What Is Unit Testing?

1 Answer

Answer :

Unit testing, also called Component testing is performed by programmers to test that a specified unit of the program meets the expected output when a particular input is provided. Here, the programmer has to know the internal logic and code of the system. It is a way of performing the White box testing. It involves checking that each feature specified in the “Component Design” is implemented in the components. A Unit in unit testing means a module self contained and by itself.

Related questions

Description : In the maintenance phase the product must be tested against  previous test cases. This is known as testing. (a) Unit (b) Integration (c)Regression (d) Module (e) Beta

Last Answer : (c)Regression

Description : The final form of testing COTS is........................testing. a) Unit (b) Integration (c) Alpha (d) Module (e) Beta.

Last Answer : (e) Beta.

Description : What's The Difference Between Unit Testing, Assembly Testing And Regression Testing?

Last Answer :  Unit testing ensures that the program unit meets the requirements which are reliable. Unit testing is normally conducted by the programmer who is supervised by the team lead. Testing the individual unit ... . The testers will run all the scripts in order to ensure that nothing has been affected.

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Differentiate Between Sitp And Utp In Testing?

Last Answer :  SITP - System Integration Test Plan - This test is performed in an integrated mode usually by the testing team.  UTP - Unit Test Plan - This test plan is performed at the smallest level or in a standalone mode. It is usually performed by the developers.

Description : What Is V Model In Testing?

Last Answer : The mapping of the type of testing to the stage of development in a given project is done by V model. In this model of testing there is a testing stage for every development stage which means a mapping between the development and a testing.

Description : What Is Difference Between Sitp And Utp In Testing?

Last Answer :  A test plan that is done at the smallest level or stand alone mode is known as Unit Test Plan. For example, a project is having customer and invoicing modules. So the test on ... normally done by developers and the system testing is normally done by testing professionals in an integrated mode.

Description : What Do You Mean By V-model In Testing?

Last Answer : V-model performs a mapping between the type of test and the stage in project development i.e which test is to be performed at which stage. This has 4 levels of testing the system: 1. ... independent tester. 3. System Testing- performed by system team. 4. Acceptance testing-performed by the client.

Description : What Is Acceptance Testing?

Last Answer : Acceptance Testing is performed by the client to see if the system delivers what was requested. It looks similar to system testing but the difference is in the focus. Here, the testing is done by Client ... point of view as he is the one who knows the whole process and requirements of his business.

Description : What Is System Testing?

Last Answer : System testing is done to see if the system delivers the required features, functional and nonfunctional requirements & outputs. It doesn't check each component individually but the whole system is ... Testing.  Volume Testing.  Stress Testing.  Documentation Testing.  Robustness Testing.

Description : What Is Regression Testing?

Last Answer : Regression testing is performed to see if the system would work well in case of any enhancements or changes in future. Here, all the scripts are run together to see that others are not affected by a change in one module.

Description : What Is Assembly Testing?

Last Answer : Assembly testing moves one step ahead of Unit testing. It checks if two or more modules are able to communicate and produce expected results or not. No Unit in the system can perform stand alone activities ... result. Assembly testing is a way of Black box testing and can be done through the UI.

Description : What Is Black Box Testing And White Box Testing?

Last Answer : Black box testing is an external perspective of the object that is to be tested to obtain test cases. These tests may be functional or non functional. The valid and invalid inputs are tested ... chosen by the tester to exercise paths through the code to determine the outputs that are appropriate.

Description : What Is White Box Testing?

Last Answer : White box testing is done to test the accuracy of logic and code of the program. It is done by programmers who know the logical flow of the system. It can be done by testing the classes or components in isolation. One of the ways of doing it is Unit Testing.

Description : What Is Black Box Testing?

Last Answer : Black box testing or functional testing means testing the software for the outputs when specified inputs are provided. It is usually performed to see if the software meets the user's requirements. There's ... . An example of this could be manual testing of the system by a tester, assembly testing.

Description : What Is Difference Utp In Testing ?

Last Answer : UTP (Unit Test Plan) are done at smallest unit level or stand alone mode. UTP can be done using NUNIT. Unit testing is done normally by developers.

Description : Who orchestrate the completion of the project by inducting the right people at the  right time to address the right issue and make the right decisions?  A.Project Coordinator  B.Project Manager  C.Operations Manager  D.Strategic Business Unit Head

Last Answer : B.Project Manager

Description : Feasibility study determines -----------------  A.Whether the project is possible with resources  B.Comparing the project with world class manufacturing norms C.Calculate the cost crashing each unit  D.Add duration to each unit

Last Answer : A.Whether the project is possible with resources

Description : A Unit Price (UP) contract provides: 1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the  contract progresses  2. a reimbursement of allowable cost of services ... unit rates and the  final price is dependent on the quantities needed to carry out the work.

Last Answer : 4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the  final price is dependent on the quantities needed to carry out the work

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : Relationship based on unrelated level of activity and past data of cost is measured with help of A. cost estimation B. price estimation C. unit estimation D. production estimation

Last Answer : A. cost estimation

Description : In which of the following systems, few rules over all

Last Answer : Oligarchy

Description : Herodatus is considered as

Last Answer : Father of History

Description : Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job. (A) Algorithmic model (B) Expert judgment (C) Bottom-up (D) Top down

Last Answer : (C) Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : The entire process of a project may be considered to be made up on number of sub process placed in different stage called the (A) Technical key resources (B) Work key structure (C) Work Breakdown Structure (WBS). (D) None of the above

Last Answer : (C) Work Breakdown Structure (WBS).

Description : In the initial stage of the project the probability of completing the project is ___ . (A) Zero (B) High (C) Low (D) Any of the above

Last Answer : (C) Low

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : Resorce requirement in project becomes constant while the project is in its _____ progress stage. (A) 40 to 55% (B) 55 to 70% (C) 70 to 80% (D) 80 to 95%

Last Answer : (D) 80 to 95%

Description : Five dimensions that must be managed on a project (A) Constraint, Quality, Cost, Schedule, Staff (B) Features, Quality, Cost, Schedule, Staff (C) Features, priority, Cost, Schedule, Staff (D) Features, Quality, Cost, Schedule, customer

Last Answer : (B) Features, Quality, Cost, Schedule, Staff

Description : Project performance consists of (A) Time (B) Cost (C) Quality (D) All of the above

Last Answer : (C) Quality

Description : Design phase consist of (A) Input received (B) Output received (C) Both (A) and (B) (D) None of the above

Last Answer : (C) Both (A) and (B)

Description : Following is(are) the responsibility(ies) of the project manager. (A) Budgeting and cost control (B) Allocating resources (C) Tracking project expenditure

Last Answer : (C) Tracking project expenditure

Description : The project life cycle consists of (A) Understanding the scope of the project (B) Objectives of the project (C) Formulation and planning various activities (D) All of the above

Last Answer : (D) All of the above

Description : Developing a technology is an example of (A) Process (B) Project (C) Scope (D) All of the above

Last Answer : (B) Project

Description : Resources refers to (A) Manpower (B) Machinery (C) Materials (D) All of the above

Last Answer : (D) All of the above

Description : A ____ is a set of activities which are networked in an order and aimed towards achieving the goals of a project. (A) Project (B) Process (C) Project management (D) Project cycle

Last Answer : (A) Project

Description : Which structure shows the reporting relationships and communications channels for a project? a. Work Breakdown Structure. b. Organizational Breakdown Structure. c. Product Breakdown Structure. d. Responsibility assignment structure.

Last Answer : b. Organizational Breakdown Structure.

Description : Which one of the following best describes project management? a. Using APM's Body of Knowledge 6th edition as a guide to all projects. b. Employing a project manager who has undertaken similar ... on a project full time. d. Application of processes and methods throughout the project life cycle.

Last Answer : d. Application of processes and methods throughout the project life cycle.

Description :  A portfolio can best be defined as: a. a group of projects and programs carried out within an organization. b. a group of programs carried out under the sponsorship of an organization. c ... the sponsorship of an organization. d. a range of products and services offered by an organization.

Last Answer : a. a group of projects and programs carried out within an organization.