What are the drivers of Material Costs?
a. Higher performance
b. Smaller size
c. Higher Mean Time Between Failure (MTBF)
d. All of the above
e. None of the above

1 Answer

Answer :

d. All of the above

Related questions

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : The relative cost of a product’s material cost increases as: a. size is increased. b. performance is decreased. c. MTBF is raised. d. automation stays the same. e. all of the above.

Last Answer : c. MTBF is raised.

Description : All of the following are direct implications of hiring a second shift except: a. increased production capacity. b. paying higher wages to second shift. c. training costs. d. increased MTBF. e. recruitment costs.

Last Answer : d. increased MTBF.

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : What is one way to lower material costs? a. decrease MTBF b. increase capacity c. increase automation d. none of the above

Last Answer : a. decrease MTBF

Description : Which one of the following statements regarding preferred position in fine cut is false? a. Traditional customers want products located in the center of the circle. b. Low end customers want the ... . d. Performance customers prefer higher performance levels. e. Size customers want smaller size.

Last Answer : b. Low end customers want the newest technology at the cheapest price.

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : R&D completion time can be diminished a. by repositioning a product. b. the more a company changes a product’s MTBF. c. when several products are put into R&D at the same time. d. when a company takes advantage of existing technology. e. none of the above.

Last Answer : d. when a company takes advantage of existing technology.

Description : How much does it cost for MTBF per 1,000 hours of reliability? a. $0.50 b. $0.40 c. $0.30 d. $0.20 e. $0.10

Last Answer : c. $0.30

Description : The customer survey score is driven by a. market share. b. price. c. 4P’s. d. price and market share. e. perceptual map, MTBF and price.

Last Answer : c. 4P’s.

Description : The reliability component cost of a product with a 17,000 hour MTBF rating is: a. $5.10. b. $17.00. c. $51.00. d. $170. e. cost cannot be determined with information given.

Last Answer : a. $5.10.

Description : Changing MTBF will: a. have no impact on Perceived Age. b. increase Perceived Age. c. decrease Perceived Age. d. change Perceived Age. e. is undetermined.

Last Answer : a. have no impact on Perceived Age.

Description : n Capstone® a. the terms age and perceived age are not used interchangeably. b. the term MTBF means multiple transient business format. c. the terms age and perceived age are used interchangeably. d. all products will eventually have to be retired. e. none of the above.

Last Answer : c. the terms age and perceived age are used interchangeably.

Description : MTBF is measured in a. day increments. b. hour increments. c. minute increments. d. 30-minute increments. e. 15-minute increments.

Last Answer : b. hour increments.

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.

Description : Investing in Vendor Just In Time can a. reduce material costs and R&D cycle time. b. reduce administrative costs and labor costs. c. reduce R&D cycle time and increase demand. d. reduce material costs and administrative costs. e. reduce material costs and increase demand.

Last Answer : d. reduce material costs and administrative costs.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : This process management initiative reduces material costs and administrative overhead. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : b. Vendor/Just-in-Time Inventory (JIT)

Description : Within the process management initiatives, concurrent engineering a. reduces material cost, inventors’ carrying costs and administrative overhead. b. reduces labor costs. c. increases the effectiveness of the sales budget and therefore demand. d. reduces R&D cycle time. e. none of the above.

Last Answer : d. reduces R&D cycle time.

Description : Within the Process Management Initiatives, channel support systems a. reduce material cost. b. reduce labor costs. c. increase demand. d. reduce R&D cycle time. e. none of the above.

Last Answer : c. increase demand.

Description : Investments in training leads to a __________ and _________. a. higher costs, higher turnover b. higher productivity, lower turnover c. lower productivity, lower turnover d. none of the above

Last Answer : b. higher productivity, lower turnover

Description : Higher automation leads to lower production costs and has what effect on repositioning a product on the perceptual map? a. makes it more difficult and expensive b. makes it easier and cheaper c. no effect d. eliminates repositioning

Last Answer : a. makes it more difficult and expensive

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : This process management initiative reduces material cost and, to a lesser degree, labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : c. Continuous Product Improvement systems (CPI)

Description : In the Capstone® simulation, what are the components of a product's material cost? a. Cost of Inventory on hand and the cost to store it b. Reliability component cost and positioning component ... , shipping and handling d. Level of automation and product reliability e. None of the above

Last Answer : b. Reliability component cost and positioning component cost

Description : Investing in CPI can a. reduce administrative costs. b. reduce material and administrative costs. c. reduce material costs. d. reduce labor costs and reduce R&D cycle time.

Last Answer : c. reduce material costs.

Description : The Perceptual Map is a. a marketing tool used to compare products against customer perceptions. b. a marketing tool used to compare performance against size. c. a marketing tool used to compare ... used to compare age against position. e. a marketing tool used to compare time against motion.

Last Answer : a. a marketing tool used to compare products against customer perceptions. b. a marketing tool used to compare performance against size.

Description : Investing in CCE/Six Sigma can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce labor material costs. d. increase demand.

Last Answer : c. reduce labor material costs.

Description : Which of the following is not the correct yearly drift rate for the corresponding segment? a. In the traditional segment performance drifts by +0.7 and size by -0.7. b. In the low segment performance drifts by +0.5 ... size by -0.7. e. In the size segment performance drifts by -0.7 and size by +1.0.

Last Answer : e. In the size segment performance drifts by -0.7 and size by +1.0.

Description : Every year the Traditional segment circle drifts ____ in performance and _____ in size. a. +1.0, -0.7 b. +0.7, -0.7 c. -0.7, +0.7 d. +0.5, -0.5 e. +0.9, -0.9

Last Answer : b. +0.7, -0.7

Description : The center spot of traditional products drifts _______ each year. a. +0.7 performance, -0.7 size b. +0.5 performance, -0.5 size c. +0.9 performance, -0.9 size d. +1.0 performance, -0.7 size e. +0.7 performance, -1.0 size

Last Answer : a. +0.7 performance, -0.7 size

Description : For positioning in the fine cut, which one is not right? a. Traditional preferred position is located in the center of circle. b. Low End preferred position is located upper left of circle. c. ... lower right of the circle. e. Size preferred position is located in the lower right of the circle.

Last Answer : c. High End preferred Position is located in the lower left of the circle.

Description : Customers go through a two-stage buying process: The Rough Cut and the Fine Cut. In the Rough Cut, buyers focus on four product characteristics. Which one of the following is NOT one of these four product characteristics? a. Performance b. Age c. Size d. Reliability e. Price

Last Answer : b. Age

Description : R&D projects can drive a product’s: a. size. b. age. c. reliability. d. performance. e. all of the above.

Last Answer : e. all of the above.

Description : The two characteristics that the perceptual map evaluates are a. Performance and Size. b. Performance and Price. c. Size and Price. d. Reliability and Performance. e. none of the above.

Last Answer : a. Performance and Size.

Description : Your ___________ department controls the performance and size, therefore position of your sensor products within the market. a. Planning b. Finance c. R&D d. Marketing

Last Answer : c. R&D

Description : In the Rough Cut buying stage, “reliability” is expressed in terms of: a. Mean Time Between Failure. b. how long the product will last. c. years. d. months. e. Mean Time Before Failure.

Last Answer : a. Mean Time Between Failure.

Description : Investing in Quality Function Deployment Effort can a. reduce labor and administrative costs. b. increase demand and reduce labor costs. c. reduce R&D cycle time and increase demand. d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets. e. increase demand.

Last Answer : d. reduce R&D cycle time and enhance the effectiveness of the promo and sales Budgets.

Description : TQM initiatives a. improve business procedures, resulting in improved efficiencies and cost structures. b. improve product quality while reducing the time and resources required to design, ... quality resulting in improved cost structures. e. improve product quality and business procedures.

Last Answer : b. improve product quality while reducing the time and resources required to design, manufacture, warehouse and ship products.

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : The segments all drift to the lower-right section of the perceptual map. Why does this drift take place? a. Customers want smaller and less expensive products. b. Customers want reliable and affordable ... and faster products. d. Customers want newer and faster products. e. None of the above.

Last Answer : c. Customers want smaller and faster products.

Description : What trend can be explicitly observed in the industry in which your company is operating? a. More and more products are sold directly to the private end consumer. b. Products become more and more expensive. ... and smaller. d. Customers show less and less brand loyalty. e. All of the above.

Last Answer : c. Products become smaller and smaller

Description : A 6 month project in R&D costs____________; while a 12 month project in R&D costs ________. a. 1,000,000; 1,500,000 b. 650,000; 850,000 c. 500,000; 1,000,000 d. 750,000; 1,000,000 e. 1,000,000; 750,000

Last Answer : c. 500,000; 1,000,000

Description : Adding one additional unit of capacity costs a. $4 x Change (difference) in Automation Level b. $6 + ($4 x Current Automation Level). c. $6 x Change (difference) in Automation Level. d. $4 + ($6 x Current Automation Level). e. none of these.

Last Answer : b. $6 + ($4 x Current Automation Level).

Description : When working with Outside Sales, each salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : d. $125,000.

Description : When working with inside sales, each inside salesperson costs a. $35,000. b. $100,000. c. $50,000. d. $125,000. e. $110,000 plus a commission of 1%.

Last Answer : c. $50,000.

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : Which three factors drive labor cost? a. Production capacity b. Wage and benefit rates c. Automation levels d. Second shift/Overtime costs e. b, c, d

Last Answer : e. b, c, d

Description : Investing in Concurrent Engineering can a. reduce R&D cycle time. b. reduce labor and administrative costs. c. increase demand and reduce labor costs d. reduce R&D cycle time and increase demand.

Last Answer : a. reduce R&D cycle time.

Description : This process management initiative reduces labor costs. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Channel Support systems d. Quality Initiative Training (QIT)

Last Answer : d. Quality Initiative Training (QIT)