Description : An ordinary Portland cement when tested for its fineness, should not leave any residue on I.S. sieve No. 9, more than (A) 5 % (B) 10 % (C) 15 % (D) 20 %
Last Answer : (B) 10 %
Description : 1% of voids in a concrete mix would reduce its strength by about (A) 5 % (B) 10 % (C) 15 % (D) 20 %
Last Answer : (A) 5 %
Description : A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to (A) 10 % (B) 15 % (C) 20 % (D) 25 %
Last Answer : Answer: Option C
Description : The process of mixing, transporting, placing and compacting concrete using Ordinary Port land Cement should not take more than (A) 30 minutes (B) 40 minutes (C) 60 minutes (D) 90 minutes
Last Answer : Answer: Option A
Description : The process of mixing, transporting, placing and compacting the cement, concrete should not take more than. (a) 30 minutes (b) 60minutes (c) 90 minutes (d) 120mm
Last Answer : (a) 30 minutes
Description : The strength of concrete using air entraining cement gets reduced by (a) 5 to 10% (b) 10 to 15% (c) 15 to 20% (d) 20 to 25%
Last Answer : (b) 10 to 15%
Description : For maximum strength and durability minimum percentage of cement, by weight is (A) 15 % (B) 20 % (C) 25 % (D) 30 %
Last Answer : Answer: Option D
Description : The maximum thickness of concrete floor of a cement warehouse, is (A) 10 cm (B) 15 cm (C) 20 cm (D) 25 cm
Last Answer : (D) 25 cm
Description : The normal consistency of ordinary Portland cement is about (A) 10 % (B) 20 % (C) 30 % (D) 40 %
Description : Pick up the incorrect statement from the following. While performing preliminary test on concrete (A) Proportions of the material and water should be the same as to be used at the work site (B) ... in air-tight containers (D) Concrete ingredients should be kept at a temperature of 37° 2°C
Description : The concrete under water minimum grade of cement recommended by IS code a) M 10 b) M 15 c) M 20* d) M 25
Last Answer : c) M 20*
Description : High strength of concrete requires a water cement ratio of [ A ] 0.10 to 0.15 [ B ] 0.25 to 0.30 [ C ] 0.45 to 0.60 [ D ] 0.75 to 0.90
Last Answer : [ B ] 0.25 to 0.30
Description : Though agriculture contribute only 17.4 % to the country's gross value added for the year. 2016-17 A) 15.4% B) 17.4% C) 18.4% D) 20.4
Last Answer : 17.4%
Description : If 1500 g of water is required to have a cement paste 1875 g of normal consistency, the percentage of water is, (A) 20 % (B) 25 % (C) 30 % (D) 35 %
Last Answer : (B) 25 %
Description : In case of cement concrete pavements, pick up the incorrect statement (A) Tractive resistance is low (B) Initial cost of construction is high (C) Initial cost of construction is low (D) Visibility during nights is high
Description : The measurement is made in square metre in case of (A) Cement concrete in foundation (B) R.C.C. structure (C) Hollow concrete block wall (D) None of these
Last Answer : (D) None of these
Description : In working stress design, permissible bond stress in the case of deformed bars is more than that in plain bars by (A) 10 % (B) 20 % (C) 30 % (D) 40 %
Last Answer : (D) 40 %
Description : The weight of a pycnometer containing 400 g sand and water full to the top is 2150 g. The weight of pycnometer full of clean water is 1950 g. If specific gravity of the soil is 2.5, the water content is (A) 5 % (B) 10 % (C) 15 % (D) 20 %
Last Answer : (D) 20 %
Description : The individual variation between test strength of sample should not be more than (A) ±5 % of average (B) ± 10 % of average (C) ± 15 % of average (D) ±20 % of average
Description : A stone is rejected if it absorbs water more than (A) 5 % (B) 10 % (C) 15 % (D) 20
Last Answer : Answer: Option B
Description : A good building stone should not absorb water more than (A) 5 % (B) 10 % (C) 15 % (D) 20 %
Description : Maximum quantity of water needed per 50 kg of cement for M 15 grade of concrete is (A) 28 liters (B) 30 liters (C) 32 liters (D) 34 liters
Description : While designing a water supply of an industrial township, industrial and commercial water demand of total supply, is assumed (A) 10 % (B) 10 to 15 % (C) 15 to 20 % (D) 20 to 25 %
Last Answer : (D) 20 to 25 %
Description : By over-reinforcing a beam, the moment of resistance can be increased not more than (A) 10 % (B) 15 % (C) 20 % (D) 25 %
Description : The moisture content in a well seasoned timber is (A) 4 % to 6 % (B) 10 % to 12 % (C) 15 % to 20 % (D) 100 %
Description : A 1st class brick immersed in water for 24 hours, should not absorb water (by weight) more than (A) 10 % (B) 15 % (C) 20 % (D) 25 %
Description : The weight of a good quality brick when immersed in water for a period of 16 hours should not exceed the weight of dry brick (A) 20 % (B) 15 % (C) 10 % (D) None of these
Description : For testing compressive and tensile strength of cement, the cement mortar is made by mixing cement and standard sand in the proportions of (A) 1 : 2 (B) 1 : 3 (C) 1 : 4 (D) 1 : 6
Description : Pick up the correct statement from the following: (A) The weight of ingredients of concrete mix, is taken in kilograms (B) Water and aggregates are measured in litres (C) 20 bags of cement make one tonne (D) All the above
Description : Batching refers to (A) Controlling the total quantity at each batch (B) Weighing accurately, the quantity of each material for a job before mixing (C) Controlling the quantity of each material ... be added in each batch according to the moisture content of the materials being mixed in the batch
Last Answer : (C) Controlling the quantity of each material into each batch
Description : Pick up the correct statement from the following: (A) The free water is the amount of water added while mixing and the amount of water held on the surface of the aggregates prior to mixing (B) The total water ... actually absorbed by the aggregates (C) Neither (a) nor (b) (D) Both (a) and (b)
Description : The process of proper and accurate measurement of concrete ingredients for uniformity of proportion, is known (A) Grading (B) Curing (C) Mixing (D) Batching
Last Answer : (D) Batching
Description : The produce impermeable concrete (A) Thorough mixing of concrete is required (B) Proper compaction of concrete is required (C) Proper curing of concrete is required (D) All the above
Description : The impurity of mixing water which affects the setting time and strength of concrete, is (A) Sodium sulphates (B) Sodium chlorides (C) Sodium carbonates and bicarbonates (D) Calcium bicarbonates
Description : Water used for mixing concrete should be [ A ] Slightly acidic [ B ] Free from bacteria [ C ] Distilled [ D ] Potable
Last Answer : [ D ] Potable
Description : Water used for mixing of concrete should be free from (i)Oils (ii)Salts (iii)Acids [ A ] i [ B ] iii [ C ] i and iii [ D ] i, ii and iii
Last Answer : [ D ] i, ii and iii
Description : The process of proper and accurate measurement of concrete ingredients for uniformity of proportion, is known as [ A ] Curing [ B ] Mixing [ C ] Grading [ D ] Batching
Last Answer : [ D ] Batching
Description : The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is (A) 10 cm (B) 15 cm (C) 20 cm (D) 25 cm
Description : The cement becomes useless if its absorbed moisture content exceeds (A) 1 % (B) 2 % (C) 3 % (D) 5 %
Description : A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is (A) 500 m3 (B) 1000 m3 (C) 1500 m3 (D) 2000 m3
Last Answer : (C) 1500 m3
Description : For M 150 mix concrete, according to I.S. specifications, local bond stress, is (A) 5 kg/cm2 (B) 10 kg/cm2 (C) 15 kg/cm2 (D) 20 kg/cm
Description : According to I.S. : 456 specifications, the safe diagonal tensile stress for M 150 grade concrete, is (A) 5 kg/cm2 (B) 10 kg/cm2 (C) 15 kg/cm2 (D) 20 kg/cm
Description : According to I.S.: 456, 1978 the thickness of reinforced concrete footing on piles at its edges, is kept less than (A) 5 cm (B) 10 cm (C) 15 cm (D) 20 cm
Description : The expected out turn of 2.5 cm cement concrete floor per mansion per day (A) 2.5 sqm (B) 5.0 sqm (C) 7.5 sqm (D) 10 sqm
Last Answer : (C) 7.5 sqm
Description : For determining the moisture content of a soil sample, the following data is available Weight of container = 260 g, Weight of soil sample and = 320 g container, Weight of soil sample (dried) and = 310 g container. The moisture content of the soil sample, is (A) 15 % (B) 18 % (C) 20 % (D) 25 %
Last Answer : (C) 20 %
Description : Dolomite is a lime stone which contains carbonate of magnesia upto (A) 15 % (B) 20 % (C) 25 % (D) 45 %
Description : A first class brick when immersed in cold water for 24 hours should not absorb water more than (A) 15 % (B) 20 % (C) 22 % (D) 25 %
Description : Percentage of pozzolanic material containing clay upto 80% used for the manufacture of pozzolana cement, is (A) 30 % (B) 40 % (C) 50 % (D) 60 %
Last Answer : (A) 30 %
Description : The percentage of voids in cement is approximately (A) 25 % (B) 40 % (C) 60 % (D) 80 %
Last Answer : (B) 40
Description : Pick up the incorrect statement from the following. For performing compressive strength test of cement (A) Cement and standard sand mortar are used in the ratio of 1 : 3 (B) Water is added at the ... cm 10 cm is used (D) The prepared moulds are kept in a atmosphere of 50% relative humidity