Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test as the ______________. A. insulation may be damaged B. insulation may be covered with moisture C. armature windings will have a greater number of leakage paths D. larger machines may acquire a charge of static electricity during operation