Relationship based on unrelated level of activity and past data of cost is measured with

help of

A. cost estimation

B. price estimation

C. unit estimation

D. production estimation

1 Answer

Answer :

A. cost estimation

Related questions

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : This activity is undertaken once the development activities start? A. Project Planning B. Project Monitoring and Control C. Project size estimation D. Project cost estimation

Last Answer : B. Project Monitoring and Control

Description : Which of the following activity is not the part of project planning? A. project estimation B. project scheduling C. project monitoring D. risk management

Last Answer : C. project monitoring

Description : In the stock-price beta estimation for the Coca-Cola Company, the dependent variable is the: A. return on Coca-Cola. B. price of Coca-Cola stock. C. return on the S&P 500. D. value of the S&P 500 Index.

Last Answer : A. return on Coca-Cola.

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above

Last Answer : D. all of the above

Description : Algorithmic cost estimation in different organisations may be different for the same application development, because a) Different organisations consider complexity factors differently b) Different organisations may use ... measurement of productivity may vary e) All of the above may be true.

Last Answer : e) All of the above may be true.

Description : Which technique is applicable when other projects in the same analogy application domain have been completed? a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law

Last Answer : c) Estimation by analogy

Description : A is developed using historical cost information that relates  some metric to the project cost. a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law

Last Answer : a) Algorithmic cost modelling

Description : Which is the Estimation size should be known? a. Time estimation b. Effort estimation c. Cost estimation d. size estimation

Last Answer : b. Effort estimation

Description : _____ is the process of planning and controlling the development of a system within a  specified time frame at a minimum cost with the right functionality.  a. Project management  b. Symantic timeline  c. Task identification  d. Time estimation  e. Work plan

Last Answer : a. Project management

Description : A program is a group of (A) related projects (B) unrelated projects (C) A and B (D) A or B

Last Answer : (A) related projects

Description : A program is usually a group of (A) plans (B) people and work (C) related projects (D) unrelated projects

Last Answer : (C) related projects

Description : . An independent relationship must exist between the attribute that can be measured and the external quality attribute. a) True b) False

Last Answer : b) False

Description : An independent relationship must exist between the attribute that can be measured and the external  quality attribute. a) True b) False

Last Answer : b) False

Description : An independent relationship must exist between the attribute that can be  measured and the external quality attribute. (A) True (B)False

Last Answer : (B)False

Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above

Last Answer : B. only i & ii

Description : Heuristics estimation technique depends on A. educated guess B. prior experience C. Common sense D. All of the above

Last Answer : D. All of the above

Description : Which of the following serves as project estimation technique? A. Empirical estimation B. Heuristic technique C. Analytical estimation D. All of the above

Last Answer : D. All of the above

Description : Which of the following serves as metrics for project size estimation? A. Lines of codes B. function point C. Number of persons D. Only A & B

Last Answer : D. Only A & B

Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).

Last Answer : d) operands and operators

Description : Which stage of project management life cycle requires the maximum time of  completion  A.Conceptualization  B.Planning  C.Execution  D.Estimation

Last Answer : C.Execution

Description : The process of assigning values for the time and effort needed to perform a system  project is called _____.  a. analysis  b. estimation  c. identifying  d. planning

Last Answer : b. estimation

Description : A Unit Price (UP) contract provides: 1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the  contract progresses  2. a reimbursement of allowable cost of services ... unit rates and the  final price is dependent on the quantities needed to carry out the work.

Last Answer : 4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the  final price is dependent on the quantities needed to carry out the work

Description : 3. S produces and sells one product, P, for which the data are as follows: Selling price Rs 28 Variable cost Rs 16 Fixed cost Rs 4 The fixed costs are based on a budgeted production and sales level of 25 ... period(a) 10.1% decrease (b) 11.2% decrease (c) 13.3% decrease (d) 16.0% decrease

Last Answer : (a) 10.1% decrease

Description : Cost budgeting can be best described by which of the following? 1. The process of developing the future trends along with the assessment of probabilities,  uncertainties, and inflation that  could ... of gathering, accumulating, analyzing, reporting, and managing the costs on an on- going basis

Last Answer : 3. The process of establishing budgets, standards, and a monitoring system by which the  investment cost of the project can be measured and managed

Description : The main purpose of the Project Management Plan is to: a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk of  alternative options. b. ensure ... the  project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for managing the  project.

Description : The project schedule is used to determine all of the following except which one?  A. Cost estimates B. Activity start dates C. Float times D. Activity end dates

Last Answer : A. Cost estimates

Description : The main purpose of the Project Management Plan is to:  a. provide justification for undertaking the project in terms of evaluating the benefit, cost and risk  of alternative options.  b ... managing the project. d. document the outcome of the risk, change and configuration management processes.

Last Answer : c. document the outcomes of the planning process and provide the reference document for  managing the project.

Description : Which of the following will improve a company's working capital management position? A. An increased level of bad debts B. An increase in the credit period allowed by suppliers C. An increased debtor ... D. An increase in the stock turnover period E. An increase in the length of the production

Last Answer : B. An increase in the credit period allowed by suppliers

Description : Software safety is a ................... activity that focuses on the identification and assessment of potential hazards that may affect software negatively and cause an entire ... monitoring and management (B) Software quality assurance (C) Software cost estimation (D) Defect removal efficiency

Last Answer : (B) Software quality assurance

Description : Which of the following best defines price discrimination? a. charging different prices on the basis of race b. charging different prices for goods with different costs of production c. charging ... a certain product of given quality and cost per unit at different prices to different buyers

Last Answer : d. selling a certain product of given quality and cost per unit at different prices to different buyers

Description : A substance unrelated to substrate but capable of reversibly changing activity of enzyme by binding to a site other than active site is called (a) Competitive inhibitor (b) Non-competitive inhibitor (c) Catalytic inhibitor (d) Allosteric modulator/inhibitor

Last Answer : Ans. ((d))

Description : During the planning development process, at times it is necessary to make certain assumptions to enhance the project plan when the data is not available. In regard to making those assumptions, ... upon historical data used for the project.  4. Senior management predefines the budget constraints.

Last Answer : 1. The assumptions will be considered as true, real, or certain.

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Which of the following costs would be considered a fixed cost? A. Raw materials. B. Depreciation. C. Bad-debt losses. D. Production labor.

Last Answer : B. Depreciation.

Description : When a record is made of an actual measured quality characteristic, such as a dimension  expressed with thousands of an inch, the quality is said to be expressed by: 1. traits  2. variables  3. attributes  4. properties

Last Answer : 2. variables

Description : Measured quality of a manufactured product is : 1. Always constant  2. Continually decreasing  3. Subject to a certain amount of variation  4. Continually increasing

Last Answer : 3. Subject to a certain amount of variation

Description : Total risk for common stocks is: A. the sum of systematic risk and diversifiable risk. B. measured by beta. C. the sum of market risk and systematic risk. D. the sum of diversifiable risk and unsystematic risk

Last Answer : A. the sum of systematic risk and diversifiable risk.

Description : Which one of the following statements best defines an estimate? a. An approximation of project time and cost targets, refined throughout the project life cycle. b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life cycle.

Description : Which of the following is true regarding NPV?  A. NPV assumes reinvestment at the cost of capital. B. NPV decisions should be made based on the highest value for all the selections.  C. NPV assumes reinvestment at the prevailing rate.  D. NPV assumes reinvestment at the NPV rate.

Last Answer : A. NPV assumes reinvestment at the cost of capital.

Description : Which one of the following statements best defines an estimate?  a. An approximation of project time and cost targets, refined throughout the project life  cycle.  b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms.

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life  cycle.

Description : Normally a performance bond, depending upon the state, only stipulates that the contractor will guarantee the work for a certain period of time.  Answer: D  (8)Which contract type places the most risk on ... fee  3. Cost plus fixed fee  4. Fixed price plus incentive fee  5. Firm fixed price

Last Answer : 5. Firm fixed price

Description : )The fixed price contract is advantageous to the buyer because it: 1. requires extremely well defined specifications  2. requires formal procedures for scope changes  3. contractor assumes financial and technical risk  4. has a known cost

Last Answer : 3. contractor assumes financial and technical risk

Description : )A new project was initiated that involves new technology and subsequently has never been  done before. What type of contract would to owner want to issue to reduce or eliminate as much  risk as possible. 1. Firm ... 2. Cost plus fix fee  3. Cost plus incentive fee  4. Lump sum  5. A and D

Last Answer : 5. A and D

Description : Which of the following type of contracts is most preferable to the contractor doing the project  work? 1. Cost plus fixed fee  2. Fixed price  3. Fixed price plus incentive free 4. B and C

Last Answer : 1. Cost plus fixed fee

Description : Feasibility study determines -----------------  A.Whether the project is possible with resources  B.Comparing the project with world class manufacturing norms C.Calculate the cost crashing each unit  D.Add duration to each unit

Last Answer : A.Whether the project is possible with resources

Description : On a project the project manager should strive for a "Quality Level" that : 1. is the highest level possible  2. is as close to the project objectives as possible  3. represents the least cost to the project.  4. Exceeds the specified requirements of the project.

Last Answer : 2. is as close to the project objectives as possible

Description : Which of the following factors does not need to be considered when formulating  policies on the level and financing of working capital? A. The attitude to risk of a company's managers B. ... C. The availability of revenue reserves and capital reserves D. Terms of trade offered by competitors

Last Answer : C. The availability of revenue reserves and capital reserves

Description : The cost impact of a risk event occurring as a project proceeds through its life cycle tends to A. Slowly rise B. Slowly drop C. Drop sharply and then level out D. Rise sharply and then level out

Last Answer : A. Slowly rise