What's The Difference Between Unit Testing, Assembly Testing And Regression Testing?

1 Answer

Answer :

 Unit testing ensures that the program unit meets the requirements which are reliable. Unit testing is normally conducted by the programmer who is supervised by the team lead. Testing the individual unit is the main objective of unit testing. Unit testing follows white box testing style.
 Assembly testing demonstrates the interaction among modules in a correct, stable and proper manner which was defined in the functional requirements that are provided by the client. Assembly testing follows black box testing style.
 Regression testing ensures the proper functionality of an application irrespective of changes or enhancements to the system. The testers will run all the scripts in order to ensure that nothing has been affected.

Related questions

Description : In the maintenance phase the product must be tested against  previous test cases. This is known as testing. (a) Unit (b) Integration (c)Regression (d) Module (e) Beta

Last Answer : (c)Regression

Description : What Is Regression Testing?

Last Answer : Regression testing is performed to see if the system would work well in case of any enhancements or changes in future. Here, all the scripts are run together to see that others are not affected by a change in one module.

Description : What Is Assembly Testing?

Last Answer : Assembly testing moves one step ahead of Unit testing. It checks if two or more modules are able to communicate and produce expected results or not. No Unit in the system can perform stand alone activities ... result. Assembly testing is a way of Black box testing and can be done through the UI.

Description : What is normally considered as an adjunct to the coding step a) Integration testing b) Unit testing c) Completion of Testing d) Regression Testing

Last Answer : Ans : b

Description : The final form of testing COTS is........................testing. a) Unit (b) Integration (c) Alpha (d) Module (e) Beta.

Last Answer : (e) Beta.

Description : What Is Unit Testing?

Last Answer : Unit testing, also called Component testing is performed by programmers to test that a specified unit of the program meets the expected output when a particular input is provided. Here, the programmer has ... in the components. A Unit in unit testing means a module self contained and by itself.

Description : What Is Difference Between Sitp And Utp In Testing?

Last Answer :  A test plan that is done at the smallest level or stand alone mode is known as Unit Test Plan. For example, a project is having customer and invoicing modules. So the test on ... normally done by developers and the system testing is normally done by testing professionals in an integrated mode.

Description : What Is Difference Utp In Testing ?

Last Answer : UTP (Unit Test Plan) are done at smallest unit level or stand alone mode. UTP can be done using NUNIT. Unit testing is done normally by developers.

Description : Wondering what is regression testing and when you need one?

Last Answer : Regression Testing is a type of testing that is done to verify that a code change in the software does not impact the existing functionality of the product. This is to make sure the product works fine with new functionality, bug fixes or any change in the existing feature.

Description : Regression testing should be performed: i. every week ii. after the software has changed iii. as often as possible iv. when the environment has changed v. when the project manager says a) i & ii are true, iii, iv & v are ... iv are true, i, iii & v are false d) ii is true, i, iii, iv & v are false

Last Answer : c) ii & iv are true, i, iii & v are false

Description : Impact Analysis helps to decide :- a) How much regression testing should be done. b) Exit Criteria c) How many more test cases need to written. d) Different Tools to perform Regression Testing

Last Answer : a) How much regression testing should be done.

Description : Repeated Testing of an already tested program, after modification, to discover any defects introduced or uncovered as a result of the changes in the software being tested or in another related or ... software component: a) Re Testing b) Confirmation Testing c) Regression Testing d) Negative Testing

Last Answer : c) Regression Testing

Description : Big bang approach is related to A. Regression testing B. Inter system testingC. Re-testing D. Integration testing

Last Answer : D. Integration testing

Description : COTS is known as A. Commercial off the shelf sA. Sanity testing B. System testing C. Smoke testing D. Regression testing

Last Answer : C. Smoke testing

Description : The testing attempts to violate those procedures, which should test the adequacy of the security procedures. A. Disaster testing B. Functional testing C. Regression testing D. Compliance testing

Last Answer : D. Compliance testing

Description : The selection of test cases for regression testing A. Requires knowledge on the bug fixes and how it affect the system B. Includes the area of frequent defects C. Includes the area which has undergone many/recent code changes D. All of the above

Last Answer : D. All of the above

Description : Which testing is an integration testing approach that is commonly used when “shrink-wrapped” software products are being developed? a) Regression Testing b) Integration testing c) Smoke testing d) Validation testing

Last Answer :  Ans : c

Description : Testing of software with actual data and in actual environment is called (A) Alpha testing (B) Beta testing (C) Regression testing (D) None of the above

Last Answer : (B) Beta testing

Description : In which testing strategy requirements established during requirements analysis are validated against developed software? (A) Validation testing (B) Integration testing (C) Regression testing (D) System testing

Last Answer : (A) Validation testing

Description : Which of the following statement(s) is/are TRUE with regard to software testing? I. Regression testing technique ensures that the software product runs correctly after the changes during maintenance. II. Equivalence partitioning is a ... (1) only I (2) only II (3) both I and II (4) neither I nor II

Last Answer : (1) only I 

Description : Identify, from among the following, the correct statement. a) One of the main challenges Engineering facing today is the requirement of most systems to work with a multitude of  homogenous systems ... of component based assembly, we find  that onlyless than 20% of today's is still custom built

Last Answer : c) does not wear-out in the traditional sense of the term, but  does tend to deteriorate as it evolves

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Differentiate Between Sitp And Utp In Testing?

Last Answer :  SITP - System Integration Test Plan - This test is performed in an integrated mode usually by the testing team.  UTP - Unit Test Plan - This test plan is performed at the smallest level or in a standalone mode. It is usually performed by the developers.

Description : What Is V Model In Testing?

Last Answer : The mapping of the type of testing to the stage of development in a given project is done by V model. In this model of testing there is a testing stage for every development stage which means a mapping between the development and a testing.

Description : What Do You Mean By V-model In Testing?

Last Answer : V-model performs a mapping between the type of test and the stage in project development i.e which test is to be performed at which stage. This has 4 levels of testing the system: 1. ... independent tester. 3. System Testing- performed by system team. 4. Acceptance testing-performed by the client.

Description : What Is Acceptance Testing?

Last Answer : Acceptance Testing is performed by the client to see if the system delivers what was requested. It looks similar to system testing but the difference is in the focus. Here, the testing is done by Client ... point of view as he is the one who knows the whole process and requirements of his business.

Description : What Is System Testing?

Last Answer : System testing is done to see if the system delivers the required features, functional and nonfunctional requirements & outputs. It doesn't check each component individually but the whole system is ... Testing.  Volume Testing.  Stress Testing.  Documentation Testing.  Robustness Testing.

Description : What Is Black Box Testing And White Box Testing?

Last Answer : Black box testing is an external perspective of the object that is to be tested to obtain test cases. These tests may be functional or non functional. The valid and invalid inputs are tested ... chosen by the tester to exercise paths through the code to determine the outputs that are appropriate.

Description : What Is White Box Testing?

Last Answer : White box testing is done to test the accuracy of logic and code of the program. It is done by programmers who know the logical flow of the system. It can be done by testing the classes or components in isolation. One of the ways of doing it is Unit Testing.

Description : What Is Black Box Testing?

Last Answer : Black box testing or functional testing means testing the software for the outputs when specified inputs are provided. It is usually performed to see if the software meets the user's requirements. There's ... . An example of this could be manual testing of the system by a tester, assembly testing.

Description : Who orchestrate the completion of the project by inducting the right people at the  right time to address the right issue and make the right decisions?  A.Project Coordinator  B.Project Manager  C.Operations Manager  D.Strategic Business Unit Head

Last Answer : B.Project Manager

Description : Feasibility study determines -----------------  A.Whether the project is possible with resources  B.Comparing the project with world class manufacturing norms C.Calculate the cost crashing each unit  D.Add duration to each unit

Last Answer : A.Whether the project is possible with resources

Description : A Unit Price (UP) contract provides: 1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the  contract progresses  2. a reimbursement of allowable cost of services ... unit rates and the  final price is dependent on the quantities needed to carry out the work.

Last Answer : 4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the  final price is dependent on the quantities needed to carry out the work

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : Relationship based on unrelated level of activity and past data of cost is measured with help of A. cost estimation B. price estimation C. unit estimation D. production estimation

Last Answer : A. cost estimation

Description : A Project with a total funding of $100,000 finished with a BAC value of $95,000. What term can BEST describe the difference of $5,000? A. Cost Variance B. Management Overhead C. Management Contingency Reserve D. Schedule Variance

Last Answer : C. Management Contingency Reserve

Description : Fill in the blank. The _____ is the difference between the additional money spent on  prevention and the corresponding reduction in the cost of failure. Select one: a. cost-benefit analysis b. implicit cost c. cost of quality d. variable cost e. cost-utility analysis

Last Answer : c. cost of quality

Description : Free float for any activity is defined as the difference between A. its earliest finish time and earliest start time for its successor activity B. its latest start time and earliest start time ... its successor activity D. its earliest finish time and latest start time for its successor activity

Last Answer : A. its earliest finish time and earliest start time for its successor activity

Description : A Project with a total funding of $100,000 finished with a BAC value of $95,000. What term  can BEST describe the difference of $5,000? A. Cost Variance B. Management Overhead C. Management Contingency Reserve D. Schedule Variance

Last Answer : C. Management Contingency Reserve