A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

1 Answer

Answer :

A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Related questions

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : A,B and C can do a work in 20,45 and 120 days respectively.They started the work. A left 10 days before and B left 5 days before the completion of wor

Last Answer : A,B and C can do a work in 20,45 and 120 days respectively.They started the work. A left 10 ... work. In how many days is the total work completed ?

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description :  Arfath is thrice as good workman as deekshith and together they finish a piece of work in 27 days. In how many days will arfath alone finish the work? a) 9 days b) 10 days c) 11 days d)12 days

Last Answer : A Arfath’s 1 days work = 3 Deekshith 1 day’s work = 1 Arfath 1 day’s work : Deekshith 1 days work = 3:1 (Arfath + deekshith )’s 1 day’s work = 1/27 Divide 1/27 in the ratio 3:1 Arfath’s 1 days work = 1/27 *3/1 = 3/27 =1/9 Hence Arfath’s alone can finish the work in 9 days

Description : M do a piece of work in 45 days and N can finish it in 40 days. They work together for 5 days and then M leaves. In how many days will N finish the remaining work? a) 30 5/9 b) 29 4/9 c) 31 3/5 d) 29 5/9

Last Answer : A Time taken by M to finish the work = 45 days. M's 1 day's work = 1/45 Time taken by N to finish the work = 40 days. N's 1 day's work = 1/40 (M + N)'s 1 day's work = (1/40+1/45) = ... be done by N in (55/72*40) days = 30and 5/9 days. Hence, the remaining work is done by B in 30 and 5/9 days.

Description : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also finish it in 2 days. Now find the time taken by one woman to compl

Last Answer : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also ... time one man takes to complete the same job working alone.

Description : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Last Answer : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Description : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where as X and Z can do it in 20 days. Who is the most effci

Last Answer : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where ... Z can do it in 20 days. Who is the most effcient?

Description : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start the work together and work for some time, then B leaves. If A com

Last Answer : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start ... then find the number of days for which they worked together.

Description :  P and Q undertake to do a piece of job for Rs.1200. P alone can do it in 12 days while Q alone can do it in 16 days. With the help of R , they finish it in 6 days. Find the share of P,Q & R. a) 400,600,200 b) 200,400,600 c) 450,400,250 d) 600,450,150

Last Answer : D R;s 1 day work = 1/6 – (1/12 + 1/16) =1/6 – 1/12 – 1/16 = (8-4-3)/48 = 1/48 P:Q:R = ratio of 1 day work = 1/12:1/16 : 1/48 =4:3:1 P’s share = Rs(1200*4/8) =Rs.600 Q’s share = Rs(1200 * 3/8) =Rs.450 R’s share = Rs(1200 * 1/8) =Rs.150

Description : 6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days. a) 4 days b) 6 days c) 2 days d) 8 days e) 7 days

Last Answer : Let work done by 1 man in 1 day = m and work done by 1 woman in 1 day = b Work done by 6 men and 8 women in 1 day = 1/10 => 6m + 8b = 1/10 => 60m + 80b = 1 --- (1) Work done by 26 men and 48 ... 1 day = 15/100 + 20/200 =1/4 => Time taken by 15 men and 20 women in doing the work = 4 days Answer: a)

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : Rishwi can finish a work in 6 days working 4 hours a day. Dhiviksha can complete the same work in 4 days working 5 hrs a day. If both rishwi and dhiviksha work together, working 4 hrs a day, in how many days can they finished the work? a) 30/11 b) 11/120 c) 11/30 d) 30/13

Last Answer : A Rishwi can complete the work in (6*4) = 24 hrs Dhiviksha can complete the work in (4*5) = 20 hrs Rishwi's 1 hr work = 1/24 Dhiviksh's 1 hr work = 1/20(Rishwi and dhivikasha)'s 1 hr work = (1/24 ... fininsh the work in (120/11)hrs Number of days of 4 hrs each = 120/11*1/4 =120/44 =30/11 days

Description : A boy and his mother together can do a piece of work in 24 days while the day, working with his father, can complete it in 18 days. If the mother and

Last Answer : A boy and his mother together can do a piece of work in 24 days while the day, working with ... take to complete the job, if they work individually.

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : 4 male and 6 female do a piece of work in 20 days while 6 male and 4 female can do the same work in16 days. In how many days can 4 male and 2 female do the work? a) 3 62/142 b) 2 18/124 c) 4 81/165 d) 1 67/133

Last Answer : D Let 1 male's 1 day's work = x 1 female's 1 day's work = y Then 4x + 6y = 1/20 ---------->A 80x + 120y = 1 -----------1 6x + 4y = 1/16 ----------B 96x + 64y = ... (1/400) =132/200+1/200 = 133/200 So 4 male and 2 female together can finish the work in 200/133 = 1 67 /133 days

Description : X and Y can do a job in 24 days, Y & Z can do the same job in 36 days. X,Y,Z together can finish it in 18 days. X and Z together will do it in. a) 24 b) 36 c) 12 d) 26

Last Answer : A (X+Y+Z) s 1 day work =1/18 (X+Y)'s 1 day work = 1/24 (Y+Z)'s 1 day work = 1/36 (X+Z)'s 1 day work = 2[X+Y+Z]'s 1 day work - [(X+Y)'s 1 day work + (Y+Z)'s 1 day work]= 2 [1/18]- (1/24 + ... /24 + 1/36) = 1/9 -1/24 - 1/36 =(8-3-2)/72 =3/72 = 1/24 So X & Z together will do the work in 24 days

Description : A task is done by 46 persons not all of them have the same capacity to task. Every day exactly 2 persons, do the task with no pair of persons working together twice. Even after all possible pairs have worked ... in which all the persons together will finish the whole task? a) 44 b) 45 c) 46 d) 47

Last Answer : D 46 persons task in pairs, with no same pair of persons working together. Each person will be working with other 45 which means each persons will work for 45 days in pair. Let the time taken by each ... +1/T46)= 1/47 If all the persons work together they will finish the whole task in 47 days.

Description : X does half as much work as Yand Z does half as much work as X and Y together. If Z alone can finish the work in 120 days, then together ,all will finish the work in ? a) 14 1/2 b) 40 c) 24 1/2 d)17 1/3

Last Answer : B Z alone can finish the work in 120 days. As given Z does half as much work as X and Y together => (X + Y) can do it in 60 days (X+ Y)s 1 days wok = 1/60. X's 1 days work : Y's 1 days Work = 1 ... (1/90) + (1/120) =(2+4+3)/360 =9/360 = 1/40 All the three together will finish it in 40 days

Description : Assertion: Ecological pyramids cannot explain all vital functions of any ecosystem. Reason: Pyramids actually do not explain the role of organisms wor

Last Answer : Assertion: Ecological pyramids cannot explain all vital functions of any ecosystem. Reason: Pyramids actually ... and Reason are false, then mark (4)

Description : 20 workers working 5hours a day can finish the work in 20 days.If the workers went to work for 4hours a day.How many more workers are required to complete the work in same 20days? 1)7 2)4 3)5 4)6

Last Answer : 3)5 Exp: workers required for 4h=>(5/4)×20=25. 25-20=5.

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then find the time it takes for 2 men and 3 women to finish th

Last Answer : If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then ... takes for 2 men and 3 women to finish the same work.

Description : 6 men and 10 women can finish making pots in 8 days, while the 4 men and 6 women can finish it in 12 days. Find the time taken by the one man alone from that of one woman alone to finish the work. -Maths 9th

Last Answer : Given: 6 men and 10 women can finish making pots in 8 days 4 men and 6 women can finish it in 12 days To find: Time taken by the one man alone from that of one woman alone to finish the work ... = 48Then time taken by the one man alone from that of one woman alone to finish the work is 48 days

Description : A officer undertakes to complete a job in 250 days. He employs 300 male for 50 days and they complete 1/2 of the work . He then reduces the number of male to 100, who work for 120 days, after which there ... male must be employed for the remaining period to finish the work? a) 25 b) 50 c) 45 d) 35

Last Answer : B 300 male in 50 days do = 1/2work 1 male in 1 day does = ½*1/50*1/300 work 100 male in 120 days do = ½ *1/50*1/300 *100*120 =2/5 work Total work done = ½ + 2/5 =(5+4)/10=9/10 ... is done in 50 days by 300 male 1/10 work is done in 60 days by =300*50*1*2/10*60 =50 male

Description : A can do a work in 15 days and B in 20 days. If they work together for 4 days, then the fraction of work that is left is a) 7/15 b) 8/10 c) 8/15 d) 7/20

Last Answer : c) 8/15

Description : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the thre of them can complete the work in 24 days. In how man

Last Answer : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the ... days. In how many days can C alone complete it ?

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : Praneetha and Pooja together can do a piece of work in 24 days ,which pooja and priya can do in 32 days. After praneetha has been working at it for 10 days and pooja for 14 days, Priya finishes it in 26 days. In how many days Priya alone will do the work? a) 12 days b) 24 days. c) 48 days d) 50 days

Last Answer : C Praneetha's 10 day's work + Pooja 14 day's work + Priya's 26 days work = 1 (Praneetha's +pooja's) 10 day's work + (pooja + priya)'s 4 day's work +priya's 22 days work = 1 =>10/24 + 4/32 + priya' ... 13/24 =11/24 Priya's 1 day's work = 11/24 * 1/22 =1/48 Priya can finish the work in 48 days.

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : Rubika can do the 12 times the actual work in 72 days while sathya can do the one-half of the original work in 6 days. In how many days will both working together complete the 6 times of the original work? a) 20 days b) 25 days c) 30 days d) 35 days

Last Answer :  C Efficiency of Rubika = 16.666% Efficiency of sathya = 4.166% Total efficiency of rubika and sathya =(16+4) =20% Actual work 100/20=5 So, they can do actual work in 5 days So, 6 times work requires 30 days.

Description : X, Y, Z are engaged to do a certain piece of work for Rs.8200.Y and Z are to execute 15/26 of the work together. Amount to be paid to X is A) 4287 B) 3469 C) 6124 D) 2865

Last Answer : Answer: B)  Y and Z are execute 15/26 of week Balance =1-15/26  11/26 of work completed by X  X’s share of revenue  =11/26 *8200  =Rs 3469

Description : 8 male can finish a work in 6 days.12 female can complete the same work in 9 days. 6 male and 4 female started working and after 4 days 3 more female joined them. How many days will they now take to complete the remaining work? a) 76/41 days b) 25/62days c) 3/31days d) 4/77days

Last Answer : A 1 male's 1 day work = 1/48 1 female's 1 day work = 1/108 Work done in 4 days = 4 (6/48 +4/108) =4(1/8+1/27) =1/2+4/27 =(27+8)/54 =35/54 Remaining work = (1 - 35/54) = 19/ ... (27+14)/216 =41/216 Now 41/216 work is done by them in 1 day Therefore time taken = 216/41 * 19/54 = 76/41 days

Description : 60 girls can do a work in 48 days. 48 boys can finish the same work in 45 days. What is the ratio between the capacity of a boys and girls? a) 2:1 b) 3:6 c) 2:4 d) 4:3

Last Answer : D  Total number of girls =60 Total number of boys =48 (60*48) girls can complete the work in 1 day 2880 girls can complete the work in 1 day 1 girls 1 day work =1/2880 (48*45) boys can complete the work ... day 1 boys 1 day work =1/2160 So required ratio =1/2160 : 1/2880 =2880 : 2160 =4:3

Description : Nandhu, naren and abishek can do a piece of work in 10,15, and 30 days respectively. In how many days can Nandhu do the work if he is assisted by naren and abishek on alternate days? a) 6.6 days b) 7.5 days c) 8.4 days d) 9.1 days 

Last Answer : B Nandhu's 1 day work = 1/10 Naren's 1 day work = 1/15 Abishek's 1 day work =1/30 Nandhu's 2 day's work =(1/10*2) =1/5 (nandhu + naren+abishek)'s 1 day work = 1/10+1/15+1/30 =3+2+1/30 =6/30 ... +1/5 = 2/5 Now 2/5 work is done in 3 days Whole work will be done in 3 *5/2 = 15/2 = 7.5 days

Description : Satish can do 1/5th of a work in 5 days while he and Ramesh together can do 9/10th of the same work in 10 days. They start the work together and work

Last Answer : Satish can do 1/5th of a work in 5 days while he and Ramesh together can do 9/10th of ... days in which Ramesh alone can finish the remaining work.

Description : Arul can do a certain work in 9 days while Ravi can do the same work in 7 days. Both of them complete the work together and get Rs.288. what is the share of Arul? a) Rs.124 b) RS.126 c) Rs.128 d) Rs.130

Last Answer : B Arul’s 1 day work = 1/9 Ravi’s 1 day work = 1/7 Arul’s salary : Ravi’s salary = Arul’s 1 day work : Ravi’s 1 day work = 1/9 : 1/7 = 7 :9 Arul’s share = Rs.(7/16 *288) =Rs.126

Description : Anyone created a faux metal finish on a piece of furniture?

Last Answer : I think it could be done. Are you looking for a pure' silver/pewter or an antiqued look? Metallic paint almost never looks like the real thing, so I'd suggest antiquing over the paint. You ... could also leave the tables black, but use silver paint to accent the edges or any details or paneling.

Description : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Last Answer : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : P, Q and R can do a piece of work in 18,24 and 36 days on the second day and P on the third day, again R on the fourth day and so on. Then in how, many days will the work be completed? 1. 25 2. 24 3. 22 4. 20 5. 26

Last Answer : 2;

Description : A and B working alone can finish a job in 5 days and 7 days respectively. They work at it alternately for a day. If A starts the work, find in how many days the job will be finished? a) 29/5 b) 11/5 c) 24/5 d) 21/5 e) None of these

Last Answer : Work done by A in one day = 1/5 and work done by B in one day = 1/7 They are working alternately. Therefore, Work done in first two day = (1/5 + 1/7) = 12/35 Work done in first four day = 24/35 Work done in ... = 4/35/1/7 = 4/5 of the day. Therefore Total days taken = 5 + 4/5 = 29/5 days Answer: b)

Description : Want to know how to get rid of piles ? I have been suffering from piles for the last 2 years. Recently I went to a homeopathic doctor and he assured me that the problem will be reduced in 20-25 days and will ... !!! Could it really be that ... so what can I do , please help me with some advice ...

Last Answer : If you take homeopathic medicine then the homeopathic doctor has rightly said that it will take 3/4 months to get better but you need to consult a piles expert 2 years ago. You can stay. Therefore, a piles ... by the piles doctor. So I said take the advice of a piles expert to get a quick solution.