Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test, because the ___________. A. static charge of the machine may give a false reading B. armature will have a greater number of leakage paths C. insulation may be damaged D. insulation may be covered with moisture