. One of the more daunting challenges of managing a test project is that so many
dependencies converge at test execution. One missing configuration file or hard ware
device can render all your test results meaning less. You can end up with an entire
platoon of testers sitting around for days. Who is responsible for this incident?
A. Test managers faults only
B. Test lead faults only
C. Test manager and proj

1 Answer

Answer :

A. Test managers faults only

Related questions

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : Benefits of Independent Testing a) Independent testers are much more qualified than Developers b) Independent testers see other and different defects and are unbiased. c) Independent Testers cannot identify defects. d) Independent Testers can test better than developers

Last Answer : b) Independent testers see other and different defects and are unbiased.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester or developer IV. Dependencies of the change request.

Last Answer : A. Improve super vision, More reviews of artifacts or program means stage containment of the defects.

Description : Change request should be submitted through development or program management. A change request must be written and should include the following criteria. I. Definition of the change II. Documentation to be updated III. Name of the tester ... and IV B. I, II and III C. II, III and IV D. I, II and IV

Last Answer : D. I, II and IV

Description : A test manager wants to use the resources available for the automated testing of a web application. The best choice is A. Test automater, web specialist, DBA, test lead B. Tester, test automater, web ... C. Tester, test lead, test automater, DBA D. Tester, web specialist, test lead, test automater

Last Answer : B. Tester, test automater, web specialist, DBA

Description : : Load Testing Tools _______ A. Reduces the time spent by the testers B. Reduces the resources spent like hardware C. Are mostly used in web testing D. All of the above

Last Answer : D. All of the above

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : The most successful project manager usually: 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience with formal ... . Has considerable experience as a functional manager before moving into the project  management arena.

Last Answer : 1. works their way up from assistants in the project office to full-fledged project managers,  supplementing that experience

Description : Which of the following is the task of a Test Lead / Leader: i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the ... is true and ii,iii,iv are false d) iii and iv is correct and i and ii are incorrect

Last Answer : a) i, ii, iii is true and iv is false

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : Which of the following is not phase of the Fundamental Test Process? a) Test Planning and Control b) Test implementation and Execution c) Requirement Analysis d) Evaluating Exit criteria and reporting

Last Answer : c) Requirement Analysis

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : The structure of an incident report is covered in the Standard for Software Test Documentation IEEE 829 and is called as : - a) Anomaly Report b) Defect Report c) Test Defect Report d) Test Incident Report

Last Answer : a) Anomaly Report

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : A project manager has been transferred to a major software development project that is in the implementation phase. The highest priority for this projectmanager should be to A. Establish a relationship with ... the manager' s management style D. Ensure that the project proceeds at its current pace

Last Answer : B. Learn the project objectives and the existing project plan

Description : Test cases are designed during: a) test recording. b) test planning. c) test configuration. d) test specification.

Last Answer : d) test specification.

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : What is NOT a test log? A. Maps the test results to requirements B. Records test activities C. Maintains control over the test D. Contains pass or fail results.

Last Answer : A. Maps the test results to requirements

Description : A test plan defines A. What is selected for testing B. Objectives and results C. Expected results D. Targets and misses

Last Answer : B. Objectives and results

Description : Coverage based analysis is best described as: A. A metric used to show the logic covered during a test session providing insight to the extent of testing. B. A tool for documenting the unique ... their status through to resolution. D. The most traditional means for analyzing a system or a program

Last Answer : A. A metric used to show the logic covered during a test session providing insight to the extent of testing.

Description : Test Plan A. Road map for testing B. Tells about the actual results and expected results C. Both A and B D. None of the above

Last Answer : A. Road map for testing

Description : Item transmittal report is also known as A. Incident report B. Release note C. Review report D. Audit report

Last Answer : B. Release note

Description : The Provision and Management of a controlled library containing all the configurations items is called as a) Configuration Control b) Status Accounting c) Configuration Identification d) Configuration Identification

Last Answer : The provision and management of a controlled library containing all the configuration items is called Configuration Management. Configuration Management is the process of identifying, organizing, and ... Verification and Audit (ensuring that the configuration items are complete and accurate).

Description : Testing of software used to convert data from existing systems for use in replacement systems A. Data driven testing B. Migration testing C. Configuration testing D. Back to back testing

Last Answer : B. Migration testing

Description : Which of the following software change management activities is most vital to assessing the impact of proposed software modifications? A. Baseline identification B. Configuration auditing C. Change control D. Version control

Last Answer : C. Change control

Description :  During a new project planning process to sequence activities, the project  manager, Nate, decides to use the precedence diagraming method to show the  identified activity dependencies. Which of the following logical ... -finish c. Finish-to-finish d. Start-to-start e. All of these answers

Last Answer : b. Start-to-finish

Description : A test harness is a A. A high level document describing the principles, approach and major objectives of the organization regarding testing B. A distance set of test activities collected into a manageable phase ... conduct a test D. A set of several test cases for a component or system under test

Last Answer : C. A test environment comprised of stubs and drives needed to conduct a test

Description : Minimum Test Required for Statement Coverage :- Disc = 0 Order-qty = 0 Read Order-qty If Order-qty >=20 then Disc = 0.05 If Order-qty >=100 then Disc =0.1 End if End if a) Statement coverage is 4 b) Statement coverage is 1

Last Answer : b) Statement coverage is 1

Description : Acceptance tests are normally conducted by the A. Developer B. End usersC. Test team D. Systems engineers

Last Answer : B. End users

Description : Acceptance testing means A. Testing performed on a single stand - alone module or unit of code B. Testing after changes have been made to ensure that no unwanted changes were introduced C. ... the needs of the organization and end user. D. Users test the application in the developers environment

Last Answer : C. Testing to ensure that the system meets the needs of the organization and end user.

Description : Which testing methods are used by end-users who actually test software before they use it? A. Alpha & Beta Testing B. White Box Testing C. Black Box Testing D. Trial & Error Testing

Last Answer : A. Alpha & Beta Testing

Description : Fill in the blank. During the _________ of a project, the project manager focuses on  developing the project infrastructure needed to execute the project and developing  clarity around the project charter and scope. ... one: a. completion b. start-up c. execution d. evaluation e. selection

Last Answer : b. start-up

Description : Fill in the blank. During the _________ of a project, the project manager  focuses on developing the project infrastructure needed to execute the  project and developing clarity around the project charter and scope. ... one: a. completion b. start-up c. execution d. evaluation e. selection

Last Answer : b. start-up

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model

Last Answer : B.V-Model

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and

Last Answer : B.V-Model

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Deciding how much testing is enough should take into account:- i. Level of Risk including Technical and Business product and project risk ii. Project constraints such as time and budget iii. Size of Testing Team iv. Size ... ii are true and iii, iv are false d) ii, iii, iv are true and i is false

Last Answer : c) i, ii are true and iii, iv are false

Description : Which of the following is a requirement of an effective software environment? I. Ease of use II. Capacity for incremental implementation III. Capability of evolving with the needs of a project IV. Inclusion of advanced tools A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

Last Answer : A.I, II &III

Description : Which of the following statements is true about a software verification and validation program? I. It strives to ensure that quality is built into software. II. It provides management with insights into the state ... software development activities. A. I, II&III B.II, III&IV C.I, II&IV D.I, III&IV

Last Answer : C.I, II&IV

Description : Which one of the following illustrates why effective project management is beneficial to an organization? a. It utilizes resources as and when required under direction of a project manager. b. ... d. It ensures that the chief executive is accountable for the achievement of the defined benefits.

Last Answer : a. It utilizes resources as and when required under direction of a project manager.

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : A wholesaler sells printer cartridges. The minimum order quantity is 5. There is a 20% discount for orders of 100 or more printer cartridges. You have been asked to prepare test cases using various values for the number of printer cartridges ... A. 5, 6, 20 B. 4, 5, 80C. 4, 5, 99 D. 1, 20, 100

Last Answer : C. 0, 1,10,11, 50, 51, 75, 76,100,101

Description : Assume postal rates for 'light letters' are: $0.25 up to 10 grams; $0.35 up to 50 grams; $0.45 up to 75 grams; $0.55 up to 100 grams. Which test inputs (in grams) would be selected using boundary value analysis? A. 0, 9,19, ... C. 0, 1,10,11, 50, 51, 75, 76,100,101 D. 25, 26, 35, 36, 45, 46, 55, 56

Last Answer : C. 0, 1,10,11, 50, 51, 75, 76,100,101

Description : Find the invalid equivalence class for the following test case Draw a line up to the length of 4 inches A. Line with 1 dot-width B. Curve C. Line with 4 inches D. None of the above

Last Answer : B. Curve

Description : Minimum Tests Required for Statement Coverage and Branch Coverage :- Read P Read Q If p+q > 100 thenPrint Large End if If p > 50 then Print pLarge End if a) Statement coverage is 2, Branch ... c) Statement coverage is 1 and branch coverage is 2 d) Statement Coverage is 4 and Branch coverage is 2

Last Answer : c) Statement coverage is 1 and branch coverage is 2

Description : Functional system testing is: a) testing that the system functions with other systems b) testing that the components that comprise the system function together c) testing the end to end functionality of the system as a whole d) testing the system performs functions within specified response times

Last Answer : c) testing the end to end functionality of the system as a whole