Pick up the incorrect statement from the following:
(A) The width of the wall is constructed thicker at the base in a stepped fashion
(B) A long vertical load transferring concrete structure is called a concrete pile
(C) In pile which transfers the load to the soil by the friction between the pile and the
surrounding soil is called friction pile
(D) The pile which transfers the load to a hard rock bed at certain depth is called load bearing
(A) The width of the wall is constructed thicker at the base in a stepped fashion
(B) A long vertical load transferring concrete structure is called a concrete pile
(C) In pile which transfers the load to the soil by the friction between the pile and the
surrounding soil is called friction pile
(D) The pile which transfers the load to a hard rock bed at certain depth is called load bearing