PERT technique of network analysis is mainly useful for
(A) Small projects
(B) Large and complex projects
(C) Research and development projects
(D) Deterministic activities

1 Answer

Answer :

(C) Research and development projects

Related questions

Description : PERT is (A) An analytic in concept (B) Limited of event oriented diagrams (C) Used for research and development projects (D) All the above

Last Answer : (D) All the above

Description : The first method invented for planning projects, was (A) Bar chart method (B) Milestone chart (C) Critical path method (CPM) (D) Programme Evaluation and Review Technique (PERT)

Last Answer : (A) Bar chart method

Description : Consider the following features/factors: 1. Projects are of the non-repetitive type 2. Time required need not be known 3. Time required is known precisely 4. Events have been established for planning 5. Emphasis is given to ... and 4 (B) 3, 4 and 5 (C) 1, 3 and 4 (D) 1, 2 and 5

Last Answer : (A) 1, 2 and 4

Description : For a project manager to have an effective means of identifying and communicating the planned activities and their interrelationships, he must use a network technique. One of the network ... evaluation review technique c. Path evaluation review technique d. Project execution review technique

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by employing three time estimates per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by using only one time factor per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : In PERT analysis, the time estimates of activities and probability of their occurrence follow (A) Normal distribution curve (B) Poisson's distribution curve (C) Beta distribution curve (D) None of the above

Last Answer : (C) Beta distribution curve

Description : Which of the following statements is true? A. PERT is considered as a deterministic approach and CPM is a probabilis t ic techniques. B. PERT is considered as a probabilistic techniques ... and CPM are both probabilistic techniques. D. PERT and CPM are both considered as deterministic approachs

Last Answer : B. PERT is considered as a probabilistic techniques and CPM is considered as a deterministic approach

Description : PERT (Project Evaluation and Review Technique) analysis is based on  A. Optimistic time, Pessimistic time and Most likely time  B.Pessimistic time, Optional time, Maximum time  C.Optimistic time, Efficient time, Most likely time  D.Minimax time, Optimistic time and harmonic time

Last Answer : A. Optimistic time, Pessimistic time and Most likely time

Description : PERT stand for: a. Performance Evaluation Review Technique b. Programme Evaluation Review Technique c. Programme Evaluation Research Technique

Last Answer : b. Programme Evaluation Review Technique

Description : In a PERT network, slack time is _____. (a) The end point that represents the completion of a major activity (b) The time or resources required to progress from one event to another ( ... without delaying the whole Project (d) The longest or most time-consuming sequence of events and activities 

Last Answer : (c) The amount of time an individual activity can be delayed without delaying the whole Project 

Description : The probability distribution taken to represent the completion of time in PERT analysis is (a) Normal Distribution (b) Bet Distribution (c) Gamma Distribution (d) Gaussain Distribution

Last Answer : (a) Normal Distribution

Description : When a business has a relatively small number of customers, a useful method of forecasting is: A)time series analysis B)the delphi technique C)trend analysis D)a customer forecasting survey

Last Answer : D)a customer forecasting survey

Description : The Prototyping model of software development is: (1) a reasonable approach when requirements are well-defined. (2) a useful approach when a customer cannot define requirements clearly. (3) the ... projects with large development teams. (4) a risky model that rarely produces a meaningful product.

Last Answer : 1

Description : The statistical tool that depicts a project’s tasks and the relationships between those tasks is  known as (A) milestone (B) goal (C) Gantt chart (D) PERT chart

Last Answer : (D) PERT chart

Description : What is the most accurate method of obtaining project information that can reduce the amount  of risk? 1. Observations on the current project  2. Determining the risk by using brainstorming ... from previous projects that were similar in nature  4. Sensitivity analysis  5. Delphi technique.

Last Answer : 3. The use of historical data from previous projects that were similar in nature

Description : Once the project is approved and moves into the planning stage, what  happens in the next phase of the project life cycle? Select one: a. Agreements for risk sharing need to be concluded. ... activities. e. A risk response plan can be used to identify increasing levels of detailed risk analysis

Last Answer : d. Risks are identified with each major group of activities.

Description : …… is a tool to estimate the cost or necessary efforts for projects, work packages or activities in project management. 1. Cost budgeting 2. cost control 3. Cost analysis 4. Resource Planning

Last Answer : Cost budgeting

Description : Which one of the following is the most appropriate management control technique for timely completion of a project ? (A) Organisation chart (B) Management by Objectives (C) PERT (D) Span of control

Last Answer : Answer: PERT

Description : In PERT (Project Evaluation and Review Technique) method Expected time (Te) is  A. (To+Tp+4Tm)/6  B. (To+Tp+2Tm)/6  C. (To+Tp+Tm)/6  D. (Tm+Tp+4To)/6

Last Answer : A. (To+Tp+4Tm)/6

Description : . The PERT in project management means program evaluation and _____ technique. (A) resource (B) reconciliation (C) reconsideration (D) review

Last Answer : (D) review

Description : _________ technique helps to make a choice from numerous available alternatives a. PERT b. CPM c. Linear Programming d. Transportation

Last Answer : d. Transportation

Description : In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having (A) Longest duration (B) Highest cost slope (C) Least cost slope (D) Shortest duration

Last Answer : (C) Least cost slope

Description : The basic difference between PERT and CPM is that a. PERT deals with events and CPM with activities b. Critical Path is determined in PERT only c. Costs are considered on CPM only d. Guessed times are used in PERT and evaluated times in CPM.

Last Answer : a. PERT deals with events and CPM with activities

Description : 25. Operations Research models in which some or all values of variables are random in nature are called _____ a. Physical b. Symbolic c. Deterministic d. Probabilistic

Last Answer : d. Probabilistic

Description : Operations Research models in which values of all variables and all possible outcomes are known with certainty are called _____ a. Physical b. Symbolic c. Deterministic d. Probabilistic

Last Answer : c. Deterministic

Description : PERT stands for __________. A. Programme Evaluation and Research Techniques. B. Project Evaluation and Review Techniques. C. Programme Evaluation and Review Techniques. D. Project Evaluation and Research Techniques.

Last Answer : C. Programme Evaluation and Review Techniques.

Description : In the final analysis, teaching must be thought of mainly as a process of (a) Asking questions and evaluating the learning (b) Directing the activities of the pupils (c) Hearing the recitation of pupils (d) all of the above

Last Answer : (a) Asking questions and evaluating the learning

Description : In the final analysis, teaching must be thought of mainly as a process of Options: A) Directing the activities of people B) Asking questions and appraising answers C) Hearing the recitation of pupils D) Indoctrinating pupils with adult ideas

Last Answer : A) Directing the activities of people 

Description : What is a visual representation of a project’s planned activities against a calendar called? a. A Gantt chart. b. A critical path network. c. A product flow diagram. d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : What is a visual representation of a project’s planned activities against a calendar called?  a. A Gantt chart.  b. A critical path network.  c. A product flow diagram.  d. A Pareto chart.

Last Answer : a. A Gantt chart.

Description : Research ethics has a direct connection more often with which stages of research ? (A) Defining and delimiting the scope of research. (B) Problem formulation and reporting of research ... deciding the sampling technique for research. (D) Deciding about statistical techniques and data analysis.

Last Answer : (B) Problem formulation and reporting of research findings. 

Description : Pick up the correct statement from the following: (A) Indian space effort started in 1962 with the establishment of a rocket (B) Development of space (DOS) was established by the Government of ... is responsible for the space technology and its application to various activities (D) All of these

Last Answer : Answer: Option D

Description : A ____ is a namespace for organizing classes and interfaces in a logical manner. Placing your code into ______makes large software projects easier to manage. This section explains why this is useful and ... provided by the Java Platform: a) Inheritance b) Object c) Package d) None of These

Last Answer : c) Package

Description : Waterfall model is not suitable for ? Small Projects Complex Projects Accommodating change None of Above

Last Answer : Accommodating change

Description : Quantitative data refers to (i) Graphs and tables (ii) Any data you present in your report (iii) Statistical analysis (iv) Numerical data that could be useful to answer your research question(s) and to meet your Objectives

Last Answer : (iv) Numerical data that could be useful to answer your research question(s) and to meet your Objectives

Description : dummy activity is used in PERT network to describe the (A) Precedence relationship (B) Resource idleness (C) Resource restriction (D) Necessary time delay

Last Answer : Option A

Description : In a PERT network, the earliest(activity) start time is the a. Earliest time that an activity can be finished without delaying the entire project b. Latest time that an activity can ... of precedence requirements d. Latest time that an activity can be finished without delaying the entire project

Last Answer : c. Earliest time that an activity can be started without violation of precedence requirements

Description : What is the benefit of using PERT/CPM network as integral component of project management? a. They furnish a consistent framework for planning, scheduling, monitoring and controlling project b. They illustrate ... that the project will be completed by a specific date d. All of the above

Last Answer : d. All of the above

Description : ................... is an event oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : b. PERT

Description : ......................... is activity oriented network diagram. a. CPM b. PERT c. Histogram d. Ogive

Last Answer : a. CPM

Description : ____________ is a graphical representation of the various activity and event relating to a project. A. Network analysis. B. Scheduling technique. C. Logical Model. D. Network Diagram

Last Answer : D. Network Diagram

Description : Research scientists all over the world are taking steps towards building computers with circuits patterned after the complex interconnections existing among the human brain's nerve cells. What name ... ? a) Intelligent computers b) Supercomputers c) Neural network computers d) Smart computers

Last Answer : c) Neural network computers

Description : Which of the following is not a PERT event? (A) Site investigation started (B) Sessional work completed (C) Bus starts from Jaipur (D) Class is being attended

Last Answer : (D) Class is being attended

Description : Pick up the PERT event from the following: (A) Digging of foundation started (B) Digging of foundation completed (C) Laying of concrete started (D) All the above

Last Answer : (D) All the above

Description : Which of the following statements about continuous cardiac output monitoring are true? A. Continuous cardiac output monitoring may unmask events not detected by intermittent cardiac output measurements. ... stroke volume by detecting changes in resistance to a small, applied alternating current.

Last Answer : Answer: AD DISCUSSION: Various techniques are available to measure cardiac output continuously. The advantages of continuous cardiac output monitoring, as compared with intermittent methods, are (1) ... function of the stroke volume, which then can be used to calculate the cardiac output

Description : In 1977, this American female scientist shared the Nobel Prize in medicine for her work in the development of radioimmunoassays of peptide hormones. In awarding the prize, the Nobel Committee described ... about a revolution in biolocial and medical research". Who is this eminent woman scientist? 

Last Answer : ANSWER: (ROSALYN) YALOW