R&D completion time can be diminished
a. by repositioning a product.
b. the more a company changes a product’s MTBF.
c. when several products are put into R&D at the same time.
d. when a company takes advantage of existing technology.
e. none of the above.

1 Answer

Answer :

d. when a company takes advantage of existing technology.

Related questions

Description : R&D completion time depends on a. number of projects in R&D. b. automation rating. c. similarity to existing products. d. size of the product. e. a, b, and c.

Last Answer : e. a, b, and c.

Description : Using the R&D Spreadsheet to design your products, you have which of the following projects to choose from? a. Repositioning b. Invention c. Reliability adjustment d. All of the above e. None of the above

Last Answer : d. All of the above

Description : Repositioning moves a product on the Perceptual Map from its old location to a new one. When does the new location become active? a. The day the R&D project completes b. The following year ... R&D project completes d. The day capacity and automation is purchased e. The day capacity is purchased

Last Answer : a. The day the R&D project completes

Description : What does not drive length of R&D project? a. The product's automation level on the Production line. b. The amount of money You are willing to spend on it. c. The number of R&D projects underway ... of the product's new location to an existing product in your company's line. e. The labor strike.

Last Answer : The labor strike.

Description : What is most likely to happen on introduction of a new product, if you do not buy the production line, in the year prior to the product's introduction? a. You cannot manufacture your new product. b. ... new product would stock out and there would be a loss in sales revenue. e. None of the above.

Last Answer : a. You cannot manufacture your new product.

Description : When an R&D effort started in 2001 completes on September 15, 2002, the product revision kicks in a. October 1, 2002. b. immediately upon completion. c. January 1, 2003. d. R&D has no effect on product revisions. e. September 15, 2003.

Last Answer : b. immediately upon completion.

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : The relative cost of a product’s material cost increases as: a. size is increased. b. performance is decreased. c. MTBF is raised. d. automation stays the same. e. all of the above.

Last Answer : c. MTBF is raised.

Description : What is one drawback of increasing automation? a. The product requires increased time/expense for subsequent short-move repositioning. b. Operating second shift becomes more expensive. c. ... d. Automation slows production capability. e. It requires more employees for the production line.

Last Answer : a. The product requires increased time/expense for subsequent short-move repositioning.

Description : .A functional manager is responsible for a. one of the five market segments. b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI. c. one of the five products in the starting product line. d. none of these. e. monitoring competitors in their entirety.

Last Answer : b. R&D, Marketing, Production, Finance, Human Resources, and TQM/PI.

Description : Pricing plays a role a. when repositioning a product. b. in the rough cut stage of the purchase decision. c. in neither stage of the purchase decision. d. in the fine cut stage of the purchase decision. e. in both b and d.

Last Answer : e. in both b and d.

Description : Higher automation leads to lower production costs and has what effect on repositioning a product on the perceptual map? a. makes it more difficult and expensive b. makes it easier and cheaper c. no effect d. eliminates repositioning

Last Answer : a. makes it more difficult and expensive

Description : n Capstone® a. the terms age and perceived age are not used interchangeably. b. the term MTBF means multiple transient business format. c. the terms age and perceived age are used interchangeably. d. all products will eventually have to be retired. e. none of the above.

Last Answer : c. the terms age and perceived age are used interchangeably.

Description : The reliability component cost of a product with a 17,000 hour MTBF rating is: a. $5.10. b. $17.00. c. $51.00. d. $170. e. cost cannot be determined with information given.

Last Answer : a. $5.10.

Description : R&D projects can drive a product’s: a. size. b. age. c. reliability. d. performance. e. all of the above.

Last Answer : e. all of the above.

Description : Your ___________ department controls the performance and size, therefore position of your sensor products within the market. a. Planning b. Finance c. R&D d. Marketing

Last Answer : c. R&D

Description : These TQM initiatives reduce administrative overhead; reduces the R&D cycle time and enhances the effectiveness of the promotion and sales budget. a. Concurrent Engineering (CCE); Channel Support systems ... Inventory d. Channel Support systems and Six Sigma e. Quality Initiative Training (QIT)

Last Answer : b. Quality Function Deployment and Benchmarking

Description : This process management initiative reduces R&D cycle time, a. Concurrent Engineering (CCE) b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)

Description : How can the R&D cycle time be reduced? a. Increasing automation levels b. Budgeting money to quality initiatives c. Increasing R&D budget d. Decreasing product portfolio e. Decreasing capacity

Last Answer : b. Budgeting money to quality initiatives

Description : Which one is not an area in which Capstone® separates company activities? a. Marketing b. Production c. R&D d. Logistics e. TQM

Last Answer : d. Logistics

Description : A point or some points you consider for your strategy are a. strive to give your customers the top two buying criteria. b. the perceptual map is more important as a rough cut consideration than a fine cut ... , it does not matter how good your product is if you stock out. d. all of the above.

Last Answer : d. all of the above.

Description : What are the drivers of Material Costs? a. Higher performance b. Smaller size c. Higher Mean Time Between Failure (MTBF) d. All of the above e. None of the above

Last Answer : d. All of the above

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : How much does it cost for MTBF per 1,000 hours of reliability? a. $0.50 b. $0.40 c. $0.30 d. $0.20 e. $0.10

Last Answer : c. $0.30

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : The customer survey score is driven by a. market share. b. price. c. 4P’s. d. price and market share. e. perceptual map, MTBF and price.

Last Answer : c. 4P’s.

Description : All of the following are direct implications of hiring a second shift except: a. increased production capacity. b. paying higher wages to second shift. c. training costs. d. increased MTBF. e. recruitment costs.

Last Answer : d. increased MTBF.

Description : Changing MTBF will: a. have no impact on Perceived Age. b. increase Perceived Age. c. decrease Perceived Age. d. change Perceived Age. e. is undetermined.

Last Answer : a. have no impact on Perceived Age.

Description : MTBF is measured in a. day increments. b. hour increments. c. minute increments. d. 30-minute increments. e. 15-minute increments.

Last Answer : b. hour increments.

Description : What is one way to lower material costs? a. decrease MTBF b. increase capacity c. increase automation d. none of the above

Last Answer : a. decrease MTBF

Description : .Finance Decisions should be made a. before the other departments enter their decisions. b. at any time. c. after the other departments have entered their decisions. d. after the R&D department has entered its decisions. e. none of the above.

Last Answer : c. after the other departments have entered their decisions.

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.

Description : Investing in Quality Function Deployment Effort can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce R&D cycle time and increase demand. d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets. e. increase demand.

Last Answer : d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets.

Description : Investing in Vendor Just In Time can a. reduce material costs and R&D cycle time. b. reduce administrative costs and labor costs. c. reduce R&D cycle time and increase demand. d. reduce material costs and administrative costs. e. reduce material costs and increase demand.

Last Answer : d. reduce material costs and administrative costs.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : Within the process management initiatives, concurrent engineering a. reduces material cost, inventors’ carrying costs and administrative overhead. b. reduces labor costs. c. increases the effectiveness of the sales budget and therefore demand. d. reduces R&D cycle time. e. none of the above.

Last Answer : d. reduces R&D cycle time.

Description : Within the Process Management Initiatives, channel support systems a. reduce material cost. b. reduce labor costs. c. increase demand. d. reduce R&D cycle time. e. none of the above.

Last Answer : c. increase demand.

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : A 6 month project in R&D costs____________; while a 12 month project in R&D costs ________. a. 1,000,000; 1,500,000 b. 650,000; 850,000 c. 500,000; 1,000,000 d. 750,000; 1,000,000 e. 1,000,000; 750,000

Last Answer : c. 500,000; 1,000,000

Description : Investing in Concurrent Engineering can a. reduce R&D cycle time. b. reduce labor and administrative costs. c. increase demand and reduce labor costs d. reduce R&D cycle time and increase demand.

Last Answer : a. reduce R&D cycle time.

Description : Investing in CPI can a. reduce administrative costs. b. reduce material and administrative costs. c. reduce material costs. d. reduce labor costs and reduce R&D cycle time.

Last Answer : c. reduce material costs.

Description : Period costs include a. R&D. b. promotion. c. sales and administration expenses. d. all of the above.

Last Answer : d. all of the above.

Description : R&D project length can be as long as ___________. a. 3 months b. 2 years c. 1 year d. 3 years

Last Answer : d. 3 years

Description : If you reduce automation in the production component of Marketing, you will: a. slow down R&D designs. b. incur a retooling cost. c. lose the game. d. none of the above.

Last Answer : b. incur a retooling cost.

Description : Rapid movement of an existing product on the Perceptual Map requires a. reliability adjustment. b. low automation levels. c. high automation levels. d. none of the above.

Last Answer : b. low automation levels.

Description : What is the minimum amount of time that it takes to create a new product? a. 3 months b. 6 months c. 1 year d. 2 years e. 5 years

Last Answer : c. 1 year

Description : It takes ______ years to invent a product. a. 3 or 4 months b. 6 months c. More than 1 year but no more than 3 years d. More than 3 years

Last Answer : c. More than 1 year but no more than 3 years