If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then find the time it takes for 2 men and 3 women to finish th

1 Answer

Answer :

If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then ... takes for 2 men and 3 women to finish the same work.

Related questions

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : 6 men and 10 women can finish making pots in 8 days, while the 4 men and 6 women can finish it in 12 days. Find the time taken by the one man alone from that of one woman alone to finish the work. -Maths 9th

Last Answer : Given: 6 men and 10 women can finish making pots in 8 days 4 men and 6 women can finish it in 12 days To find: Time taken by the one man alone from that of one woman alone to finish the work ... = 48Then time taken by the one man alone from that of one woman alone to finish the work is 48 days

Description : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also finish it in 2 days. Now find the time taken by one woman to compl

Last Answer : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also ... time one man takes to complete the same job working alone.

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : A certain number of men can do a job in 10 days, working 6 hours a day. If the number of men is decreased by `(1)/(3)rd`, then in how many days can th

Last Answer : A certain number of men can do a job in 10 days, working 6 hours a day. If the number of ... remaining men complete the work, working 9 hours per day?

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : A this usual rowing rate, Mohit can travel 12 miles downstream in a certain river in 6 hours less than it takes him to travel the same distance upstream. But if he could double his usual rowing rate for his 24 miles round trip, ... current in miles per hour? A.2.5m/hr B.4 m/hr C.8/3 m/hr D. 5/3m/hr

Last Answer : Answer-C Basic Formula: Speed of the stream = ½ (a-b) km/hr Explanation: Let the speed in still water be x m/hr Speed of stream be y m/hr Then, speed upstream = x-y m/hr and Speed downstream = x+y m/hr 12/x-y - ... 1] 3y^2 = 8 y so, y = 8/3 speed of the current = 8/3 m/hr = 2 (2/3) m/hr

Description : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Last Answer : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Description :  Arfath is thrice as good workman as deekshith and together they finish a piece of work in 27 days. In how many days will arfath alone finish the work? a) 9 days b) 10 days c) 11 days d)12 days

Last Answer : A Arfath’s 1 days work = 3 Deekshith 1 day’s work = 1 Arfath 1 day’s work : Deekshith 1 days work = 3:1 (Arfath + deekshith )’s 1 day’s work = 1/27 Divide 1/27 in the ratio 3:1 Arfath’s 1 days work = 1/27 *3/1 = 3/27 =1/9 Hence Arfath’s alone can finish the work in 9 days

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : M do a piece of work in 45 days and N can finish it in 40 days. They work together for 5 days and then M leaves. In how many days will N finish the remaining work? a) 30 5/9 b) 29 4/9 c) 31 3/5 d) 29 5/9

Last Answer : A Time taken by M to finish the work = 45 days. M's 1 day's work = 1/45 Time taken by N to finish the work = 40 days. N's 1 day's work = 1/40 (M + N)'s 1 day's work = (1/40+1/45) = ... be done by N in (55/72*40) days = 30and 5/9 days. Hence, the remaining work is done by B in 30 and 5/9 days.

Description : There are 20 pieces of bread to divide among 20 people. A man eats 3 pieces, woman eats 2 pieces and a child eats half piece of bread. Tell the correct combination of men, women and children so that ... the bread. You have to tell there are how may are men, women and children in those 20 people.

Last Answer : There are 5 women, 1 man and 14 children.

Description : There are 20 pieces of bread to divide among 20 people. A man eats 3 pieces, woman eats 2 pieces and a child eats half piece of bread. Tell the correct combination of men, women and children so that ... the bread. You have to tell there are how may are men, women and children in those 20 people.

Last Answer : There are 5 women, 1 man and 14 children.

Description :  P and Q undertake to do a piece of job for Rs.1200. P alone can do it in 12 days while Q alone can do it in 16 days. With the help of R , they finish it in 6 days. Find the share of P,Q & R. a) 400,600,200 b) 200,400,600 c) 450,400,250 d) 600,450,150

Last Answer : D R;s 1 day work = 1/6 – (1/12 + 1/16) =1/6 – 1/12 – 1/16 = (8-4-3)/48 = 1/48 P:Q:R = ratio of 1 day work = 1/12:1/16 : 1/48 =4:3:1 P’s share = Rs(1200*4/8) =Rs.600 Q’s share = Rs(1200 * 3/8) =Rs.450 R’s share = Rs(1200 * 1/8) =Rs.150

Description : A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

Last Answer : A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : Men. Do you feel resentful that women expect you to put the seat down after you finish in the toilet?

Last Answer : My husband put the seat down before we even met. In fact, he is the one who got me in the habit of putting the lid down with the seat.

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : A contract is to be completed in 46 days and 117 men were set to work, each working 8 hours a day. After 33 days, 4/7 of the work completed. How many additional men may be employed so that the work may be completed in time, each man now working 9 hours a day? a) 79 b) 80 c) 81 d) 82 e) 83

Last Answer : work finished by 33 days = 33 117 8 = 30888 man hours 4/7th of the job is finished. remaining work = 1-(4/7) = 3/7 if 4/7th of the work is 30888 hours, then 3/7th of the work = [30888 ... 9 number of men = 198 since, 117 men are already working, additional men required = 198 - 117 = 81 Answer: c)

Description : Rishwi can finish a work in 6 days working 4 hours a day. Dhiviksha can complete the same work in 4 days working 5 hrs a day. If both rishwi and dhiviksha work together, working 4 hrs a day, in how many days can they finished the work? a) 30/11 b) 11/120 c) 11/30 d) 30/13

Last Answer : A Rishwi can complete the work in (6*4) = 24 hrs Dhiviksha can complete the work in (4*5) = 20 hrs Rishwi's 1 hr work = 1/24 Dhiviksh's 1 hr work = 1/20(Rishwi and dhivikasha)'s 1 hr work = (1/24 ... fininsh the work in (120/11)hrs Number of days of 4 hrs each = 120/11*1/4 =120/44 =30/11 days

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description : i have a question.i had cosmetology in high school many many years ago.bt didnt finish my hours, then i went back to school to try to finish the little bit of hours i had left to go, bt didnt get the chance to. what i want to know is do i still have my hr?

Last Answer : Unfourtunatly, probably not. It will be very hard to find someone who will accept your transcript from so long ago. You may just have to go to school all over again.

Description : Two faucet A and B can fill a tank in 20 hours and 40 hours respectively. If they are opened simultaneously. Sometimes later, tap B was closed, then it takes total 14 hours to fill up the whole tank. After how many hours B was closed? A) 4 hours B) 15.2 hours C) 12 hours D) 17.6 hours

Last Answer :  A Let x is the time when B is closed X(1/20+1/40)+14/20=1 X=4 hours

Description : A certain number of men can do a work in 15 days working 8 hours a days.If the number of men is decreased `(1)/(3)`, then in how many days can twice t

Last Answer : A certain number of men can do a work in 15 days working 8 hours a days.If the number of ... completed by the remaining men working 5 hours per day?

Description : Anyone created a faux metal finish on a piece of furniture?

Last Answer : I think it could be done. Are you looking for a pure' silver/pewter or an antiqued look? Metallic paint almost never looks like the real thing, so I'd suggest antiquing over the paint. You ... could also leave the tables black, but use silver paint to accent the edges or any details or paneling.

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Woman of , do you tend to notice what a men wears? Which piece of clothing do you notice de most? An stylish guy is that appreciated by women?

Last Answer : A guy always looks sharp if his clothes fit well. Honestly, a well fitted pair of jeans make a butt look amazing. Just a touch of bulge showing, too- and I’m done oof!

Description : Woman of , do you tend to notice what a men wears? Which piece of clothing do you notice de most? An stylish guy is that appreciated by women?

Last Answer : A guy always looks sharp if his clothes fit well. Honestly, a well fitted pair of jeans make a butt look amazing. Just a touch of bulge showing, too- and I’m done oof!

Description : The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

Last Answer : The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

Description : A boat takes 24 hours to cover 128 km downstream and 16 hours to cover 64 km upstream. Then the speed of the boat in still water is: A) 14/3 B) 8/7 C) 3/2 D) 9/5

Last Answer : Answer: A Explanation: Distance covered in downstream = 128km Time taken in downstream = 24 hours. Rate of downstream = distance / time = a = 128 km /24 hours = 16/3km/hr Distance covered in upstream = 64km Time taken in upstream ... / 2 = (1/2)(16/3+4) km/hr = (1/2)(28/3)km/hr = 14/3km/hr.

Description : Decentralised Planning found expression for the first time in a. 1 st FYP b. 8 th FYP c. 11 th FYP d. 12 th FYP

Last Answer : a. 1 st FYP

Description : A student sets up an expirment on photoysthesis as folows : He takes soda water in a glass tumbler and adds chloroplyll into the contents and keeps th

Last Answer : A student sets up an expirment on photoysthesis as folows : He takes soda water in a ... because intact chloroplasts are needed for the process.

Description : Each side of an equilateral triand 12 is \( 24 cm \) the mid - point of its sides are joined to form another tranpla this brress is doins centinuously infinite46. The perimeter of 7 th triangle is \( ( \) in \( cm ) \)a) \( \ ... of the 5th triangle is (in \( cm \) )a) 6b) \( 1.5 \)c) \( 0.75 \)d) 3

Last Answer : Each side of an equilateral triand 12 is \( 24 cm \) the mid - point of its sides are joined to form another tranpla ... ( 1.5 \) c) \( 0.75 \) d) 3

Description : A committee of 5 members is to be formed from 8 men and 5 women. How many committees can be formed if at least 2 women and 1 man have to present in the committee? a) 800 b) 840 c) 880 d) 920 e) 996

Last Answer : The various possible cases are: i. 2 women and 3 men = 5C2 × 8C3 = 10 × 56 = 560 ii. 3 women and 2 men = 5C3 × 8C2 = 10 × 28 = 280 iii. 4 women and 1 men = 5C4 × 8C1 = 5 × 8 = 40 Total = 560 + 280 + 40 = 880 Answer: c)

Description : An industry employed 1200 men and 800 women and the average salary was Rs 51 per day. If a woman got Rs 10 less than a man , then what are their daily salary?(mens and women respectively) A) men Rs 25 and women Rs ... Rs 45 and women Rs 55 C) men Rs 35 and women Rs 25 D) men Rs 55 and women Rs 45

Last Answer : D) Let the daily salary of man be Rs’x’ Then the daily salary of a women = Rs (x-100 Now 1200x + 800(x-10) = 51 *(1200+800) 1200x+800x -8000 = 51*2000 2000x = 102000+8000 =110000 X=55 Therefore mens daily salary Rs 55 and womens daily salary Rs 45

Description : Which of the following is not true about warfarin, a. INR of 3 is enough to start any extraction. b. Affects extrinsic system and increases prothrombin time. c. Heparin can be given subcutaneously ... rapidly. d. It takes at least 12 hours for Vitamin K to reverse the effects of coumarin.

Last Answer : d. It takes at least 12 hours for Vitamin K to reverse the effects of coumarin.

Description : Which of the following is not true about warfarin, ** A. INR of 3 is enough to start any extraction B. Affects extrinsic system and decreases prothrombin time C. Heparin can be given subcutaneously and acts rapidly D. It takes up to 12 hours for Vitamin K to reverse the effects of warfarin

Last Answer : B. Affects extrinsic system and decreases prothrombin time

Description : A server crashes on the average once in 30 days, that is, the Mean Time Between Failures (MTBF) is 30 days. When this happens, it takes 12 hours to reboot it, that is, the Mean Time to Repair (MTTR) is 12 ... these reliability data values is approximately: (A) 96.3% (B) 97.3% (C) 98.3% (D) 99.3%

Last Answer : (C) 98.3%

Description : A man takes 10 hours to cover a distance while traveling upstream on a boat, whereas while traveling downstream it takes 6 hours. If the speed of the boat in still water is 6 kmph, what is the speed of the stream? 1 : 2.5 kmph 2 : 2.2 kmph 3 : 2 kmph 4 : 1.5 kmph 5 : None of these

Last Answer : 4 : 1.5 kmph

Description : If six men working 8 hours a day earn Rs.840 per week, then 9 men working 6 hours per day will earn per week a) Rs. 940 b) Rs. 945 c) Rs. 1620 d) Rs. 1680 e) Rs. 1245

Last Answer : b) Rs. 945

Description : Marco and Bob have been the best friends ever since they were little kids. They are also very competitive. Throughout the years they have challenged each other to do both physical and mental challenges. And ... and the same size. It is a physical challenge. Can you figure out what it was? -Riddles

Last Answer : Marco challenged Bob to get a tan, but he couldn't...Bob is an albino.

Description : If 24 women and 32 girls can do a piece of work in 5 days; 26 women and 48 girls can do it in 4 days then the ratio of the daily work done by a women to that of a girl is. a) 2:1 b) 1:3 c) 3:1 d) 1:2

Last Answer : A Let 1 women's 1 day work = x 1 girl's 1 day work = y Then 24x+32y = 1/5 =>6x+8y = 1/20 ------->1 26x + 48y = 1 / 4 => 13x + 24y = 1/8 -------->2 Multiply 1 by 3 18x + 24y = 3/20 13x + ... 200 = (10 - 6)/ 200 = 4/200 8y = 1/50 Y=1/400 Required ratio = x:y = 1/200: 1/400 =400:200 =2:1

Description : A bakery P can sold 500 breads in 4 hours, bakery Q can sold the same number of bread in 5 hrs while bakery R can sold them in 6 hrs. All the bakeries are opened at 8 a.m while bakery P is closed ... complete their target. Approximately at what time will the work be finished? a) 10 b) 8 c) 12 d) 6

Last Answer : A (P+Q+R)'s 1 hour work = (1/4 +1/5+ 1/6) =(15+12+10)/60 =37/60 Remaining work = 1- 37/60 = 23/60 (Q+R)'s 1 hour work = (1/5 +1/6) =11/30 Now 11/30 work is done by Q and R ... R in(30/11*23/60) =23/22 hrs = 1hr So the work will be finished approximately 1 hr after 9.am i.e., around 10 a.m

Description : Do you think men are perceived to be funnier than women? Is a woman with a sense of humour valued as much as a man with the same sense of humour?

Last Answer : I hope so ;)

Description : When do you finish composite resin restorations: A. Immediately after curing B. After 24 hours C. A week after placement

Last Answer : A. Immediately after curing

Description : X and Y can do a job in 24 days, Y & Z can do the same job in 36 days. X,Y,Z together can finish it in 18 days. X and Z together will do it in. a) 24 b) 36 c) 12 d) 26

Last Answer : A (X+Y+Z) s 1 day work =1/18 (X+Y)'s 1 day work = 1/24 (Y+Z)'s 1 day work = 1/36 (X+Z)'s 1 day work = 2[X+Y+Z]'s 1 day work - [(X+Y)'s 1 day work + (Y+Z)'s 1 day work]= 2 [1/18]- (1/24 + ... /24 + 1/36) = 1/9 -1/24 - 1/36 =(8-3-2)/72 =3/72 = 1/24 So X & Z together will do the work in 24 days