Benefits of Independent Testing
a) Independent testers are much more qualified than Developers
b) Independent testers see other and different defects and are unbiased.
c) Independent Testers cannot identify defects.
d) Independent Testers can test better than developers

1 Answer

Answer :

b) Independent testers see other and different defects and are unbiased.

Related questions

Description : : Load Testing Tools _______ A. Reduces the time spent by the testers B. Reduces the resources spent like hardware C. Are mostly used in web testing D. All of the above

Last Answer : D. All of the above

Description : Acceptance testing means A. Testing performed on a single stand - alone module or unit of code B. Testing after changes have been made to ensure that no unwanted changes were introduced C. ... the needs of the organization and end user. D. Users test the application in the developers environment

Last Answer : C. Testing to ensure that the system meets the needs of the organization and end user.

Description : Which of the following helps in monitoring the Test Progress:- i. Percentage of Test Case Execution ii. Percentage of work done in test environment preparation. iii. Defect Information e.g. defect density, ... ii,iii are correct and iv is incorrect c) i,ii are correct and iii,iv are incorrect

Last Answer : b) i,ii,iii are correct and iv is incorrect

Description : The selection of test cases for regression testing A. Requires knowledge on the bug fixes and how it affect the system B. Includes the area of frequent defects C. Includes the area which has undergone many/recent code changes D. All of the above

Last Answer : D. All of the above

Description : Coverage based analysis is best described as: A. A metric used to show the logic covered during a test session providing insight to the extent of testing. B. A tool for documenting the unique ... their status through to resolution. D. The most traditional means for analyzing a system or a program

Last Answer : A. A metric used to show the logic covered during a test session providing insight to the extent of testing.

Description : UAT is different from other testing types normally because of A. Data B. Cycles C. Defects D. None of the above

Last Answer : A. Data

Description : . One of the more daunting challenges of managing a test project is that so many dependencies converge at test execution. One missing configuration file or hard ware device can render all your test results ... incident? A. Test managers faults only B. Test lead faults only C. Test manager and proj

Last Answer : A. Test managers faults only

Description : Which of the following will be the best definition for Testing :- a) The goal / purpose of testing is to demonstrate that the program works. b) The purpose of testing is to demonstrate that the ... does what it is supposed to do. d) Testing is executing Software for the purpose of finding defects.

Last Answer : d) Testing is executing Software for the purpose of finding defects.

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : The purpose of software testing is to A. Demonstrate that the application works properly B. Detect the defects C. Validate the logical design

Last Answer : A. Demonstrate that the application works properly

Description : Which of the following is a myth in testing? a) Tester can find bugs b) Any user can test software c) Missed defects are not due to testers d) Complete testing is not possible

Last Answer : Ans : b

Description : In preparation for developing the acceptance criteria, the user should A. Know the defects in the application B. Acquire the basic knowledge of the application for which the system is ... D. Know new enhancement and basic understanding of how the application is implemented in users organization

Last Answer : Understand the risks and benefits of the development methodology that is to be used in correcting the software system

Description : Defect Density' calculated in terms of A. The number of defects identified in a component or system divided by the size of the component or the system B. The number of defects found by a test phase ... The number of defects found by a test phase divided by the number found by the size of the system

Last Answer : A. The number of defects identified in a component or system divided by the size of the component or the system

Description : _________ test is conducted at the developer’s site by a customer. A. Beta B. System C. Alpha D. None of the above

Last Answer : C. Alpha

Description : Which of the following is the task of a Test Lead / Leader: i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project. ii. Write Test Summary Reports based on the ... is true and ii,iii,iv are false d) iii and iv is correct and i and ii are incorrect

Last Answer : a) i, ii, iii is true and iv is false

Description : Exit Criteria may consist of :- i. Thoroughness measures , such as coverage of code, functionality or risk ii. Estimates of Defect density or reliability measures. iii. Residual risk such as defects not fixed or ... correct and i,ii,iii are incorrect d) iii and iv are correct and i,ii are incorrect

Last Answer : b) i,ii,iii is correct and iv is incorrect

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : Defects discovered by static analysis tools include: i. Variables that are never used. ii. Security vulnerabilities. iii. Programming Standard Violations iv. Uncalled functions and procedures a) i , ii,iii,iv is correct b ... ,iv are incorrect. c) i ,ii, iii and iv are incorrect d) iv, ii is correct

Last Answer : a) i , ii,iii,iv is correct

Description : Success Factors for a review include: i. Each Review does not have a predefined objective ii. Defects found are welcomed and expressed objectively iii. Management supports a good review process. iv. There is an emphasis on ... and ii is incorrect c) i , iii , iv , ii is in correct d) ii is correct

Last Answer : a) ii,iii,iv are correct and i is incorrect

Description : The Kick Off phase of a formal review includes the following :- a) Explaining the objective b) Fixing defects found typically done by author c) Follow up d) Individual Meeting preparations

Last Answer : a) Explaining the objective

Description : ‘Be bugging’ is known as A. Preventing the defects by inspection B. Fixing the defects by debugging C. Adding known defects by seeding D. A process of fixing the defects by tester

Last Answer : C. Adding known defects by seeding

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements

Description : In case of Large Systems :- a) Only few tests should be run b) Testing should be on the basis of Risk c) Only Good Test Cases should be executed. d) Test Cases written by good test engineers should be executed.

Last Answer : b) Testing should be on the basis of Risk

Description : Test charters are used in ________ testingA. Exploratory testing B. Usability testing C. Component testing D. Maintainability testing

Last Answer : A. Exploratory testing

Description : System test can begin when? I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting II. The development team provides software to the test team 3 business days prior ... . I and II only B. II and III only C. I and III only D. I, II and III

Last Answer : D. I, II and III

Description : A test harness is a A. A high level document describing the principles, approach and major objectives of the organization regarding testing B. A distance set of test activities collected into a manageable phase ... conduct a test D. A set of several test cases for a component or system under test

Last Answer : C. A test environment comprised of stubs and drives needed to conduct a test

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : During the testing of a module tester X' finds a bug and assigned it to developer. But developer rejects the same, saying that it's not a bug. What X' should do? A. Report ... same bug to another developer D. Send to the detailed information of the bug encountered and check the reproducibility

Last Answer : D. Send to the detailed information of the bug encountered and check the reproducibility

Description : A test manager wants to use the resources available for the automated testing of a web application. The best choice is A. Test automater, web specialist, DBA, test lead B. Tester, test automater, web ... C. Tester, test lead, test automater, DBA D. Tester, web specialist, test lead, test automater

Last Answer : B. Tester, test automater, web specialist, DBA

Description : The testing attempts to violate those procedures, which should test the adequacy of the security procedures. A. Disaster testing B. Functional testing C. Regression testing D. Compliance testing

Last Answer : D. Compliance testing

Description : Which testing methods are used by end-users who actually test software before they use it? A. Alpha & Beta Testing B. White Box Testing C. Black Box Testing D. Trial & Error Testing

Last Answer : A. Alpha & Beta Testing

Description : The following defines the statement of what the tester is expected to accomplish or validate during testing activity A. Test scope B. Test objective C. Test environment D. None of the above

Last Answer : B. Test objective

Description : A test plan defines A. What is selected for testing B. Objectives and results C. Expected results D. Targets and misses

Last Answer : B. Objectives and results

Description : Test Plan A. Road map for testing B. Tells about the actual results and expected results C. Both A and B D. None of the above

Last Answer : A. Road map for testing

Description : Testing Process comprised of A. Test Plan and Test Cases B. Test log and Test Status C. Defect Tracking D. All of the above

Last Answer : D. All of the above

Description : Decision to stop testing should be based upon A. Successful use of specific test case design methodologies B. A percentage of coverage for each coverage category C. Rate of error detection falls below a specified threshold D. All of the above

Last Answer : D. All of the above

Description : _________must be developed to describe when and how testing will occur. A. Test Strategy B. Test Plan C. Test Design D. High Level document

Last Answer : B. Test Plan

Description : Alpha testing is differentiated from Beta testing by A. The location where the tests are conducted. B. The types of test conducted C. The people doing the testing D. The degree to which white box techniques are used

Last Answer : A. The location where the tests are conducted.

Description : Which of the following is not a type of test under phases in testing life cycle? A. Integration test B. Load test C. User Acceptance test D. Beta test

Last Answer : D. Beta test

Description : Test summary report A. Functional testing is mostly B. Validation techniques C. Verification techniques D. Both of the above E. None of the above

Last Answer : B. Validation techniques

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model

Last Answer : B.V-Model

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing after component testing, and

Last Answer : B.V-Model

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : Characteristic of a good test A. Reasonable probability of catching an error and can be redundant B. It is not simple or too complex C. Reasonable probability of catching an error and cannot be redundant D. It is either simple or too complex

Last Answer : C. Reasonable probability of catching an error and cannot be redundant

Description : For ultrasonic testing, which of the following statements is true? a) It is easy to identify all defects b) The equipment shall be calibrated before use c) The equipment cannot be automated d) Sound waves will not travel through copper

Last Answer : b) The equipment shall be calibrated before use

Description : They normally interact with the system via user interface provided by the application software. a) Programmers b) Developers c) Users d) Testers

Last Answer : Answer: c Explanation: Users interact with the system via user interface that is given by the application software. An application software is a set of instructions designed to serve a particular purpose This set of Computer Fundamentals online test focuses on “Machine Languages”

Description : Functional system testing is: a) testing that the system functions with other systems b) testing that the components that comprise the system function together c) testing the end to end functionality of the system as a whole d) testing the system performs functions within specified response times

Last Answer : c) testing the end to end functionality of the system as a whole