All of the following are direct implications of hiring a second shift except: a. increased production capacity.
b. paying higher wages to second shift.
c. training costs.
d. increased MTBF.
e. recruitment costs.

1 Answer

Answer :

d. increased MTBF.

Related questions

Description : Labor costs are driven by three factors: a. wage and benefit rates, automation levels, and MTBF. b. wage and benefit rates, positioning, and second shift. c. wage and benefit rates, second ... , automation levels, and second shift. e. wage and benefit rates, second shift, and material costs.

Last Answer : d. wage and benefit rates, automation levels, and second shift.

Description : ncreasing a product’s reliability will result in which of the following changes to production costs? a. Lower material cost b. Higher material cost c. Higher labor costs d. Lower labor costs e. Reducing MTBF has no effect on costs of production

Last Answer : b. Higher material cost

Description : Which three factors drive labor cost? a. Production capacity b. Wage and benefit rates c. Automation levels d. Second shift/Overtime costs e. b, c, d

Last Answer : e. b, c, d

Description : How much higher are second shift wages than the first shift wages? a. 0 % b. 20 % c. 40 % d. 50 % e. 60 %

Last Answer : d. 50 %

Description : A new unit of capacity costs $6 for the floor space plus $4 times a. hourly wage. b. automation rating. c. unit cost. d. MTBF. e. $0.65.

Last Answer : b. automation rating.

Description : What are the drivers of Material Costs? a. Higher performance b. Smaller size c. Higher Mean Time Between Failure (MTBF) d. All of the above e. None of the above

Last Answer : d. All of the above

Description : What is one way to lower material costs? a. decrease MTBF b. increase capacity c. increase automation d. none of the above

Last Answer : a. decrease MTBF

Description : How can assembly lines double their capacity? a. Speed up the production. b. Add a second shift. c. Double the material. d. Build more assembly lines. e. Assembly lines cannot be doubled.

Last Answer : b. Add a second shift.

Description : What is one drawback of increasing automation? a. The product requires increased time/expense for subsequent short-move repositioning. b. Operating second shift becomes more expensive. c. ... d. Automation slows production capability. e. It requires more employees for the production line.

Last Answer : a. The product requires increased time/expense for subsequent short-move repositioning.

Description : The relative cost of a product’s material cost increases as: a. size is increased. b. performance is decreased. c. MTBF is raised. d. automation stays the same. e. all of the above.

Last Answer : c. MTBF is raised.

Description : When the Human Resources module is activated, which areas must be addressed? a. Complement (number of workers) b. Caliber (recruitment of talent of workers) c. Training (time workers spend in training) d. Benefits (retirement planning for workers) e. a, b, and c

Last Answer : e. a, b, and c

Description : What is the total cost in dollars for adding 1.0 million units of capacity to a production line with an automation level of 1.0 and floor space costs per unit of $6? Assume automation costs per unit of $4. a. $26 million b. $10 million c. $2.6 million d. $1 million e. none of the above

Last Answer : b. $10 million

Description : Investments in training leads to a __________ and _________. a. higher costs, higher turnover b. higher productivity, lower turnover c. lower productivity, lower turnover d. none of the above

Last Answer : b. higher productivity, lower turnover

Description : Workers will not strike approximately 7 days for a. $1 difference in wages. b. $300 difference in benefit package. c. percentage point difference in Profit Sharing. d. 1 hour difference in training. e. percentage point difference in Annual Raise.

Last Answer : d. 1 hour difference in training.

Description : Higher automation leads to lower production costs and has what effect on repositioning a product on the perceptual map? a. makes it more difficult and expensive b. makes it easier and cheaper c. no effect d. eliminates repositioning

Last Answer : a. makes it more difficult and expensive

Description : Which financial obligation is best satisfied with Bond Issues? a. Accounts Payable b. Increased production capacity c. Changes in A/R policy d. Salary increases e. All of the above

Last Answer : b. Increased production capacity

Description : How much does it cost for MTBF per 1,000 hours of reliability? a. $0.50 b. $0.40 c. $0.30 d. $0.20 e. $0.10

Last Answer : c. $0.30

Description : The customer survey score is driven by a. market share. b. price. c. 4P’s. d. price and market share. e. perceptual map, MTBF and price.

Last Answer : c. 4P’s.

Description : The reliability component cost of a product with a 17,000 hour MTBF rating is: a. $5.10. b. $17.00. c. $51.00. d. $170. e. cost cannot be determined with information given.

Last Answer : a. $5.10.

Description : Changing MTBF will: a. have no impact on Perceived Age. b. increase Perceived Age. c. decrease Perceived Age. d. change Perceived Age. e. is undetermined.

Last Answer : a. have no impact on Perceived Age.

Description : n Capstone® a. the terms age and perceived age are not used interchangeably. b. the term MTBF means multiple transient business format. c. the terms age and perceived age are used interchangeably. d. all products will eventually have to be retired. e. none of the above.

Last Answer : c. the terms age and perceived age are used interchangeably.

Description : R&D completion time can be diminished a. by repositioning a product. b. the more a company changes a product’s MTBF. c. when several products are put into R&D at the same time. d. when a company takes advantage of existing technology. e. none of the above.

Last Answer : d. when a company takes advantage of existing technology.

Description : MTBF is measured in a. day increments. b. hour increments. c. minute increments. d. 30-minute increments. e. 15-minute increments.

Last Answer : b. hour increments.

Description : The cost to increase automation to 8.0 is equal to a. First Shift Capacity X [$8 X (4 - Automation Level). b. First Shift Capacity X [$8 X (4 + Automation Level). c. First Shift Capacity X [$4 X ... Capacity X [$4 X (8 + Automation Level). e. First Shift Capacity X [$4 X (4 - Automation Level)

Last Answer : c. First Shift Capacity X [$4 X (8 – Automation Level).

Description : Which of the following is true about the Accounts Receivable Lag and its implications on demand? a. If you offer no credit, demand falls to about 60% of normal. b. At 30 days, demand is 90%. c. At 45 days, demand is 95%. d. At 60 days, demand is 98.5%. e. At 90 days, demand is 100%.

Last Answer : d. At 60 days, demand is 98.5%.

Description : Adding one additional unit of capacity costs a. $4 x Change (difference) in Automation Level b. $6 + ($4 x Current Automation Level). c. $6 x Change (difference) in Automation Level. d. $4 + ($6 x Current Automation Level). e. none of these.

Last Answer : b. $6 + ($4 x Current Automation Level).

Description : Budgeting money to Quality initiative will lead to these outcomes except: a. decrease R&D time. b. increase Demand. c. increase Labor Costs. d. increase efficiency. e. produce administrative savings.

Last Answer : c. increase Labor Costs.

Description : Quality Initiative Training can a. increase demand. b. decrease R&D cycle time. c. decrease material costs. d. decrease labor costs. e. decrease administrative costs.

Last Answer : d. decrease labor costs.

Description : The TQM initiative reduces material costs and labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : a. Concurrent Engineering (CCE)/Six Sigma

Description : This process management initiative reduces material costs and administrative overhead. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : b. Vendor/Just-in-Time Inventory (JIT)

Description : This process management initiative reduces material cost and, to a lesser degree, labor costs. a. Concurrent Engineering (CCE)/Six Sigma b. Benchmarking c. Continuous Product Improvement systems (CPI) d. Channel Support systems e. Quality Initiative Training (QIT)

Last Answer : c. Continuous Product Improvement systems (CPI)

Description : This process management initiative reduces labor costs. a. Benchmarking b. Vendor/Just-in-Time Inventory (JIT) c. Channel Support systems d. Quality Initiative Training (QIT)

Last Answer : d. Quality Initiative Training (QIT)

Description : When purchasing increased Capacity and Automation, the new capacity becomes available a. immediately. b. in 1 year. c. in 6 months. d. in 2 years. e. none of these.

Last Answer : b. in 1 year.

Description : The company’s negotiation starting position for wages a. is never more than 150% of the current contract. b. is always lower than what Labor expects. c. is always exactly 80% of the current contract. d. is always half of the increase workers are asking for. e. none of these.

Last Answer : a. is never more than 150% of the current contract.

Description : To run perfectly, all HR department managers should know that a. the negotiation starting point should not exceed 80%. b. the starting point for benefits or wages should be between 0-150% of the current ... negotiation ceiling. d. all of the above is correct. e. none of the above are true.

Last Answer : c. all strike settlements should be halfway between the demand and the negotiation ceiling.

Description : If current wages are set at $10/hour, what would be the minimum starting pay that your company would offer? a. $6/hour b. $8/hour c. $10/hour d. $12/hour e. none of the above

Last Answer : b. $8/hour

Description : For Wages, the negotiation Starting Position cannot be less than ____% or more than ____% of the current contract. a. 75; 125 b. 75; 150 c. 80; 125 d. 80; 150

Last Answer : d. 80; 150

Description : Which is false about production in Capsim? a. Teams cannot produce beyond 100% capacity. b. Teams should match their production schedule to the teams sales forecast. c. There is a one year lag ... year lag between purchase and use of additional production automation. e. All of the above are true.

Last Answer : a. Teams cannot produce beyond 100% capacity.

Description : What is the most important element that ensures the accuracy of the Proformas reports? a. Production capacity b. Marketing sales forecasts c. R & D decisions d. Financial decisions e. All of the above

Last Answer : b. Marketing sales forecasts

Description : If all of the capacity on a production line is sold a. all remaining inventory is sold for half the average cost of production. b. a loss is written off on the income statement. c. Capstone ... company will receive a cash payment of 65% the original investment on capacity. e. all of the above.

Last Answer : e. all of the above.

Description : Lowering the automation level will result in a. receiving a cash payment of $4 per unit of capacity. b. a tax credit. c. a charge. d. immediate changes to production lines. e. none of the above.

Last Answer : c. a charge.

Description : A production line with 1000 units of capacity has a max production capability of: a. 1000. b. 1500. c. 2500. d. 2000. e. as many as needed.

Last Answer : d. 2000.

Description : If you sell off a production line (capacity and automation), the amount of cash that the company will receive will be a. 65% of the original cost. b. average cost of production for the previous year (market ... . 50% of the book value. d. 50% of the acquisition cost. e. 65% of the book value.

Last Answer : a. 65% of the original cost.

Description : If you purchase production capacity and automation: a. it is available immediately. b. it is available in 6 months. c. it is available in the next year. d. it is available when you need it. e. none of the above.

Last Answer : c. it is available in the next year.

Description : The following represent core company activities that must be addressed each year except: a. Research and Development. b. Marketing. c. Finance. d. Labor Negotiations. e. Production.

Last Answer : d. Labor Negotiations.

Description : Looking at the production, if the potential bar is higher than the actual one, a. the company should spend more budget in sales. b. the company over produced and missed sales ... company under produced and missed sales opportunities. e. the company should spend more budget in marketing.

Last Answer : d. the company under produced and missed sales opportunities.

Description : If you sell all the capacity on a production line, Capstone interprets this as a. a liquidation instruction and will sell your remaining inventory for one third of the average cost of ... a liquidation instruction and will sell your remaining inventory for 65 percent of the production cost.

Last Answer : b. a liquidation instruction and will sell your remaining inventory for half the average cost of production.

Description : Investing in Channel Support Systems can a. increase demand. b. reduce R&D cycle time. c. reduce material costs. d. reduce labor costs. e. reduce administrative costs.

Last Answer : a. increase demand.