State any four precast non-structural components that can be used for speedy construction.

1 Answer

Answer :

1. Architectural Precast

2. Insulated Architectural Cladding

3. Insulated Wall Panels

4. Column Covers

5. Precast Concrete Light Wall

6. Precast Concrete Spandrels

7. Precast Concrete Solid Walls

8. Stormwater Deflector

9. Façade

10. Concrete panels for partition walls

11. Concrete planks

Related questions

Description : State any four advantages and four disadvantages of precast concrete.

Last Answer : Advantages: 1. Very rapid speed of erection 2. Good quality control 3. Entire building can be precast-walls, floors, beams, etc. 4. Rapid construction on site 5. High quality because of ... is required in the application of the panel on site. 11. Cranes are required to lift panels.

Description : State any two names of materials used in precast concrete

Last Answer : 1. Cement 2. Sand 3. Steel 4. Water 5. Polystyrene 6. Fly ash. 7. Ground granulated blast furnace slag

Description : Describe any two design considerations for Precast Canal lining.

Last Answer : 1. Precast concrete slabs, laid properly on carefully prepared sub-grades and with the joints, effectively sealed, constitute a serviceable type of lining. The precast slabs are about 5 to ... . However, seepage losses are obviously more. Transportation of precast slabs may contribute to breakage. 

Description : Explain the loss of prestress due to friction and slip of anchorage and state two remedial measures to avoid them.

Last Answer : Loss due to Friction: This loss occurs only in post-tensioned members. There always exists a certain amount of friction in the jacking and anchoring system and on the walls of the duct. So, ... over-extending the tendon in the prestressing operation by the amount of the draw - in before anchoring

Description : State the advantages and disadvantages of prestressed concrete.

Last Answer : Advantages: 1. The c/s ismore efficiently used in fully prestressed members. 2. Dead loads are reduced considerably. 3. Improved shear resistance, due to the effect of compressive prestress, ... cube strength of 35 N/mm2 for Posttensioned system and 45 N/ mm2 for pretensioned system.

Description : Explain determination of Water absorption of paver block and state acceptable limits as per IS. 

Last Answer : Step 1. Saturation  The test specimen shall be completely immersed in water at room temperature for 24 * 2 h. The specimen then shall be removed from the water and allowed to drain for 1 min by ... more than 6 % by mass and in individual samples, the water absorption should be restricted to 7 %

Description : State cable profile in simply supported rectangular beam section.

Last Answer : Cabe profile: In a prestressed concrete member, external type of loads is balanced by transverse component of suitable cable profile, on effect of loading the net deformation increases the stress, strain and length of the tendon, extension of tendon, increase in strain, increase in stress.

Description : Define Prestressed concrete and state types of prestressing steel.

Last Answer : Prestressed concrete: Prestressed concrete is basically a concrete in which internal stresses of a suitable magnitude and distribution are deliberately introduced so that the stresses resulting from external loads are ... 1962, and. 4) Uncoated stress relieved strand conforming to IS: 6006-1970. 

Description : For what type of structures do you recommend post-tensioning?

Last Answer : 1) High rise buildings. In long span slab where beam is not provided & the slab of assembly hall, cinema theaters etc. like structure where the distance between columns are more, then post ... Post Tensioning is used extensively for slabs on grade where soils are likely to move (expansive soils)

Description : Explain freyssinet system of prestressing with respect to process and application with sketches.

Last Answer : Process: - 1. The freyssinet system was the first to be introduced among the post - tensioned system high tensile steel wires 5mm to 8mm diameter about 12 in number are arranged to form a group into a cable ... gas (LNG) storage tank 4. Off share platforms. 5. Wind turbine towers etc.

Description : Depict the effect of pre-fabricated building on the surrounding environment with respect to noise pollution, staking at elements and transportation. 

Last Answer : Noise pollution is the serious or more noise that may damage the activity or human life. The contribution of most outside noise is mainly due to building activities. Noise pollution affects both health and ... iv) Sleep interference v) Habit of talking loudly vi) Hearing loss vii) Concentration

Description : Illustrate cable profiles for eccentric straight and parabolic cables with sketches. 

Last Answer : i) Eccentric straight cable profile: The stress due to prestressing alone are generally combined stresses due to the action of direct load bending from an eccentrically applied load. In this case, the load is ... section as shown in the figure below. ii) Parabolic cable profile

Description : Justify the necessity of use of high-grade materials in prestressed concrete.

Last Answer : 1) If mild steel is used, the working stress in it (i.e. 140 N/mm2) is more or less completely lost due to elastic deformation, creep and shrinkage of concrete. 2) The ... structural elements. With reduced dead weight of the material, larger spans become technically and economical practicable. 

Description : Explain any one method of Prefab system.

Last Answer : Prefab system: It refers to any part of a building that has been fabricated at a place other than its final location. For this reason, it can be referred to by other names such as off-site fabrication, ... If you need further assessing, feel free to contact us; your needs are all that matter to us.

Description : Explain the procedure of the storage, transportation and erection of prefabricated building elements. 

Last Answer : Storage of pre-fabricated building elements: 1) Procurement storage of Unloading raw materials 2) Testing of raw materials 3) Design of concrete mix 4) Fabrication of reinforcement cages 5) ... differs with risk condition, hence skilled foremen, and workers to be employed on the job.

Description : Describe with sketch any two joints in doors and window frame.

Last Answer : 1. Connections must be adequate structurally. 2. Means of connections between adjacent must allow safe and speedy erection regardless of minor inherent inaccuracies in precast elements and in-situ concrete. 3. ... height) of the frames shall confirm to the requirements of IS : 4021-1976

Description : List the various types of losses of prestress in pretensioned pre-stressed member.

Last Answer : i. Elastic shortening ii. Shrinkage of concrete iii. Creep of concrete iv. Relaxation of steel

Description : What is the basic principle of Prestressed concrete?

Last Answer : Principle: The compressive stresses induced by high strength steel tendons in a concrete member before the application of load, will balance the tensile stresses imposed in the member during its service.

Description : Define Modules and modular co-ordination

Last Answer : Modules: Modules are a standard unit of size used to coordinate the dimensions of buildings and components. They are of two types: 1. Multi modules 2. Basic modules  Modular Co-ordination: The modular ... for basic module is M 1M = 100mm 100 mm = 1M = It is international standard value.

Description : Various Benefits of Precast Concrete Construction ?

Last Answer : Precast concrete is a concrete construction product that is made using molds under controlled process conditions. They are later on shipped to the construction sites for use. This technique ... of using these precast concrete products in various constructions. As compared to the concrete constructi

Description : Explain the types of probable cause of non-structural cracks observed in building construction along with preventive measures for any one of crack. 

Last Answer : Cause of cracks:   Cause # 1. Movement Due To Creep: Creep of a material is defined as the property due to which the material continues to deform with time under sustained stress. ... contraction and slip joints at appropriate location. Painting top roof with reflective finish such as white wash.

Description : Explain the causes of non – structural cracks in building construction and remedial measures.

Last Answer : The important causes responsible for cracks in building are : 1. Due to movement of ground. 2. Due to temperature variation. 3. Due to moisture changes. 4. Due to effect of ... be good workmanship. 6. Uneven settlement of foundation should be avoided by resting foundation on hard strata.

Description : State any two uses of precast concrete blocks.

Last Answer : Uses of precast concrete block. 1. In parking areas, footpaths, on road to give pleasant look. 2. Fencing poles for fencing work. 3. It is used for loadbearing masonry, in earthquake zones. 4. Lightweight blocks for partition walls.

Description : In joints of precast concrete bridge segments, what are the functions of applying epoxy adhesive?

Last Answer : Epoxy adhesive is applied in these joints for the following purposes according to International Road Federation (1977): (i) It seals up the joints completely between precast concrete segments to protect the ... in transferring of shear between the joints in case a large single shear key is used.

Description : Under-reamed piles are generally (A) Driven piles (B) Bored piles (C) Precast piles (D) All the above

Last Answer : (B) Bored piles

Description : The taper of precast concrete pile should not be more than (A) 1 cm per metre length (B) 2 cm per metre length (C) 4 cm per metre length (D) 5 cm per metre length

Last Answer : Answer: Option B

Description : What are the properties of precast pavement blocks? 

Last Answer : Properties of precast pavement blocks: i) It should have good dimensional stability. ii) It should have non-skid surface. iii)It should have good compressive strength from 20 N/mm2 to 50 N/ ... have good transverse strength (3 N/mm2 and above) vi) It should have average abrasion about 3mm 

Description : Who is faster, the Road Runner or Speedy Gonzalez?

Last Answer : Tyreek Hill.

Description : Anyone care to join me in a quiet prayer for Jeret "Speedy" Peterson?

Last Answer : Not to sound cold, but it won’t help at this point.

Description : A cash discount is an incentive allowed for the speedy recovery of income.

Last Answer : State whether the following statement are true or false with reason : A cash discount is an incentive allowed for the speedy recovery of income.

Description : What is the speedy trial right in California for a felony?

Last Answer : Under the 6th Amendment to the U.S Constitution, the specifiedamount of time for a "Speedy Trial" isn't universal. The length ofthe trial or investigation must only be "reasonable".Generally, ... trials can easily last 2-3 years withoutraising concerns; however most are settled within a few months.

Description : How fast are speedy cash advances?

Last Answer : Speedy cash advances vary from place to place. Some will give you money the same day others make you wait one to two days. Call around and check for yourself. Good luck.

Description : Will a speedy cash advance give me a check or cash?

Last Answer : It can depend greatly on the business in question. Some will give you cash on the spot and others will give a check. Check with the specific business you plan to use and ask them their policy on the matter.

Description : Speedy Passport Renewal?

Last Answer : Essential details are usually overlooked when planning for an international holiday. It takes very little time to check the expiry date of the passport. Getting a speedy passport renewal can save one ... also be submitted. Set aside funds for the process. Feel free to seek professional assistance.

Description : What is the role of "Ombudsman" in a bank? (1) To provide quality and speedy redressal of grievances of customers. (2) To provide suggestions for innovative schemes in the banks. (3) To ... the branches. (4) To monitor the poverty alleviation programmes under-taken by or implemented by the bank.

Last Answer : (1) To provide quality and speedy redressal of grievances of customers. Explanation: The Banking Ombudsman Scheme enables an expeditious and inexpensive forum to bank customers for resolution of complaints relating ... Section 35 A of the Banking Regulation Act, 1949 by RBI with effect from 1995.

Description : Which of the following are Advantages of Online Advertising? A. No time or demographic constraints on delivering the online advertise B. Online advertising is promotional as well as informational C. It brings speedy outcomes D. All of the above

Last Answer : D. All of the above

Description : Excessive camber on pavements may cause (A) Deterioration of central portion (B) Slip of the speedy vehicles towards the edges (C) Erosion of the berms (D) All the above

Last Answer : Answer: Option D

Description : Speedy Bike Company received a $940 check from a customer for the balance due. The transaction was erroneously recorded as a debit to Cash $490 and a credit to Service Revenue $490. The ... Receivable, $940. d. debit Accounts Receivable, $940; credit Cash, $450 and Service Revenue, $490.

Last Answer : c. debit Cash, $450 and Service Revenue, $490; credit Accounts Receivable, $940.

Description : Firewall as part of a router program a. filters only packets coming from internet b. filters only packets going to internet c. filters packets travelling from and to the intranet from the internet d. ensures rapid traffic of packets for speedy e-Commerce

Last Answer : c. filters packets travelling from and to the intranet from the internet 

Description : The objective of Descriptive Research is Options: A) To identify and focus on the present conditions B) To study the subject on phenomenon in a speedy manner C) To collect the facts D) All the above

Last Answer : D) All the above 

Description : What is the role of Ombudsman in a bank? (1) To provide quality and speedy redressal of grievances of customers. (2) To provide suggestions for innovative schemes in the banks. (3) To ... of the branches. (4) To monitor the poverty alleviation programmes undertaken by or implemented by the bank.

Last Answer : To provide quality and speedy redressal of grievances of customers.

Description : How is cardboard used as a structural member??? how much strength it has compared to other materials used for construction?

Last Answer : Cardboard!!! For a roof!!! The support columns!!! Ehh I would not want to live in that house. Is this for a shack in Sri Lanka?

Description : Structural measures include any physical construction to reduce or avoid possible impacts of hazard. 

Last Answer : Identify the correct correlation: A - Structural measures include any physical construction to reduce or ... R is not the correct explanation of A.

Description : What are the structural components of cytochrome ?

Last Answer : Iron is the structural element of cytochrome

Description : What are the structural components of a triglyceride?

Last Answer : A triglyceride is a combination of a glycerol molecule and threefatty acids.

Description : Which of the following types of molecules are the major structural components of cell membranes?

Last Answer : a. Phospholipids and proteins. ///// b. Phospholipids and cellulose.//// c. Nucleic acids and proteins.//// d. Glycoproteins and cholesterol.

Description : The general functions of minerals are (A) The structural components of body tissues (B) In the regulation of body fluids (C) In acid-base balance (D) All of these

Last Answer : Answer : D

Description : Galvanised steel wire is generally used as (a) stay wire (b) earth wire (c) structural components (d) all of the above

Last Answer : (d) all of the above

Description : Write the procedure of construction of WBM road with neat sketch showing various components

Last Answer : Construction Procedure:  a) Preparation of Foundation: The foundation for receiving the layer of WBM may be either the sub-grade or sub-base or base course. The depressions and pot holes on the existing road ... water and rolled. No traffic is allowed till WBM layer sets and dries out. 

Description : Write the procedure of construction of cement concrete pavement showing its components. 

Last Answer : Construction procedure of Concrete Roads: 1) Preparation of subgrade by proper compaction 2) Provision of sub base to support subgrade 3) Placing of forms i.e. Steel channels 4) Batching and ... method 11) Filling of joints using joint sealers 12) Opening of traffic after cleaning