The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

1 Answer

Answer :

The ratio of the number of days required by A,B and C to do a piece of work hours is `1:2:3`. Then, the ratio of work is ……………

Related questions

Description : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are required to complete double the work in 25 days, wo

Last Answer : Fifteen men can complete a piece of work in 10 days, working 8 hours per day. How many persons are ... work in 25 days, working 6 hours per day ?

Description : If 24 women and 32 girls can do a piece of work in 5 days; 26 women and 48 girls can do it in 4 days then the ratio of the daily work done by a women to that of a girl is. a) 2:1 b) 1:3 c) 3:1 d) 1:2

Last Answer : A Let 1 women's 1 day work = x 1 girl's 1 day work = y Then 24x+32y = 1/5 =>6x+8y = 1/20 ------->1 26x + 48y = 1 / 4 => 13x + 24y = 1/8 -------->2 Multiply 1 by 3 18x + 24y = 3/20 13x + ... 200 = (10 - 6)/ 200 = 4/200 8y = 1/50 Y=1/400 Required ratio = x:y = 1/200: 1/400 =400:200 =2:1

Description : A,b and C can do a piece of work in 3,4 and 6 days respectively. The ratio of their work capacities is …………..

Last Answer : A,b and C can do a piece of work in 3,4 and 6 days respectively. The ratio of their work capacities is …………..

Description : If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then find the time it takes for 2 men and 3 women to finish th

Last Answer : If a man cando a piece of work in 8 hours and a women can do the same work in 12 hours, then ... takes for 2 men and 3 women to finish the same work.

Description : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Last Answer : If 40 men complete a piece of work in 5 days, then 80 man can complete the same piece of work in _____.

Description : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start the work together and work for some time, then B leaves. If A com

Last Answer : A can do a piece of work in 20 days while B can do it in 30 days. Both of them start ... then find the number of days for which they worked together.

Description : A can complete a piece of work working along with B in 20 days. If he can complete the same work working along with C in 10 days, then between B and C

Last Answer : A can complete a piece of work working along with B in 20 days. If he can complete the same work ... , then between B and C who is more efficient ?

Description : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Last Answer : X, Y and Z can complete a piece of work in 10 days. X and Y can do it in 20 days. Then Z alone can complete the work in ……………… days.

Description : A man can do a piece of work in 10 days. With the help of a boy he can do the same piece of work in 8 days. If they get Rs. 11115 for the work then what will be the share of boys? a) Rs.2223 b) Rs.2784 c) Rs.3163 d) Rs.3312 e) None of these

Last Answer : In one day boys can do = (1/8) – (1/10) = (5-4)/10 = 1/40 part so, boys can finish the work in 40 days. Now, Men’s share : Boy’s share = 40 : 10 = 4 : 1 Boys share = (11115 / 5) × 1 = Rs. 2223 Answer is: a)

Description : P, Q and R can do a piece of work in 18,24 and 36 days on the second day and P on the third day, again R on the fourth day and so on. Then in how, many days will the work be completed? 1. 25 2. 24 3. 22 4. 20 5. 26

Last Answer : 2;

Description : Pranesh can do a piece of job in 60 days. He works at it for 4 days and then sarvesh alone finishes the remaining work in28 days. In how much time will pranesh and sarvesh working together, finish the work? a) 35 days b) 30 days c) 25 days d) 20 days

Last Answer : D Work done by pranesh in 4 days = 1/60 *4 =1/15 Remaining work = 1-1/15 =(15 - 1)/15 =14/15 Now 14/15 work done by sarvesh in 28 days Whole work will be done by sarvesh in(28*15 /14) = 2* 15 =30 ... 's work = 1/60 + 1/30 = (1+2) /60 = 3/60 =1/20 Hence both will finish the work in 20 days

Description : M do a piece of work in 45 days and N can finish it in 40 days. They work together for 5 days and then M leaves. In how many days will N finish the remaining work? a) 30 5/9 b) 29 4/9 c) 31 3/5 d) 29 5/9

Last Answer : A Time taken by M to finish the work = 45 days. M's 1 day's work = 1/45 Time taken by N to finish the work = 40 days. N's 1 day's work = 1/40 (M + N)'s 1 day's work = (1/40+1/45) = ... be done by N in (55/72*40) days = 30and 5/9 days. Hence, the remaining work is done by B in 30 and 5/9 days.

Description : P,Q, & R can complete a piece of job together in 20 days. All the 3 started working at it together and after 8 days P left. Then Q & R together completed a job in 20 more days. P alone could complete the work in. a) 60 b) 50 c) 40 d) 30

Last Answer : B Work done by P,Q & R in 8 days = 1/20 * 8 =2/5 Remaining work = (1 - 2/5) = 3/5 Now 3/5 work is done by Q & R in 20 days Whole work will be done by Q & R in(20*5/3) =100/3 days (P+Q+R ... (Q+R)'s 1 day work =1/20 - 3/100 =5-3/100 =2/100 =1/50 P alone could complete the work in 50 days..

Description : A certain number of men can do a work in 15 days working 8 hours a days.If the number of men is decreased `(1)/(3)`, then in how many days can twice t

Last Answer : A certain number of men can do a work in 15 days working 8 hours a days.If the number of ... completed by the remaining men working 5 hours per day?

Description : A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

Last Answer : A is thrice as fast as B. If B can do a piece of work in 60 days, the number of days they take to complete the work is ……..

Description : Ram, Suresh and Shilpa, working together, can do a piece of work in 1 day. Ram is thrice as efficient as Suresh, and Suresh takes twice the number of days as Shilpa takes to do it alone. What is the difference between ... and Shilpa, each working alone, to complete the work? a) 1 b) 2 c) 3 d) 4 e) 5

Last Answer : Let the time taken by Ram, Suresh and Shilpa to finish the work alone be A, B and C respectively Therefore, 1/A + 1/B + 1/C = 1 Also it is given that, A = B/3 and C =B/2 3/B + 1/B + ... between the number of days taken by Ram and Shilpa, each working alone, to complete the work = 3-2 = 1 Answer: a)

Description : Rakchita can do a piece of work in 28 days, while Shreya can do the same work in 42 days.They started the work together but 6 days before the completion of the work, Rakchita left the work. The total number of days to complete the work is a) 3 b) 4 c) 5 d) 6 

Last Answer : D 6 days before the completion of the work Rakchita left the work means in last 6 days only Shreya has worked alone So, in last 6 days worked done by Shreya = 6*1/42=6/42=1/7 So, the rest = 1-1/7 =6/7 So 6/7work was done by Rakchita and Shreya worked together=6/7*70/10 =420/70=6 days

Description : Vinay can do a work in 28 days. Vikram is 75% more efficient than vinay. The number of days taken by vikram to do the same piece of work.  a) 12 days b) 14 days c) 16 days d) 18 days

Last Answer : C Given a certain work done by vinay = 28 days Efficient percentage of vikram = 75% Ratio of time taken by vinay and vikram = 175 : 100 = 7:4 Suppose vikram takes ‘x’ days to do the work. 7:4 :: 28 : x 7x = 4*28 X= 4*28/7 X= 4*4 = 16 days So vikram takes 16 days to do the work.

Description : Karthik is 2 times as good workman as Raghu and together they complete a piece of work in 42 days. The number of days taken by Karthik alone to finish the work is. a) 55 days b) 60 days c) 63 days d) 67 days

Last Answer : C Karthik’s 1 day work : Raghu’s 1 day work = 2:1 (Karthik + Raghu)’s 1 day work = 1/42 Divide 1/42 in the ratio 2:1 Therefore karthick’s 1 day work = 1/42 * 2/3 =1/63 Hence karthik alone can finish the work in 63 days.

Description : A certain number of men can do a job in 10 days, working 6 hours a day. If the number of men is decreased by `(1)/(3)rd`, then in how many days can th

Last Answer : A certain number of men can do a job in 10 days, working 6 hours a day. If the number of ... remaining men complete the work, working 9 hours per day?

Description : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be employed so as to complete the work in

Last Answer : Twenty two men cann complete a piece of work in 17 days. They work for 2 days. How many more men should now be ... A. 11 B. 22 C. 33 D. none of these

Description : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the thre of them can complete the work in 24 days. In how man

Last Answer : The capacities of A,B and C to complete a piece of work is `1:2:3`. By working together, the ... days. In how many days can C alone complete it ?

Description : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Last Answer : A and B can do a piece of work in 12 days, B and C in 15 days and C and A in 20 days. In how many days can they do it, all working together?

Description : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also finish it in 2 days. Now find the time taken by one woman to compl

Last Answer : 4 women and 3 men can do a piece of work in 2 days while 6 women and 2 men can also ... time one man takes to complete the same job working alone.

Description : A boy and his mother together can do a piece of work in 24 days while the day, working with his father, can complete it in 18 days. If the mother and

Last Answer : A boy and his mother together can do a piece of work in 24 days while the day, working with ... take to complete the job, if they work individually.

Description : A and B together can do a piece of work in 20 days, while B and C together can do the same work in 15 days. If A ,B and C together can finish this wor

Last Answer : A and B together can do a piece of work in 20 days, while B and C together can do the same ... number of days in which B alone can finish the work.

Description : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where as X and Z can do it in 20 days. Who is the most effci

Last Answer : Working together, X and Y can do a piece of work in 12 days, Y and Z can do it in 15 days where ... Z can do it in 20 days. Who is the most effcient?

Description : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Last Answer : X and Y can do a piece of work in 20 days and 30 days respectively. The time they take to complete the work by working together is ……………

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : A,B and C can do piece of work in 11 days,20 days and 55 days respectively, working alone. How soon can the work be done if a is assisted by B and C on alternate days/ a) 6 b) 7 c) 8 d) 9 e) 10

Last Answer : Work done by A and B in one day = 1/11 + 1/20 =31/220 Work done by A and C in one day = 1/11 + 1/55 =6/55 Work done in 2 days = 31 /220+6/55=55/220 = ¼ Hence, 1/4 of the work is done in 2 days Hence, it takes 8 days to finish the work Answer : c

Description : 8 men and 4 women-together can complete a piece of work in 6 days. Work done by a man in one day is double the work done by a woman in one day. If 8 men and 4 women started working and after 2 days, 4 men ... more days will the work be completed? a) 7 days b) 6 days c) 5 days d) 8 days e) 4 days 

Last Answer : 1 man = 2 women 8 men + 4 women = 20 women 2 day's work of 20 women = 20 × 6/1 = 20 × 2/x x =1/3 Remaining work = 1 – 1/3 = 2/3 Total number of females = 16 20 × 6/1 = 16 × x ÷2/ 3 x = 5 days Short Cut M1D1=M2D2+M3D3 10x6 =10x2 + 8 x 60-20= 8x x= 5 days Answer: c)

Description : Twenty workers can complete a piece of work in 30 days. After how many days should 5 workers leave the job so that the work is completed in 35 days? a) 5 days b) 10 days c) 15 days d) 20 days

Last Answer : c) 15 days

Description : 8 men and 8 boys can finish a piece of work in 10 days. 9 women and 7 boys can finish the same work in 10 days. Also 7 men and 6 women can finish the same work in 10 days. In how many days 1man, ... boy can finish the work, at their double efficiency? a) 25 days b) 20 days c) 15 days d) 10 days

Last Answer : A Efficiency of 8 men and 8 boys = 10% Efficiency of 9 women and 7boys = 10% Efficiency of 7 men and 6 women = 10% So, Efficiency of 15 men, 15women and 15boys = 30% So, efficiency of 1 man ... efficiency Efficiency of 1 man, 1 woman and 1 boy = 4% Required number of days = 100/4=25 days

Description : Praneetha and Pooja together can do a piece of work in 24 days ,which pooja and priya can do in 32 days. After praneetha has been working at it for 10 days and pooja for 14 days, Priya finishes it in 26 days. In how many days Priya alone will do the work? a) 12 days b) 24 days. c) 48 days d) 50 days

Last Answer : C Praneetha's 10 day's work + Pooja 14 day's work + Priya's 26 days work = 1 (Praneetha's +pooja's) 10 day's work + (pooja + priya)'s 4 day's work +priya's 22 days work = 1 =>10/24 + 4/32 + priya' ... 13/24 =11/24 Priya's 1 day's work = 11/24 * 1/22 =1/48 Priya can finish the work in 48 days.

Description : Nandhu, naren and abishek can do a piece of work in 10,15, and 30 days respectively. In how many days can Nandhu do the work if he is assisted by naren and abishek on alternate days? a) 6.6 days b) 7.5 days c) 8.4 days d) 9.1 days 

Last Answer : B Nandhu's 1 day work = 1/10 Naren's 1 day work = 1/15 Abishek's 1 day work =1/30 Nandhu's 2 day's work =(1/10*2) =1/5 (nandhu + naren+abishek)'s 1 day work = 1/10+1/15+1/30 =3+2+1/30 =6/30 ... +1/5 = 2/5 Now 2/5 work is done in 3 days Whole work will be done in 3 *5/2 = 15/2 = 7.5 days

Description : 4 male and 6 female do a piece of work in 20 days while 6 male and 4 female can do the same work in16 days. In how many days can 4 male and 2 female do the work? a) 3 62/142 b) 2 18/124 c) 4 81/165 d) 1 67/133

Last Answer : D Let 1 male's 1 day's work = x 1 female's 1 day's work = y Then 4x + 6y = 1/20 ---------->A 80x + 120y = 1 -----------1 6x + 4y = 1/16 ----------B 96x + 64y = ... (1/400) =132/200+1/200 = 133/200 So 4 male and 2 female together can finish the work in 200/133 = 1 67 /133 days

Description :  Arfath is thrice as good workman as deekshith and together they finish a piece of work in 27 days. In how many days will arfath alone finish the work? a) 9 days b) 10 days c) 11 days d)12 days

Last Answer : A Arfath’s 1 days work = 3 Deekshith 1 day’s work = 1 Arfath 1 day’s work : Deekshith 1 days work = 3:1 (Arfath + deekshith )’s 1 day’s work = 1/27 Divide 1/27 in the ratio 3:1 Arfath’s 1 days work = 1/27 *3/1 = 3/27 =1/9 Hence Arfath’s alone can finish the work in 9 days

Description : Among 4 persons A, B, C and D. A takes twice as much time as B to complete a piece of work. B takes twice as much time as C and C takes twice as much time as D to complete the same work. One group of three of the ... is the group that takes 11 days? a) A.B.C b) A,B,D c) B,C,D d) None of the above

Last Answer : B From the given information B is twice as efficient as A. C is twice as efficient as B. D is twice efficient as C. If work done by A in a day is 'n' units, the work done in a day by B, ... of times taken to complete the work by the former and later groups is 11:7 A, B and D take 11 days.

Description : Which of the following statement(s) is/are true concerning the management of a patient with hemophilia A undergoing an elective surgical operation? a. Concentrates of factor VIII should be given ... observed e. A new recombinant preparation of factor VIII offers the advantage of being virus-free

Last Answer : Answer: b, c, e Although the half-life of factor VIII is 2.9 days in normal individuals, the half-life of factor VIII concentrates is 9 to l8 hours. Levels of 80% to ... infection in the hemophilia population. A new recombinant preparation of factor VIII offers the advantage of being virus-free

Description : A boys rows to a certain place and comes back, but by mistake he covers 2/3rd more distance while coming back. The total time for this journey is 20 hours. The ratio of speed of boat to that of ... starting point from his present position? A) 2hr 13mints B)1hr 30 mins C) 2hr 30mins D)1hr 40 mins

Last Answer : ANSWER : A Explanation: let speed of boat and stream be 2x and x respectively So downstream speed = 2x+x = 3x, and upstream speed = 2x-x = x Let total distance between points is d km So he covered d ... with speed 3x = 48 km/hr(downstream) So time is 80/36 * 60 = 133.33 minutes = 2hr 13mins

Description : How to get rid of amulets without any loss ? One man works at my house. My father was able to convince him that he was suffering from malnutrition. He brought a stone for her and said: Put the stone in ... do not know how to get rid of it without being a victim. We look forward to hearing from you.

Last Answer : Ignore the truth ; As stated by the Prophet (peace and blessings of Allaah be upon him). This should be avoided through the Shariah-approved Rukia (sweeping) and daily Doaduruds ; Not with the ... have to advise your father to repent from the sin of hanging amulets and being associated with amulets.

Description :  P and Q undertake to do a piece of job for Rs.1200. P alone can do it in 12 days while Q alone can do it in 16 days. With the help of R , they finish it in 6 days. Find the share of P,Q & R. a) 400,600,200 b) 200,400,600 c) 450,400,250 d) 600,450,150

Last Answer : D R;s 1 day work = 1/6 – (1/12 + 1/16) =1/6 – 1/12 – 1/16 = (8-4-3)/48 = 1/48 P:Q:R = ratio of 1 day work = 1/12:1/16 : 1/48 =4:3:1 P’s share = Rs(1200*4/8) =Rs.600 Q’s share = Rs(1200 * 3/8) =Rs.450 R’s share = Rs(1200 * 1/8) =Rs.150

Description : P and Q can do a piece of job in 24 days; Q and R can do it in 30 days while R and P can finish it in 40 days. If P, Q, Rworks together, in how many days will they finish the job? In how many days will each ... finish it, working alone? A) 15,25,35,45 B) 20,30,40,120 C) 20,30,40,50 D) 20,25,30,60 

Last Answer : B Time taken by (P + Q) to finish the job = 24days. (P + Q)'s 1 day's job = 1/24 Time taken by (Q +R) to finish the job = 30days. (Q + R)'s 1 day's job = 1/30 Time taken by (R + P) to finish the ... - {(P + Q)'s 1 day's job } = (1/20 -1/24)=1/120 Hence, R alone can finish the job in 120 days.

Description : Is it legal in Canada if a business owner wants to personally work 20 hours a day, 7 days a week, 364 days a year without pay?

Last Answer : answer:Why isn’t he working the 365th day? Must be a slacker! I am no expert in Canadian law, but in the US, a business owner can do anything he wants in this regard. No one can tell him how many hours he can work, if he owns the place.

Description : is there a law on how many overtime hours they can make me work i work seven days a week but im on salary for 40 a week?

Last Answer : If you are a Exempt employee as stated under the US FSLA then your employeer can assign as much overtime as stated in your job contract. If you are a Non Exempt employee your ... laws. I would recomend contacting your local state employment agency and have them review your Employment situation.

Description : can a employer make a salaried employee-manager work 7 days a week and excessive hours over 70?

Last Answer : No the cannot. In fact, a programmer working for Vivendi Universal Games is suing his employer for working him overtime and not being compensated for doing so. They even went as far as saying ... colleagues were told to fill out false timesheets to say they worked less time than they actually did.

Description : For walls, columns and vertical faces of all structural members, the form work is generally removed after (A) 24 to 48 hours (B) 3 days (C) 7 days (D) 14 days

Last Answer : Answer: Option A

Description : A contract is to be completed in 46 days and 117 men were set to work, each working 8 hours a day. After 33 days, 4/7 of the work completed. How many additional men may be employed so that the work may be completed in time, each man now working 9 hours a day? a) 79 b) 80 c) 81 d) 82 e) 83

Last Answer : work finished by 33 days = 33 117 8 = 30888 man hours 4/7th of the job is finished. remaining work = 1-(4/7) = 3/7 if 4/7th of the work is 30888 hours, then 3/7th of the work = [30888 ... 9 number of men = 198 since, 117 men are already working, additional men required = 198 - 117 = 81 Answer: c)

Description : There are 6 working days in a regular week and for each day, 10 hours is working hours. A woman earns Rs. 2.10 per hour. For regular work and Rs. 4.20 per hour for overtime. If he earns Rs. 525 in 4 weeks, how many hours did she work ? 1) 245 2) 225 3) 275 4) 255 5) 235

Last Answer : 1) 245

Description : Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men work to complete the job? (a) 8 hrs (b) 7 1/2 hrs (c) 7 hrs (d) 9 hrs

Last Answer : (b) 7 1/2 hrs