A Unit Price (UP) contract provides:

1. a reimbursement of allowable costs plus a fixed fee which is paid proportionately as the 

contract progresses 

2. a reimbursement of allowable cost of services performed plus an agreed upon percentage of the

estimated cost as profit

3. the supplier with a fixed price for delivered performance plus a predetermined fee for superior 

performance 

4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the 

final price is dependent on the quantities needed to carry out the work.

1 Answer

Answer :

4. a fixed price where the supplier agrees to furnish goods and services at unit rates and the 

final price is dependent on the quantities needed to carry out the work

Related questions

Description : Normally a performance bond, depending upon the state, only stipulates that the contractor will guarantee the work for a certain period of time.  Answer: D  (8)Which contract type places the most risk on ... fee  3. Cost plus fixed fee  4. Fixed price plus incentive fee  5. Firm fixed price

Last Answer : 5. Firm fixed price

Description : The contractor provides the financing and is paid an agreed fraction of actual savings  achieved. This payment is used to pay down the debt costs of equipment and/or services.  ... contract b) extended technical guarantee/service c) performance Contract d) shared savings performance contrac

Last Answer : d) shared savings performance contrac

Description : Under this method of billing a client, the external auditors charges on the basis of time spent by principals/partners, supervisors, seniors and juniors at predetermined rates agreed upon with the client a. Maximum fee basis b. Flat sum basis c. Retainer basis d. Per diem basis

Last Answer : Per diem basis

Description : )A new project was initiated that involves new technology and subsequently has never been  done before. What type of contract would to owner want to issue to reduce or eliminate as much  risk as possible. 1. Firm ... 2. Cost plus fix fee  3. Cost plus incentive fee  4. Lump sum  5. A and D

Last Answer : 5. A and D

Description : Sam Consultancy is planning to buy ten desktops for $1500 each from a leading computer store. Which type of contract will get signed in this case? A. Purchase Order B. Cost plus Fee C. Fixed cost D. Time and Material

Last Answer : A. Purchase Order

Description : .Sam Consultancy is planning to buy ten desktops for $1500 each from a leading computer  store. Which type of contract will get signed in this case? A. Purchase Order B. Cost plus Fee C. Fixed cost D. Time and Material

Last Answer : A. Purchase Order

Description : )In a program or project plan, there are always revisions to account for new or missing data.  Which one of the following provides the best reason for performing a revision of the plan? 1. ... 4. Historical data on a similar project suggests that risk events are not included in the current  plan.

Last Answer : 2. Project tasks are crashed to meet their end dates

Description : Which of the following type of contracts is most preferable to the contractor doing the project  work? 1. Cost plus fixed fee  2. Fixed price  3. Fixed price plus incentive free 4. B and C

Last Answer : 1. Cost plus fixed fee

Description : Complete the following statement. As the project progresses into the  execution phase: Select one: a. risks need to be checked off on activities that have been performed. b. the total risk on ... risk breakdown structure needs to be examined to be sure all the risk events have  been avoided.

Last Answer : a. risks need to be checked off on activities that have been performed.

Description : Which of the following statements concerning analog and digital devices are correct? A. The variables in digital systems are fixed quantities, and the variables in analog systems are continuous ... accuracy compared to digital devices. D. Operations in a digital device are performed simultaneously.

Last Answer : Answer: A

Description : Considers the total cost of ownership, or development plus support costs, for a project. A. Learning Curve Theory B. Life Cycle Costing C. Parametric Modeling D. Rate of Performance

Last Answer : B. Life Cycle Costing

Description : The CPA should not undertake an engagement if his fee is to be based upon a. A percentage of audited net income. b. Per diem rates plus expenses. c. The findings of a tax authority. d. The complexity of the service rendered

Last Answer : A percentage of audited net income

Description : If an intermediary wants to carry Tide detergent and Procter & Gamble agrees only if the supplier purchases P&G's entire line of detergents as well, the company is engaging in which of the ... A)Exclusive dealing B)Dual distribution C)Tying agreement D)Refusal to deal E)Restricted sales territories

Last Answer : C)Tying agreement

Description : Which of the following is true of the report based on agreed-upon-procedures? a. The report is restricted to those parties who have agreed to the procedures to be performed. b. The CPA ... . d. The report should state that the procedures performed are limited to analytical procedures and inquiry

Last Answer : The report is restricted to those parties who have agreed to the procedures to be performed

Description : )The fixed price contract is advantageous to the buyer because it: 1. requires extremely well defined specifications  2. requires formal procedures for scope changes  3. contractor assumes financial and technical risk  4. has a known cost

Last Answer : 3. contractor assumes financial and technical risk

Description : The goods identified and agreed upon at the time a contract of sale is made are called A. Ordinary goods B. Specified goods C. Scheduled goods D. None of above

Last Answer : B. Specified goods

Description : After inviting tenders for supply of raw materials, two quotations are received as follows- Supplier P Rs. 2.20 per unit, Supplier Q Rs. 2.10 per unit plus Rs. 2,000 fixed charges irrespective of the units ordered. The ... (a) 22,000 units (b) 20,000 units (c) 21,000 units (d) None of the above.

Last Answer : (b) 20,000 units

Description : In estimation of cost functions, variations in a single activity level represents the A. related total costs B. related fixed cost C. related variable cost D. related per unit cost

Last Answer : A. related total costs

Description : Which of the following is not project management goal? a) Keeping overall costs within budget b) Delivering the software to the customer at the agreed time c) Maintaining a happy and well-functioning development team

Last Answer : d) Avoiding customer complaints

Description : This set of Software Engineering Multiple Choice Questions & Answers (MCQs) focuses on Project  Management . 1. Which of the following is not project management goal? a) Keeping overall ... agreed time c) Maintaining a happy and well-functioning development team d) Avoiding customer complaints

Last Answer : d) Avoiding customer complaints

Description : Which of the following is not project management goal? a) Keeping overall costs within budget. b) Delivering to the customer at the agreed time. c) Maintaining a happy and well-functioning development team. d) Avoiding costumer complaints.

Last Answer : d) Avoiding costumer complaints.

Description :  A project with total budget cost of 30 crores is scheduled to be completed in 80 weeks. A periodic review was carried out at end of 60 weeks and results are as given:  Budgeted cost of work performed (EV) = 17 ... crores What is the cost performance index?  A.0.895  B.0.81  C.0.90  D.1.12

Last Answer : A.0.895

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.  a. data communications, time tradeoffs, and ... programming language  d. reports printed and PCA  e. x-rays, extensibility, and operational conversion

Last Answer : b. end-user efficiency, data communications, and reusability

Description : The probability of completing the project can be estimated based upon the ____ . (A) Uniform distribution curve (B) Normal distribution curve. (C) U-shaped distribution curve (D) None of the above

Last Answer : (B) Normal distribution curve.

Description : The probability of completing the project can be estimated based  upon the . (A)Uniform distribution curve (B)Normal distribution curve. (C)U-shaped distribution curve (D)None of the above

Last Answer : (B)Normal distribution curve.

Description : The accuracy of an estimate should: a. decrease as a project progresses through its life cycle. b. increase as a project progresses through its life cycle. c. stay constant throughout the project life cycle. d. vary independently of where the project is in its life cycle.

Last Answer : b. increase as a project progresses through its life cycle.

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : The accuracy of an estimate should:  a. decrease as a project progresses through its life cycle.  b. increase as a project progresses through its life cycle.  c. stay constant throughout the project life cycle.  d. vary independently of where the project is in its life cycle.

Last Answer : b. increase as a project progresses through its life cycle.

Description : “Risk” is usually _______ as the project progresses. (A) increases (B) reduces (C) remains same (D) becomes negligible

Last Answer : (B) reduces

Description : A contractor wishes to determine a suitable combination of manual labour and machine work for the excavation of a multistory construction. For every cum of excavation, 3 man-hours are needed; or 0.2 machine-hour. Costs ... total cost will be (a) 1500 cum (b) 1800 cum (c) 2250 cum (d) 2500 cum

Last Answer : (d) 2500 cum

Description :  Which of the following processes are performed in the Closing process group and in  what order?  A. Contract Closure and then Close Project B. Scope Verification and then Close Project C. Contract Closure and then Scope Verification D. Close Project and then Contract Closure

Last Answer : A. Contract Closure and then Close Project

Description : A firm that bases its price on how it thinks the competitors will price, rather than on its own costs or demand, to win a contract is most likely using A. Going-rate pricing B. Cost-plus pricing C. Perceived-value pricing D. Sealed-bid pricing

Last Answer : C. Perceived-value pricing

Description : Which of the following project baselines provides the basis for measurement of  the expected cash flow against requirements over time and is often displayed as an  S curve? Select one: a. Schedule baseline b. Cost performance baseline c. Scope baseline d. Plan baseline e. Initiation baseline

Last Answer : b. Cost performance baseline

Description : Amount of work completed to date compared with planned in the Earned Value  Management method is  A. Schedule Performance Index  B. Cost Performance Index  C. Percentage Complete  D .Percentage Spent

Last Answer : C. Percentage Complete

Description : Which of the following costs would be considered a fixed cost? A. Raw materials. B. Depreciation. C. Bad-debt losses. D. Production labor.

Last Answer : B. Depreciation.

Description : Complaint means allegation in writing made by a complainant that a) An unfair trade practice or restrictive trade practice has been adapted by any  traders or service provider b) The goods bought by him ... the services mentioned in the complaint a price in excess of the price d) All the above

Last Answer : d) All the above

Description : Derivatives contract which gives the buyer/holder of the contract the right(but not the obligation) to buy/sell the underlying asset at a predetermined price within or at end of a specified period is ... B. Option Contract C. Index Futures contract D. Mini Derivative contract E. None of the Above

Last Answer : B. Option Contract Explanation: Options Contract is a type of Derivatives Contract which gives the buyer/holder of the contract the right (but not the obligation) to buy/sell the underlying asset at a predetermined price within or at end of a specified period.

Description : The king dies and two men, the true heir and an impostor, both claim to be his long-lost son. Both fit the description of the rightful heir: about the right age, height, coloring and general ... the one who re-fused is correctly identified as the rightful heir. Can you figure out why? -Riddles

Last Answer : The test was a blood test. The elder remembered that the true prince was a hemophiliac.

Description : Internal costs include a) Developers salaries b) Managers and support personnel salaries c) The cost of overheads such as utilities, rent and senior  managers d) Materials (such as manuals) and services such as travel e) All of the above.

Last Answer : a) Developers salaries

Description : )Quality costs include : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.  2. Only costs classified as prevention, detection and ... rework due to defects, customer returns and warranty costs.  4. The expense of upper management

Last Answer : 1. the total of all costs incurred to assure the production and delivery of acceptable products and services.

Description : Costs that are not directly related to the products or services of the project, but are indirectly related to performing the project. A. Intangible Costs B. Sunk Cost C. Tangible Costs D. Indirect Costs

Last Answer : D. Indirect Costs

Description : Adam's Pool Service charges £50 for swimming pool cleaning performed prior to May 15 and £75 for jobs performed after that date. This pricing structure provides the benefits to Adam's of: ... leaders. B)smoothing demand fluctuations. C)increasing service tangibility. D)tying prices to service costs.

Last Answer : B)smoothing demand fluctuations.

Description : 15) Adam's Pool Service charges £50 for swimming pool cleaning performed prior to May 15 and £75 for jobs performed after that date. This pricing structure provides the benefits to Adam's ... leaders. B)smoothing demand fluctuations. C)increasing service tangibility. D)tying prices to service costs.

Last Answer : B)smoothing demand fluctuations.

Description : The particular task performance in CPM is known  A.Dummy  B.Event  C.Activity  D.Contract.

Last Answer : C.Activity

Description : A performance bond should always provide what part of the contract value? 1. 10 percent  2. 25 percent  3. 50 percent  4. 100 percent

Last Answer : 4. 100 percent

Description : The contract administration function includes: 1. funding management  2. managing relationships and interfaces  3. performance control  4. all of the above

Last Answer : 4. all of the above

Description : The charges to be collected when a registred letter already delivered is presented with a revised address for registration. a) Cannot be registered b) Fresh postage and registration charges to be paid c) Postage alone to be collected d) Fresh registration fee is to be collected

Last Answer : d) Fresh registration fee is to be collected

Description : Which of the following represents the estimated value of the work actually  accomplished?  A. Earned value (EV)  B. Planned value (PV)  C. Actual cost (AC  D. Cost variance (CV)

Last Answer : A. Earned value (EV)