What Is V Model In Testing?

1 Answer

Answer :

The mapping of the type of testing to the stage of development in a given project is done by V model. In this model of testing there is a testing stage for every development stage which means a mapping between the development and a testing.

Related questions

Description : What Do You Mean By V-model In Testing?

Last Answer : V-model performs a mapping between the type of test and the stage in project development i.e which test is to be performed at which stage. This has 4 levels of testing the system: 1. ... independent tester. 3. System Testing- performed by system team. 4. Acceptance testing-performed by the client.

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : What Is V-model ?

Last Answer : The V-model is a software development process which can be presumed to be the extension of the waterfall model. Instead of moving down in a linear way, the process steps are bent ... demonstrates the relationships between each phase of the development life cycle and its associated phase of testing.

Description : Following are the phases of Project Management Life Cycle. Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (A) 3-2-1-4

Description : . In project management, the term quality is best defined as: a. inspection, testing and measurement. b. reviews and audits. c. fitness for purpose of deliverables. d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : In the maintenance phase the product must be tested against  previous test cases. This is known as testing. (a) Unit (b) Integration (c)Regression (d) Module (e) Beta

Last Answer : (c)Regression

Description : The final form of testing COTS is........................testing. a) Unit (b) Integration (c) Alpha (d) Module (e) Beta.

Last Answer : (e) Beta.

Description : Which of the following is not considered as a risk in project management? a) Specification delays b) Product competition c) Testing d) Staff turnover

Last Answer : c) Testing

Description : Following are the phases of Project Management Life Cycle.  Arrange them in correct order 1. Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery  (A) 3-2-1-4 (B) 1-2-3-4 (C) 2-3-1-4 (D) 4-3-2-1

Last Answer : (D) 4-3-2-1

Description : Which of the following is not considered as a risk in project management? a. Specification delays b. Product competition c. Testing d. Staff turnover

Last Answer : c. Testing

Description : In project management, the term quality is best defined as:  a. inspection, testing and measurement.  b. reviews and audits.  c. fitness for purpose of deliverables.  d. professionally-bound project reports.

Last Answer : c. fitness for purpose of deliverables.

Description : Differentiate Between Sitp And Utp In Testing?

Last Answer :  SITP - System Integration Test Plan - This test is performed in an integrated mode usually by the testing team.  UTP - Unit Test Plan - This test plan is performed at the smallest level or in a standalone mode. It is usually performed by the developers.

Description : What's The Difference Between Unit Testing, Assembly Testing And Regression Testing?

Last Answer :  Unit testing ensures that the program unit meets the requirements which are reliable. Unit testing is normally conducted by the programmer who is supervised by the team lead. Testing the individual unit ... . The testers will run all the scripts in order to ensure that nothing has been affected.

Description : What Is Difference Between Sitp And Utp In Testing?

Last Answer :  A test plan that is done at the smallest level or stand alone mode is known as Unit Test Plan. For example, a project is having customer and invoicing modules. So the test on ... normally done by developers and the system testing is normally done by testing professionals in an integrated mode.

Description : What Is Acceptance Testing?

Last Answer : Acceptance Testing is performed by the client to see if the system delivers what was requested. It looks similar to system testing but the difference is in the focus. Here, the testing is done by Client ... point of view as he is the one who knows the whole process and requirements of his business.

Description : What Is System Testing?

Last Answer : System testing is done to see if the system delivers the required features, functional and nonfunctional requirements & outputs. It doesn't check each component individually but the whole system is ... Testing.  Volume Testing.  Stress Testing.  Documentation Testing.  Robustness Testing.

Description : What Is Regression Testing?

Last Answer : Regression testing is performed to see if the system would work well in case of any enhancements or changes in future. Here, all the scripts are run together to see that others are not affected by a change in one module.

Description : What Is Assembly Testing?

Last Answer : Assembly testing moves one step ahead of Unit testing. It checks if two or more modules are able to communicate and produce expected results or not. No Unit in the system can perform stand alone activities ... result. Assembly testing is a way of Black box testing and can be done through the UI.

Description : What Is Unit Testing?

Last Answer : Unit testing, also called Component testing is performed by programmers to test that a specified unit of the program meets the expected output when a particular input is provided. Here, the programmer has ... in the components. A Unit in unit testing means a module self contained and by itself.

Description : What Is Black Box Testing And White Box Testing?

Last Answer : Black box testing is an external perspective of the object that is to be tested to obtain test cases. These tests may be functional or non functional. The valid and invalid inputs are tested ... chosen by the tester to exercise paths through the code to determine the outputs that are appropriate.

Description : What Is White Box Testing?

Last Answer : White box testing is done to test the accuracy of logic and code of the program. It is done by programmers who know the logical flow of the system. It can be done by testing the classes or components in isolation. One of the ways of doing it is Unit Testing.

Description : What Is Black Box Testing?

Last Answer : Black box testing or functional testing means testing the software for the outputs when specified inputs are provided. It is usually performed to see if the software meets the user's requirements. There's ... . An example of this could be manual testing of the system by a tester, assembly testing.

Description : What Is Difference Utp In Testing ?

Last Answer : UTP (Unit Test Plan) are done at smallest unit level or stand alone mode. UTP can be done using NUNIT. Unit testing is done normally by developers.

Description : In practice, which Life Cycle model may have more, fewer or different levels of development and testing, depending on the project and the software product. For example, there may be component integration testing ... after system testing. A. Water Fall Model B.V-Model C. Spiral Model D. RAD Model

Last Answer : B.V-Model

Description : V- model uses -------- test models a) Component testing, integration testing, system testing and acceptance testing b) alpha testing, beta testing , acceptance testing and user testing c) black box testing, white box testing and gray box testing

Last Answer : a

Description : Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job. (A) Algorithmic model (B) Expert judgment (C) Bottom-up (D) Top down

Last Answer : (C) Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : The advantage of following the IEEE Standard for drawing up a Project Management Plan (SPMP) - see IEEE Standard 1059.1 1987 - is a) It is drawn up by representatives from major  ... each organisation for a  particular applicationarea, development team or  technique. e) All of the above.

Last Answer : e) All of the above.

Description : Which of the following items should not be included in the  project management plan? a) The techniques and case tools to be used b) Detailed schedules, budgets and resource ... development  organisation, project responsibilities, managerial  objectives and priorities e) None of the above.

Last Answer : c) The life cycle model to be used

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description : The RUP is normally described from three perspectives- dynamic, static& practice. What does static perspective do? a) It shows the process activities that are enacted. b) It suggests good practices to be used during the process. c) It shows the phases of the model over time.

Last Answer : a) It shows the process activities that are enacted.

Description : Each component of the product is separately estimated and the results aggregated to produce an estimate for the overall job. (A)Algorithmic model (B)Expert judgment (C)Bottom-up (D)Top down

Last Answer : (C)Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy

Description : Constantine suggests four “organizational paradigms” for  engineering teams. The best project team organizational model to use when handling extremely complex problems is  a. Random paradigm b. Open paradigm c. Synchronous paradigm d. Closed paradigm

Last Answer : a. Random paradigm

Description : The hurricane model implies that project estimates become more accurate as the  project's product becomes better understood.

Last Answer : Ans: True

Description :  The COCOMO model to convert lines of code estimates into person-month estimates  was designed by Allen Albrecht of IBM.

Last Answer : Ans: False

Description : Which method is not included in seven Project Selection Methods?  A. Financial Analysis B. Strategic Alignment C. Weighted Scoring Model D. Straight line Model (Ans.)

Last Answer : D. Straight line Model (Ans.)

Description : Bird in hand’ argument is given by A. Walter’s Model B. Gordon’s Model C. MM Model D. Residual’s

Last Answer : B. Gordon’s Model