Investing in CCE/Six Sigma can
a. reduce labor and administrative costs.
b. increase demand and reduce labor costs.
c. reduce labor material costs.
d. increase demand.

1 Answer

Answer :

c. reduce labor material costs.

Related questions

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : This process management initiative reduces material cost and, to a lesser degree, labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : c. Continuous Product Improvement systems (CPI)

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.

Description : Investing in Vendor Just In Time can a. reduce material costs and R&D cycle time. b. reduce administrative costs and labor costs. c. reduce R&D cycle time and increase demand. d. reduce material costs and administrative costs. e. reduce material costs and increase demand.

Last Answer : d. reduce material costs and administrative costs.

Description : These TQM initiatives reduce administrative overhead; reduces the R&D cycle time and enhances the effectiveness of the promotion and sales budget. a. Concurrent Engineering (CCE); Channel Support systems ... Inventory d. Channel Support systems and Six Sigma e. Quality Initiative Training (QIT)

Last Answer : b. Quality Function Deployment and Benchmarking

Description : Investing in Concurrent Engineering can a. reduce R&D cycle time. b. reduce labor and administrative costs. c. increase demand and reduce labor costs d. reduce R&D cycle time and increase demand.

Last Answer : a. reduce R&D cycle time.

Description : Investing in Quality Function Deployment Effort can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce R&D cycle time and increase demand. d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets. e. increase demand.

Last Answer : d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets.

Description : Investing in CPI can a. reduce administrative costs. b. reduce material and administrative costs. c. reduce material costs. d. reduce labor costs and reduce R&D cycle time.

Last Answer : c. reduce material costs.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : Within the process management initiatives, concurrent engineering a. reduces material cost, inventors’ carrying costs and administrative overhead. b. reduces labor costs. c. increases the effectiveness of the sales budget and therefore demand. d. reduces R&D cycle time. e. none of the above.

Last Answer : d. reduces R&D cycle time.

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : Within the Process Management Initiatives, channel support systems a. reduce material cost. b. reduce labor costs. c. increase demand. d. reduce R&D cycle time. e. none of the above.

Last Answer : c. increase demand.

Description : Benchmarking reduces a. Material cost. b. Research and Development time. c. Labor Cost. d. Administrative Cost. e. Demand.

Last Answer : d. Administrative Cost.

Description : This process management initiative reduces material costs and administrative overhead. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : b. Vendor/Just-in-Time Inventory (JIT)

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : This process management initiative reduces R&D cycle time, a. Concurrent Engineering (CCE) b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)

Description : This process management initiative reduces labor costs. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Channel Support systems d. Quality Initiative Training (QIT)

Last Answer : d. Quality Initiative Training (QIT)

Description : Which three factors drive labor cost? a. Production capacity b. Wage and benefit rates c. Automation levels d. Second shift/Overtime costs e. b, c, d

Last Answer : e. b, c, d

Description : What is one way to lower material costs? a. decrease MTBF b. increase capacity c. increase automation d. none of the above

Last Answer : a. decrease MTBF

Description : How is Contribution Margin calculated? a. Material Cost – Labor Cost b. Price*(Material Cost-Labor Cost) c. Price – (Material cost + Labor cost) d. Price – Material Cost e. Profit –(Material Cost + Labor Cost)

Last Answer : c. Price – (Material cost + Labor cost)

Description : If the price/product is $10 and the material cost/product is $2 and the labor cost/product is $3, what is the gross margin/product? a. $6 b. $2 c. $4 d. $3 e. none of the above

Last Answer : e. none of the above

Description : .If a product’s Price was $20, its Material $8, and its Labor $7, the Margin Per Unit would be: a. $12. b. $13. c. $1. d. $5.

Last Answer : d. $5.

Description : The company’s negotiation starting position for wages a. is never more than 150% of the current contract. b. is always lower than what Labor expects. c. is always exactly 80% of the current contract. d. is always half of the increase workers are asking for. e. none of these.

Last Answer : a. is never more than 150% of the current contract.

Description : What are the drivers of Material Costs? a. Higher performance b. Smaller size c. Higher Mean Time Between Failure (MTBF) d. All of the above e. None of the above

Last Answer : d. All of the above

Description : In the Capstone® simulation, what are the components of a product's material cost? a. Cost of Inventory on hand and the cost to store it b. Reliability component cost and positioning component ... , shipping and handling d. Level of automation and product reliability e. None of the above

Last Answer : b. Reliability component cost and positioning component cost

Description : Investing more than $5,000,000 in the same TQM initiative over a two or three year period creates a. little or no additional improvement. b. high additional improvement. c. the same improvement than last period. d. diminishing returns.

Last Answer : a. little or no additional improvement.

Description : When investing in E-mail, diminishing returns apply after a. $600,000 per segment. b. $600,000 per product. c. $800,000 per product. d. $800,000 per segment. e. $500,000 per product.

Last Answer : b. $600,000 per product.

Description : When investing in Trade Shows, diminishing returns apply after a. $700,000 per product. b. $300,000 per segment. c. $800,000 per product. d. $300,000 per product. e. $500,000 per product.

Last Answer : d. $300,000 per product.

Description : When investing in web media, diminishing returns apply after a. $500,000 per product. b. $700,000 per product. c. $700,000 per segment. d. $600,000 per product. e. $600,000 per segment.

Last Answer : a. $500,000 per product.

Description : When investing in direct mail, diminishing returns apply after a. $700,000 per product. b. $700,000 per segment. c. $800,000 per product. d. $800,000 per segment. e. $500,000 per product.

Last Answer : c. $800,000 per product.

Description : What does not drive length of R&D project? a. The product's automation level on the Production line. b. The amount of money You are willing to spend on it. c. The number of R&D projects underway ... of the product's new location to an existing product in your company's line. e. The labor strike.

Last Answer : The labor strike.

Description : Labor will strike for a maximum: a. 10 days. b. 84 days. c. 60 days. d. 30 days. e. There is no strike maximum.

Last Answer : b. 84 days.

Description : Your workers go on strike because they have demanded $20/hour and your wage negotiation ceiling is at $18/hour. Assuming that there are no other labor demands, how long will the strike last? a. 2 weeks b. ... . 8 weeks d. 16 weeks e. There is no way to determine how long the strike will last.

Last Answer : a. 2 weeks

Description : Labor Negotiation includes: a. hourly wage. b. benefits. c. profit sharing. d. annual raise. e. all of the above.

Last Answer : e. all of the above.

Description : The following represent core company activities that must be addressed each year except: a. Research and Development. b. Marketing. c. Finance. d. Labor Negotiations. e. Production.

Last Answer : d. Labor Negotiations.

Description : Period costs include a. R&D. b. promotion. c. sales and administration expenses. d. all of the above.

Last Answer : d. all of the above.

Description : Investments in training leads to a __________ and _________. a. higher costs, higher turnover b. higher productivity, lower turnover c. lower productivity, lower turnover d. none of the above

Last Answer : b. higher productivity, lower turnover

Description : A 6 month project in R&D costs____________; while a 12 month project in R&D costs ________. a. 1,000,000; 1,500,000 b. 650,000; 850,000 c. 500,000; 1,000,000 d. 750,000; 1,000,000 e. 1,000,000; 750,000

Last Answer : c. 500,000; 1,000,000

Description : Adding one additional unit of capacity costs a. $4 x Change (difference) in Automation Level b. $6 + ($4 x Current Automation Level). c. $6 x Change (difference) in Automation Level. d. $4 + ($6 x Current Automation Level). e. none of these.

Last Answer : b. $6 + ($4 x Current Automation Level).

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : TQM initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required to design, ... quality resulting in improved cost structures. e. improve product quality and business procedures.

Last Answer : b. improve product quality while reducing the time and resources required to design, manufacture, warehouse and ship products.

Description : Process Management Initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required ... improved efficiencies and costs structures. d. improve product quality and business procedures.

Last Answer : a. improve business procedures, resulting in improved efficiencies and cost structures.

Description : When working with Outside Sales, each salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : d. $125,000.

Description : When working with Distributors, each distributor costs a. $35,000. b. $100,000. c. $50,000. d. $125,000.

Last Answer : b. $100,000.

Description : When working with inside sales, each inside salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : c. $50,000.

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : All of the following are direct implications of hiring a second shift except: a. increased production capacity. b. paying higher wages to second shift. c. training costs. d. increased MTBF. e. recruitment costs.

Last Answer : d. increased MTBF.