a. take longer to move the product across the Perceptual Map.

Description : R&D completion time depends on a. number of projects in R&D. b. automation rating. c. similarity to existing products. d. size of the product. e. a, b, and c.

Last Answer : e. a, b, and c.

Description : R&D completion time can be diminished a. by repositioning a product. b. the more a company changes a product’s MTBF. c. when several products are put into R&D at the same time. d. when a company takes advantage of existing technology. e. none of the above.

Last Answer : d. when a company takes advantage of existing technology.

Description : What’s the measure for product reliability? a. Return rates of products sold b. Customers’ happiness statements c. Expected time a product lasts d. Price e. All of the above

Last Answer : c. Expected time a product lasts

Description : n Capstone® a. the terms age and perceived age are not used interchangeably. b. the term MTBF means multiple transient business format. c. the terms age and perceived age are used interchangeably. d. all products will eventually have to be retired. e. none of the above.

Last Answer : c. the terms age and perceived age are used interchangeably.

Description : How many products does every team start with? a. One product b. Four products c. Ten products d. Five products e. None of the above

Last Answer : d. Five products

Description : f there are two identical products, one that has 100% accessibility and one that has 0% accessibility, a. the one with 0% accessibility will not sell at all because consumers can't find ... product with 100% accessibility will outsell the other 3 to 1 providing all other attributes are identical.

Last Answer : b. the product with 100% accessibility will outsell the other 2 to 1 providing all other attributes are identical.

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.

Description : Investing in Concurrent Engineering can a. reduce R&D cycle time. b. reduce labor and administrative costs. c. increase demand and reduce labor costs d. reduce R&D cycle time and increase demand.

Last Answer : a. reduce R&D cycle time.

Description : Investing in Vendor Just In Time can a. reduce material costs and R&D cycle time. b. reduce administrative costs and labor costs. c. reduce R&D cycle time and increase demand. d. reduce material costs and administrative costs. e. reduce material costs and increase demand.

Last Answer : d. reduce material costs and administrative costs.

Description : What are the drivers of Material Costs? a. Higher performance b. Smaller size c. Higher Mean Time Between Failure (MTBF) d. All of the above e. None of the above

Last Answer : d. All of the above

Description : Investing in CPI can a. reduce administrative costs. b. reduce material and administrative costs. c. reduce material costs. d. reduce labor costs and reduce R&D cycle time.

Last Answer : c. reduce material costs.

Description : Which of the following is an example of a TQM initiative? a. Continuous Process Improvement b. Just-in-Time [Inventory] c. Quality Function Deployment Effort d. Channel Support Systems

Last Answer : c. Quality Function Deployment Effort

Description : Taylor and Deming would have both agreed that (a) Whirlpool's global strategy is a good one (b) Eli Whitney was an important contributor to statistical theory (c) Management must do more to ... be improved (d) The era of Operations Management will be succeeded by the era of scientific management

Last Answer : (c) Management must do more to improve the work environment and its processes so that quality can be improved

Description : In the question a part of the sentence is given in BOLD. Alternatives to the BOLD part are given which may improve the construction of the sentence. Select the correct alternative. In addition ... (b) of enhancing their reputation (c) to enhancing their reputation (d) No correction required

Last Answer : (c) to enhancing their reputation

Description : Period costs include a. R&D. b. promotion. c. sales and administration expenses. d. all of the above.

Last Answer : d. all of the above.

Description : Investments in training leads to a __________ and _________. a. higher costs, higher turnover b. higher productivity, lower turnover c. lower productivity, lower turnover d. none of the above

Last Answer : b. higher productivity, lower turnover

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : Adding one additional unit of capacity costs a. $4 x Change (difference) in Automation Level b. $6 + ($4 x Current Automation Level). c. $6 x Change (difference) in Automation Level. d. $4 + ($6 x Current Automation Level). e. none of these.

Last Answer : b. $6 + ($4 x Current Automation Level).