Check rails should normally be provided where the radius is …. M or less in B.G.  (a) 150m  
 (b) 200m
(c) 218m*
 (d) 240m

1 Answer

Answer :

(c) 218m*

Related questions

Description : Check rails should normally be provided where the radius is ……. M or less in B.G. (a) 150m (b) 200m (c) 208m* (d) 225m

Last Answer : (c) 208m*

Description : For B.G. the minimum radius of a curve is ……… (a) 150m (b) 175* (c) 200m (d) 225m

Last Answer : (b) 175*

Description : Minimum clearance of check rails for B.G. at level crossing should be (a) 48mm (b) 57mm (c) 51mm* (d) 44mm

Last Answer : (c) 51mm*

Description : On B.G. maximum clearances of check rails at a level crossing are (a) 51 mm (b) 57mm* (c) 65mm (d) 70mm

Last Answer : (b) 57mm*

Description : Maximum clearance of check rails at level crossing for B.G. should be (a) 48mm (b) 57mm* (c) 51mm (d) 44mm

Last Answer : (b) 57mm*

Description : On B.G. maximum clearances of check rails at a level crossing are (a) 51mm ( b ) 57mm* (c) 65mm (d) 54mm

Last Answer : ( b ) 57mm*

Description : Rails used for A T Welding shall not normally be welded? (i) 20 years old . (ii) 30 years old (iii) 40 years old (iv) 50 years old*

Last Answer : iv) 50 years old*

Description : The minimum and maximum clearances of check rails at all BG level crossings shall be a) 51 to 57 mm* b) 44 to 48 mm c) 41 to 45 mm d) 55 to 70 mm

Last Answer : a) 51 to 57 mm*

Description : Fish plated joint shall be avoided in check raisl and on the running rails within--------- from the end of level crossing a) 3 meters* b) 5 meters c) 10 meters d) 12 meters

Last Answer : a) 3 meters*

Description : A and B are two trains 150m and 100m long are running on parallel rails at the rate of 30 kmph and 40 kmph respectively.In how much time will they cross each other if they are running in the same direction. A) 80 sec B) 90sec C) 105sec D) 45sec

Last Answer : ANSWER: B Explanation:  Length of first train=150m  Length of second train=100m  Speed of first train =30kmph  Speed of second train =40kmph  If the direction is given in the same direction then we subtract ... +100)m  =250m  Time = distance/speed  Time taken =(250*9/25)sec  =90 sec.

Description : The number of standard rails (13 m) for one km. BG section single line section is (a) 120 (b) 154* (c) 168 (d) 196

Last Answer : (b) 154*

Description : On Broad Gauge tracks Banner flag at a level crossing shall be provided at a distance of--- ---------- from ends of check rail before opening the gate for road traffic. a) 5 meters* b) 3 meters c) 6 meters d) 30 meters

Last Answer : a) 5 meters*

Description : For rolling mark 60 kg/Sail/X/2010 the first testing in the field after initial testing of rails in rail manufacturing plant, will be done. (i) After test free period of 25%. (ii) After passage of every 40 ... period.* (iii) After passage of 200 GMT. (iv) On the basis of annual GMT of the section.

Last Answer : (ii) After passage of every 40 GMT traffic during test free period.*

Description : The increased gain of 10 dbs for single line & ‘D’ marks rails on double/multiple lines shall be employed for classification of defects. (i) defect in weld (ii) defects in rail. * (iii) for both defects on weld & rail. (iv) None of above.

Last Answer : ii) defects in rail. *

Description : Addition gain of 10 db is used for testing. (i) ‘D’ marked rails on single lines. (ii) ‘D’ marked rails on double lines. (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.* (iv) None of above.

Last Answer : (iii) Testing on single line and ‘D’ marked rails on double/multiple lines section.*

Description : Which gauge is used to measure the height of rail at the time of aligning of rails for AT welding? (i) Height gauge.* (ii) Vertical gauge (iii) Horizontal gauge (iv) As decided by site supervisor

Last Answer : (iv) As decided by site supervisor

Description : What are the recognized systems for pre heating of rails ends for AT Welding? (i) Oxygen –LPG & Compressed air petrol both* (ii) Only Oxygen –LPG (iii) Only Compressed air petrol both (iv) both are correct

Last Answer : ) Oxygen –LPG & Compressed air petrol both*

Description : To take care of differential cooling rail ends of 72 UTS rails are lifted by? (i) 1 to 1.5 mm (ii) 1 to 2 mm (iii) 2 to 2.5 mm (iv) 3 to 4 mm *

Last Answer : iv) 3 to 4 mm *

Description : To take care of differential cooling rail ends of 90 UTS rails are lifted by? (i) 1 mm (ii) 2 mm (iii) 2 to 2.2 mm.* (iv) 1 to 2 mm

Last Answer : (iii) 2 to 2.2 mm.*

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera

Description : In new Rail as well as second hand rails how much end bends of the rails in vertical are permitted when checked with one meter straight edge before welding? (i) +0.5mm, -0 mm in vertical * (ii) +0.2mm, -.3 mm in vertical (iii) +0.3mm, -2 mm in vertical (iv) 0 mm, +.5 mm in vertical

Last Answer : (i) +0.5mm, -0 mm in vertical *

Description : In case of Shot Welded Rails the fish plated joint should be avoided on Level Crossings within a distance of --------- from end of level crossing a) 3 meters b) 4 meters c) 5 meters d) 6 meters*

Last Answer : d) 6 meters*

Description : Length of guard rails to be bent so as to be brought together at the middle of the track.(L2) a) 3200 mm b) 4875 mm* c) 3655 mm d) None of the above

Last Answer : b) 4875 mm*

Description : The load transferred from rails to web of girders is in a) deck type girder b) through type girder c) semi-through type girder* d) plate girder

Last Answer : c) semi-through type girder*

Description : The load transferred from rails to bottom flanges is in a) deck type girder b) through type girder* c) semi-through type girder d) plate girder

Last Answer : b) through type girder*

Description : Vertical wear permissible for 60kg/90UTS. rails is:- (a) 23 mm. (b) 10 mm. (c) 13 mm.* (d) 15 mm.

Last Answer : (c) 13 mm.

Description : What is the full form UTS of rails a. Ultimate technical Strength b. Ultimate tensile Strength* c. Upper Top surface d. None of above

Last Answer : b. Ultimate tensile Strength*

Description : Clear perpendicular distance between inner faces of two rails is a. Gauge of track* b. Inner gauge c. Wheel base d. Wheel gauge

Last Answer : a. Gauge of track*

Description : Tilting of rails is done at a slope of a. 1 in 30 b. 1 in 25 c. 1 in 20* d. 1 in 15

Last Answer : c. 1 in 20*

Description : If is the speed of a locomotive in km per hour, g is the acceleration due to gravity, is the distance between running faces of the rails and is the radius of the circular curve, the required super elevation is (A) gV²/GR (B) Rg/GV² (C) GR/gV² (D) GV²/gR

Last Answer : (D) GV²/gR

Description : A 240m train crosses a standing object in 6 seconds. Find the time taken by the train to cross a long pole of length 162.5 m. A) 25 B) 45 C) 10 D) 15

Last Answer : ANSWER:C Explanation: Length of the train = 240 m Time taken to cross an object = 6 seconds Speed of the train = Length of the train / Time taken to cross an object  = 240/6 m/s  = 40 m/s  Length of ...  = (240 + 162.5)/40  = 402.5/40  = 10.06 seconds  Hence the answer is 10 seconds. 

Description : In case of LWR track, full ballast section as specified in LWR Manual should be provided up to ……….. from the bridge abutment. a) 200 m b) 50 m c) 300 m d) 100 m*

Last Answer : d) 100 m

Description : For new lines, width of formation in bank for N.G single line is (a) 3.35 m (b) 3.70 m* (c ) 5.25 m (e) 5.85 m

Last Answer : b) 3.70 m*

Description : For new lines, width of formation in cutting for N.G. single line is (a) 3.35 m* (b) 3.70 m (c) 5.25 m (d) 5.85 m

Last Answer : a) 3.35 m*

Description : For new lines, width of formation in bank for M.G. single line is (a) 5.25 m (b) 5.85 m* (c ) 6.25 m (e) 6.85 m

Last Answer : (b) 5.85 m*

Description : For new lines, width of formation in cutting for M.G. single line is (a) 5.25 m* (b) 5.85 m (c) 6.25 m (d) 6.85 m

Last Answer : (a) 5.25 m*

Description : Formation width for bank for M.G. double line section is (a) 8.50 m (b) 8.84 m (c) 9.65 m (d) 9.81 m*

Last Answer : (d) 9.81 m*

Description : Formation width for bank for B.G. double line section is (a) 10.82 m (b) 11.0 m (c) 11.58 m (d) 12.155 m*

Last Answer : (d) 12.155 m*

Description : Formation width for cuttings for B.G. single line section is (a) 5.40 m (b) 6.20 m (c) 6.25 m* (d) 6.50 m

Last Answer : (c) 6.25 m*

Description : Formation width for banks for B.G. single line section is (a) 6.10 m (b) 6.50 m (c) 6.85 m* (d) 7.0 m

Last Answer : (c) 6.85 m*

Description : Definition of minor bridge e) Single span less than 12m f) Total linear water way less than 18m g) Both a) & b)* h) None of the above

Last Answer : g) Both a) & b)*

Description : A weight of 50 N is suspended from a spring of stiffness 4000N/m and subjected to a harmonic force of magnitude 60N and frequency 60 Hz. what will be the static displacement of the spring due to maximum applied force A. 0.015m B. 0.15 m C. 15 m D. 150m

Last Answer : B. 0.15 m

Description : The Vertical Separation Minimum (VSM) for flights in accordance with IFR within controlled airspace below FL290 is: a. 500 feet (150m) b. 2500 feet (750 m) c. 1000 feet (300m) d. 2000 feet (600m)

Last Answer : c. 1000 feet (300m)

Description : The Vertical Separation Minimum (VSM) for flights in accordance with IFR within controlled airspace below FL290 is: a. 500 feet (150m) b. 2500 feet (750 m) c. 1000 feet (300m) d. 2000 feet (600m)

Last Answer : c. 1000 feet (300m)

Description : Two trains are running at 120 km/hr and 60km/hr respectively in the same direction. Fast train completely passes a boy sitting in the slower train in 15 seconds. What is the length of the fast train? A) 150m B) 550 m C) 250m D) 215m 

Last Answer :  ANSWER: C  Explanation:  Speed of the 1st train = 120km/hr  Speed of the 2nd train = 60km/hr If the direction is given in the same direction then we subtract the relative speed.  Relative speed = (120 - 60) ... / 3 * 15)m  =(750/3)m  = 250m  Therefore the length of the faster train is 250m

Description : What is the validity after supervisors course (TW-3)? (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.* (ii) 2 years (iii) 5 Years (iv) 10 Years

Last Answer : (i) Normally, supervisors shall not be required to undergo the course again. However, they may be sent for course on performance basis.*

Description : The Frog of a brick is normally made on its a) Top face* b) Bottom face c) Longer face d) Shorter side

Last Answer : a) Top face*

Description : centre to centre spacing of pile should not be more than __where d is the dia of pile shaft

Last Answer : 4d

Description : Callendar Hamilton spans are normally available maximum up to a) 60 ft. b) 100 ft. c) 150 ft. d) 200 ft.*

Last Answer : d) 200 ft.*