System testing is done to see if the system delivers the required features, functional and nonfunctional requirements & outputs. It doesn’t check each component individually but the whole system is checked as one entity. It is done at developers end. The testing for nonfunctional requirements includes:
 Performance Testing.
 Volume Testing.
 Stress Testing.
 Documentation Testing.
 Robustness Testing.

Related questions

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : In the maintenance phase the product must be tested against  previous test cases. This is known as testing. (a) Unit (b) Integration (c)Regression (d) Module (e) Beta

Last Answer : (c)Regression

Description : The final form of testing COTS is........................testing. a) Unit (b) Integration (c) Alpha (d) Module (e) Beta.

Last Answer : (e) Beta.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Differentiate Between Sitp And Utp In Testing?

Last Answer :  SITP - System Integration Test Plan - This test is performed in an integrated mode usually by the testing team.  UTP - Unit Test Plan - This test plan is performed at the smallest level or in a standalone mode. It is usually performed by the developers.

Description : What Is V Model In Testing?

Last Answer : The mapping of the type of testing to the stage of development in a given project is done by V model. In this model of testing there is a testing stage for every development stage which means a mapping between the development and a testing.

Description : What's The Difference Between Unit Testing, Assembly Testing And Regression Testing?

Last Answer :  Unit testing ensures that the program unit meets the requirements which are reliable. Unit testing is normally conducted by the programmer who is supervised by the team lead. Testing the individual unit ... . The testers will run all the scripts in order to ensure that nothing has been affected.

Description : What Is Difference Between Sitp And Utp In Testing?

Last Answer :  A test plan that is done at the smallest level or stand alone mode is known as Unit Test Plan. For example, a project is having customer and invoicing modules. So the test on ... normally done by developers and the system testing is normally done by testing professionals in an integrated mode.

Description : What Do You Mean By V-model In Testing?

Last Answer : V-model performs a mapping between the type of test and the stage in project development i.e which test is to be performed at which stage. This has 4 levels of testing the system: 1. ... independent tester. 3. System Testing- performed by system team. 4. Acceptance testing-performed by the client.

Description : What Is Acceptance Testing?

Last Answer : Acceptance Testing is performed by the client to see if the system delivers what was requested. It looks similar to system testing but the difference is in the focus. Here, the testing is done by Client ... point of view as he is the one who knows the whole process and requirements of his business.

Description : What Is Regression Testing?

Last Answer : Regression testing is performed to see if the system would work well in case of any enhancements or changes in future. Here, all the scripts are run together to see that others are not affected by a change in one module.

Description : What Is Assembly Testing?

Last Answer : Assembly testing moves one step ahead of Unit testing. It checks if two or more modules are able to communicate and produce expected results or not. No Unit in the system can perform stand alone activities ... result. Assembly testing is a way of Black box testing and can be done through the UI.

Description : What Is Unit Testing?

Last Answer : Unit testing, also called Component testing is performed by programmers to test that a specified unit of the program meets the expected output when a particular input is provided. Here, the programmer has ... in the components. A Unit in unit testing means a module self contained and by itself.

Description : What Is Black Box Testing And White Box Testing?

Last Answer : Black box testing is an external perspective of the object that is to be tested to obtain test cases. These tests may be functional or non functional. The valid and invalid inputs are tested ... chosen by the tester to exercise paths through the code to determine the outputs that are appropriate.

Description : What Is White Box Testing?

Last Answer : White box testing is done to test the accuracy of logic and code of the program. It is done by programmers who know the logical flow of the system. It can be done by testing the classes or components in isolation. One of the ways of doing it is Unit Testing.

Description : What Is Black Box Testing?

Last Answer : Black box testing or functional testing means testing the software for the outputs when specified inputs are provided. It is usually performed to see if the software meets the user's requirements. There's ... . An example of this could be manual testing of the system by a tester, assembly testing.

Description : What Is Difference Utp In Testing ?

Last Answer : UTP (Unit Test Plan) are done at smallest unit level or stand alone mode. UTP can be done using NUNIT. Unit testing is done normally by developers.

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Which of the following is incorrect activity for the configuration management of a software system? a) Internship management b) Change management c) Version management d) System management

Last Answer : a) Internship management

Description : Which of the following is a quality management system that gives titles to specialists and requires a cost-benefit analysis? Select one: a. Lean accounting b. Business process re-engineering c. Kaizen d. Six Sigma e. Total Quality Management

Last Answer : d. Six Sigma

Description : The system of monitoring and control is more effective when, along with the time- frame, there is the linkage between the physical work to be performed in each activity and  the financial expenditure to be incurred. (True/False)

Last Answer : Ans. True

Description : An example of the risk involved in development is a) Key personnel may resign before the product is complete b) The manufacturer of critical components (e.g. the hardware  associated with a ... a fully functional lower-cost  equivalent package e) All of these are risks involved in development.

Last Answer : e) All of these are risks involved in development.

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : Following is (are) the tool(s) for changing a process (A)Change Management System (CMS) (B)Configuration Management (CM) (C)Both (A) and (B) (D)None of the above

Last Answer : (C)Both (A) and (B)

Description : What involves preparing for external release and keeping track of the system versions that have been released for customer use? a) System building b) Release management c) Change management d) Version management

Last Answer : b) Release management

Description : Which of the following is the process of assembling program  components, data, and libraries, and then compiling and linking these to  create an executable system? a) System building b) Release management c) Change management d) Version management

Last Answer : a) System building

Description : Which phase of the RUP is used to establish a business case for the  system? a) Transition b) Elaboration c) Construction d) Inception

Last Answer : d) Inception

Description : Which of the following is incorrect activity for the configuration management of a system? (A)Internship management (B) Change management (C) Version management (D) System management

Last Answer : (A)Internship management

Description : The evolutionary Work Breakdown Structure approach is very useful when the  requirements of the system are not well understood.

Last Answer : Ans: True

Description : The traditional Work Breakdown Structure approach is very useful when the  requirements of the system are not well understood.

Last Answer : Ans: False

Description : Lower CASE tools are used to create integrated diagrams of the system and store  information about system components during the analysis phase.

Last Answer : Ans: False

Description : Upper CASE tools are used to create diagrams and generate code for database tables  system functionality during the design phase.

Last Answer : Ans: False

Description :  The project team has just determined that the deadline for completion will not be met.  In order to deliver a high quality system on schedule, the team has requested that the  features be ... that a fixed deadline be imposed for the project. This technique  is referred to as SDLC methodology.

Last Answer : Ans: False

Description : Scope creep is only a minor factor in projects running over schedule, and every effort  should be made to incorporate any changes into the present system if they would truly be  beneficial.

Last Answer : Ans: False

Description : Timeboxing is a popular technique which sets a fixed deadline for a project and  delivers the system by that deadline no matter what, even if functionality needs to be  reduced.

Last Answer : Ans: True

Description : Using the shortcut method to determine the complexity of a systems project, a very  complex system having 300 unadjusted function points would have 405 adjust function  points.

Last Answer : Ans: True

Description : Project management is the process of planning and controlling the development of a  system within a specified time frame at a minimum cost with the right functionality.  Ans: True

Last Answer : Ans: True

Description : Traditional Work Breakdown Structures tend to  a. focus on the design of the system as oppose to the needs of the current phase and  iteration  b. force too many levels of detail early on for large ... project and difficult to compare across projects  d. all of the above  e. none of the above

Last Answer : d. all of the above

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : . A normal system with 400 unadjusted function points would have _____ adjusted  function points when the shortcut method is use to determine the complexity of the  project.

Last Answer : c. 400

Description : Kathryn has little experience estimating the time it will take to complete a systems  project. She has just completed the planning phase of the project. What method should she use to estimate the ... b. function points  c. industry standards  d. Microsoft Project  e. more complex approach

Last Answer : c. industry standards