Why cannot we have cables instead of bus duct in main generator? 

1 Answer

Answer :

Very large number of cables in parallel required problems of sealing the terminations. 

Related questions

Description : Where fault level is more, whether in generator bus duct or UT bus duct? Why?

Last Answer : Fault level is more in UT bus duct. Because the fault currents fed by the both generator and GT adds up within UT bus duct in case there is a fault in UT bus duct. 

Description : Which is better, whether a) Phase segregated bus duct or b) Common bus duct?

Last Answer : Phase segregated bus duct is better, since phase to phase faults are avoided.  

Description : Why aluminium bus duct is used?

Last Answer : Aluminium is nonmagnetic material. Short circuit forces are less. 

Description : How moisture entry is prevented into bus duct?  

Last Answer : Silicagel breathers at either end. 

Description : Why oil cannot be used instead of water in generator stator?

Last Answer : Oil has high thermal capacity than gas, but low thermal capacity than water. Ability to absorb heat is also less than waters. High viscosity of oil causes linear flow and poor surface heat transfer in small ducts. Large pumping power required. 

Description : Upon failure of the normal power supply, the emergency generator is placed on the line by the _____________. A. main bus tie feeder B. automatic bus transfer device C. line connection feeder D. power failure alarm bus

Last Answer : Answer: B

Description : Regarding an AC generator connected to the main electrical bus; as the electric load and power factor vary, a corresponding change is reflected in the generator armature reaction. These changes in ... . governor speed droop setting B. voltage regulator C. balance coil D. phase-balance relay

Last Answer : Answer: B

Description : In the schematic diagram of the DC compound generator shown in the illustration, the positive ammeter reading is 500 amps and the negative ammeter reading is 475 amps. What is the current flow through the neutral bus? EL-0037 A. 0 amp B. 12.5 amp C. 25 amp D. 975 amp

Last Answer : Answer: C

Description : Upon failure of the normal power supply, the emergency generator is placed on the line by the _____________. A. bus tie feeder B. automatic bus transfer device C. line connection feeder D. power failure alarm bus

Last Answer : Answer: B

Description : An AC generator operating in parallel loses its excitation without tripping the circuit breaker. This will __________. A. not affect the faulty generator due to the compensation of the other generators B. ... between the armature and the bus D. cause high currents to be induced in the field windings

Last Answer : Answer: D

Description : Voltage failure of an AC generator may be caused by ____________. A. failure of the exciter generator B. a tripped bus circuit breaker C. high mica segments on the stator bus bar D. excessive prime mover speed

Last Answer : Answer: A

Description : As shown in the illustration, the function of the switch labeled 'PFSW' is to determine the ______________. EL-0003 A. bus frequency B. reactive volt amperes of the bus C. frequency of either generator D. power factor of either generator

Last Answer : Answer: D

Description : In order to safely carry out repairs to a generator circuit breaker, it must be isolated from the bus. This is accomplished by opening the _____________. A. reverse power relay B. bus disconnect link C. generator bus fuse connections D. power directional relay

Last Answer : Answer: B

Description : Attempting to parallel an AC generator which is out of phase with the bus will result in which of the following problems? A. The breaker should trip. B. The KVA will decrease. C. The synchronizing lamps will burn out. D. The power factor will be unitized.

Last Answer : Answer: A

Description : Two paralleled alternators are operating near rated load. If one trips out mechanically, which of the listed actions should be taken FIRST? A. Restart the tripped machine immediately. B. Strip the board ... circuits. C. Start the emergency generator. D. Transfer all vital loads to the emergency bus.

Last Answer : Answer: B

Description : When paralleling two AC generators, the frequency of the machine coming online, immediately prior to closing its breaker, should be ____________. A. slightly less than the oncoming generator frequency B. the ... bus frequency C. slightly greater than the bus frequency D. the same as the bus voltage

Last Answer : Answer: C

Description : When paralleling two AC generators, the synchroscope selector switch and frequency meter switch should be set up to sense the frequency of the _____________. A. bus B. generator on the line C. oncoming generator D. bus transfer relay

Last Answer : Answer: C

Description : When paralleling two alternators using three synchronizing lamps, the flickering of all three lamps becomes progressively slower and slower. This means the ______________. A. frequency of the incoming ... the bus D. terminal voltage of the incoming alternator is approaching that of the bus

Last Answer : Answer: A

Description : Which of the listed sections of an emergency switchboard is used to supply power for alarm signals under emergency conditions? A. The generator and bus transfer section B. The 450 volt, 60 cycle, 3 phase bus C. The 120 volt, 3 phase, 60 cycle bus D. The 24 volt DC bus

Last Answer : Answer: D

Description : A bus disconnect link is used to isolate _____________. A. one bus bar from another B. the generator circuit breaker from the bus C. different phases from the equalizer connection D. positive and negative buses from the neutral

Last Answer : Answer: B

Description : Prior to starting an AC generator prime mover, the voltage regulator cutout switch should be placed in the __________. A. manual position B. bus neutral position C. raise voltage position D. transfer position

Last Answer : Answer: A

Description : What will be the reactive power and bus voltage whan the generator bus is treated as load bus.

Last Answer : When the generator bus is treated as load bus, the reactive power of the bus is equated to the limit it has violated, and the previous iteration value of bus voltage is used for calculating current iteration value.

Description : When the generator buses are treated as load bus.

Last Answer : If the reactive power constraints of a generator bus violates the specified limits then the generator is treated as load bus.

Description : Define voltage controlled bus(generator bus/PV bus).

Last Answer : A bus is called voltage controlled bus if the magnitude of voltage |V| and real power (P) are specified for it. In a voltage controlled bus, the magnitude of the voltage is not allowed to change. Voltage controlled bus is also called as Generator bus and PV bus.

Description : Can you use duct tape instead of blackhead strips?

Last Answer : You’ll probably just end up with a sticky nose.

Description : While starting a main propulsion synchronous motor, the ammeter pegs out at maximum and then returns to the proper value after synchronization. This indicates the _____________. A. motor has started ... field windings are grounded C. slip rings are dirty D. power transmission cables are grounded

Last Answer : Answer: A

Description : In a topology, if there are n devices in a network, each device has n-1 ports for cables. A) Mesh B) Star C) Bus D) Ring

Last Answer : A) Mesh

Description : In a ................topology, if there are n devices in a network, each device has n-1 ports for cables. A) Mesh B) Star C) Bus D) Ring

Last Answer : A) Mesh

Description : In a................ topology, if there are n devices in a network, each device has n-1 ports for cables. A) Mesh B) Star C) Bus D) Ring

Last Answer : Mesh

Description : Can I get the KVM Cables Keyboard Mouse Video 3in1 Cables Switch in a 4 pack instead of a 2?

Last Answer : Unfortunately, KVM switches come for four comuters or more only. However, you only need to hook up two comuters and leave the other two unused.

Description : Why is aluminium used instead of copper for overhead cables?

Last Answer : Because copper reacts with atmosphere variation and it's cost High as compared to aluminium and aluminium is good property and less cost so aluminium is used

Description : The timer element of a reverse power relay cannot be energized unless _____________. A. the power flow is the same as the tripping direction B. the power flow is the opposite to the tripping direction C. the movement of the disk is damped by a permanent magnet D. one generator is motorized

Last Answer : Answer: A

Description : The timer element of a reverse power relay cannot be energized unless _____________. A. one generator is fully motorized B. the movement of the disk is damped by a permanent magnet C. the power flow is the same as the tripping direction D. the power flow is the opposite to the tripping direction

Last Answer : Answer: C

Description : Which of the listed safety features should be provided in small rooms or lockers where batteries are stored? A. Installation of a fixed CO2 system. B. An exhaust duct is to be provided and led from within ... An exhaust duct is to be provided and led from the top of the locker to the open air.

Last Answer : Answer: D

Description : Which of the following is/are true concerning electric power operated watertight door systems? A. Each motor driven door must use the main bus as its source of power. B. Each distribution panel for ... to permit quick activation of the system. D. Each system must have a separate branch circuit.

Last Answer : Answer: D

Description : The purpose of the automatic bus transfer shown in the illustration is to ___________. EL-0014 A. stepdown voltage to the lighting distribution panel B. provide emergency power to ... emergency switchboard from the main switchboard D. provide overcurrent protection to the lighting distribution panel

Last Answer : Answer: B

Description : To remove an alternator operating in parallel with another unit from the main electrical bus, you must FIRST _________. A. adjust the power factor on both units B. set the desired voltage on ... C. open the circuit breaker on the outgoing alternator D. remove the load from the outgoing alternator

Last Answer : Answer: D

Description : Multiple grounds have developed and were initialy indicated by the grounddetecting system as one ground. The FIRST step in locating the grounds is to _____________. A. examine the main bus bars ... no longer indicates any grounds C. change over generators D. check each circuit with a megohmmeter

Last Answer : Answer: B

Description : The operating torque of the upper induction disc-type element, or timer element, of an AC reverse power relay is obtained from ____________. A. the main bus B. a separate battery source C. line voltage D. electromagnets

Last Answer : Answer: D

Description : The heaters for the winch circuit shown in the illustration are powered from _____________. EL-0102 A. a separate source B. the winch main bus C. the master switch power circuit D. the contactor control circuit

Last Answer : Answer: A

Description : The timer element found in a reverse power relay obtains its operating torque via _____________. A. line voltage B. the main bus C. electromagnets D. a separate battery source

Last Answer : Answer: C

Description : The purpose of a short circuit forcing module (short time trip) installed in a branch line is to provide ____________. A. high speed clearance of low impedance short circuits in the branch B. ... C. isolation of short circuits by selective tripping of branch circuit breakers D. all of the above

Last Answer : Answer: D

Description : The shipboard general alarm system must receive its main source of power from _____________. A. a storage battery B. the emergency generator C. an auxiliary generator D. the ship's service generator

Last Answer : Answer: A

Description : The source of emergency lighting and power at loss of normal ship's power on a cargo vessel should be obtained from the ______________. A. emergency generator supply to the emergency ... switchboard C. battery supply to the main switchboard D. turbogenerator supply to the emergency switchboard

Last Answer : Answer: A

Description : The main purpose of an electric space heater installed in a large AC generator is to _____________. A. keep the lube oil warm for quick starting B. prevent moisture from condensing in the ... is shutdown C. prevent the windings from becoming brittle D. prevent acidic pitting of the slip rings

Last Answer : Answer: B

Description : In preparing to take insulation resistance readings on a main generator, the windings should be grounded for about 15 minutes prior to the test to _____________. A. allow accurate zeroing of the meter ... the windings D. help the windings to cool to the same temperature as the ground test connection

Last Answer : Answer: C

Description : The prime mover of an AC two pole main propulsion generator drives the generator at 3600 RPM. If the main propulsion motor has 80 poles, what will be the propeller speed? A. 45 RPM B. 80 RPM C. 90 RPM D. 180 RPM

Last Answer : Answer: C