The wall constructed for the stability of a back filling portion of a road on the downhill side, is
known as
(A) Retaining wall
(B) Breast wall
(C) Parapet wall
(D) All the above

1 Answer

Answer :

Answer: Option A

Related questions

Description : The wall constructed for the stability of an excavated portion of a road on the hill side, is known as (A) Retaining wall (B) Breast wall (C) Parapet wall (D) All the above

Last Answer : Answer: Option B

Description : A wall constructed to resist the pressure of an earth filling, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option A

Description : A wall constructed with stones to protect slopes of cuttings in natural ground from the action of weathering agents, is called (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Option B

Description : The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as (A) Retaining wall (B) Breast wall (C) Parapet wall (D) None of the above

Last Answer : Answer: Option B

Description : Parapet walls along hill roads, are provided (A) To retain the back filling (B) To prevent the hill from sliding (C) To prevent the wheels of the vehicle from coming on the retaining wall (D) None of these

Last Answer : Answer: Option C

Description : The stepped structure provided for lateral support of a structure, is (A) Retaining wall (B) Breast wall (C) Buttress (D) Parapet wall

Last Answer : Answer: Option C

Description : Formation width of a hill road is the distance between (A) Outer end of side drain to outer end of parapet wall (B) Outer end of side drain to inner end of parapet wall (C) Inner end of side drain to outer end of parapet wall (D) Inner end of side drain to inner end of parapet wall

Last Answer : Answer: Option A

Description : Weep holes are provided in retaining and breast walls (A) To drain off the water from the filling (B) To ventilate the stone masonry (C) To add architectural beauty (D) To increase compaction of the earth retained

Last Answer : Answer: Option A

Description : Road width 8.8 m of two lane National highways or State highways in mountainous terrain (A) Excludes the width of parapet (0.6 m) (B) Excludes the width of side drain (0.6 m) (C) Excludes the width of parapet and side drain (D) Includes the width of parapet and side drain

Last Answer : Answer: Option C

Description : In case the factor of safety against sliding is less than 1.5, a portion of slab is constructed downwards at the end of the heel slab, which is known as (A) A key (B) A cut-off wall (C) A rib (D) All the above

Last Answer : Answer: Option D

Description : The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage ... 15) chains (B) (6 + 12) chains (C) (6 + 18) chains (D) None of these

Last Answer : (B) (6 + 12) chains

Description : Retaining walls are generally constructed with dry rubble stones with 60 cm top width and (A) 1 : 2 front batter (B) 1 : 3 front batter (C) 1 : 4 front batter (D) 1 : 5 front batter

Last Answer : Answer: Option B

Description : Consider the following activities in a building construction: 1. Concreting of roof slabs 2. Brick-jelly lime concrete terracing 3. Erection of form work for slab 4. Construction of parapet wall in terrace The correct sequence of these ... (B) 3, 1, 4, 2 (C) 3, 1, 2, 4 (D) 1, 3, 4, 2

Last Answer : (C) 3, 1, 2, 4

Description : Pick up the correct statement from the following: (A) Cavity of a cavity wall should start near ground level (B) Cavity of a cavity wall should terminate near eaves level of sloping roof (C) Cavity of a cavity wall should terminate near coping of flat roof with parapet wall (D) All the above

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) In the stem of a retaining wall, reinforcement is provided near the earth side (B) In the toe slab of a retaining wall, reinforcement is ... slab of a retaining wall, reinforcement is provided at the top of the slab (D) None of these

Last Answer : Answer: Option D

Description : In retaining and breast walls, weep holes are provided at (A) 50 cm vertical height and 50 cm centre to centre horizontally (B) 100 cm vertical height and 100 cm centre to centre horizontally ... cm centre to centre horizontally (D) 120 cm vertical height and 100 cm centre to centre horizontally

Last Answer : Answer: Option C

Description : A retaining wall 6m high supports a backfill with a surcharge angle of 10°. The back of the wall is inclined to the vertical at a positive batter angle of 5°. If the angle of wall friction is 7°, then the resultant ... inclined to the horizontal at an angle of (A) 7° (B) 10° (C) 12° (D) 17

Last Answer : (C) 12°

Description : The dock wall is designed as a gravity retaining wall and is tested for (A) Back fill pressure when the dock is empty (B) Maximum water pressure from the dock without any back fill (C) The load charge ... to the dock by the movement of loaded vehicles or trains on the way (D) All of the above

Last Answer : (D) All of the above

Description : In a counterfort retaining wall, the main reinforcement is provided on the (i) Bottom face in front counterfort (ii) Inclined face in front counterfort (iii) Bottom face in back counterfort (iv) Inclined face in back counterfort ... (B) (ii) and (iii) (C) (i) and (iv) (D) (iii) and (iv)

Last Answer : Answer: Option C

Description : Two travellers spend from 12 o'clock to 6 o'clock walking along a level road, up a hill and back again. Their pace is 4 mph on the level, 3 mph uphill, and 6 mph downhill.How far do they walk and at what time do they reach the top of the hill? -Riddles

Last Answer : 24 miles half past three.

Description : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Last Answer : Draw a neat labeled sectional view showing different components of building from foundation to parapet, for a load bearing brick masonry wall.

Description : Following type of pavement is generally known as flexible pavement (A) Water-bound macadam roads (B) Stabilised soil roads (C) Road constructed with various layers of building material well compacted (D) All the above

Last Answer : Answer: Option D

Description : he lateral earth pressure on a retaining wall (A) Is equal to mass of the soil retained (B) Proportional to the depth of the soil (C) Proportional to the square of the depth of the soil (D) Proportional to the internal friction of the soil

Last Answer : (D) Proportional to the internal friction of the soil

Description : A failure wedge develops if a retaining wall (A) Moves away from the backfill (B) Moves towards the backfill (C) Sinks downwards (D) Stresses equally by vertical and horizontal forces

Last Answer : Answer: Option A

Description : The major principal stress in an element of cohesion-less soil within the backfill of a retaining wall is (A) Vertical if the soil is in an active state of plastic equilibrium (B) Vertical if the ... state of plastic equilibrium (C) Inclined at 45° to the vertical plane (D) None of the above

Last Answer : Answer: Option A

Description : The design of a retaining wall assumes that the retained earth (A) Is dry (B) Is free from moisture (C) Is not cohesive (D) All the above

Last Answer : Answer: Option D

Description : To have pressure wholly compressive under the base of a retaining wall of width b, the resultant of the weight of the wall and the pressure exerted by the retained, earth should have eccentricity not more than (A) b/3 (B) b/4 (C) b/5 (D) b/6

Last Answer : Answer: Option D

Description : The thickness of base slab of a retaining wall generally provided, is (A) One half of the width of the stem at the bottom (B) One-third of the width of the stem at the bottom (C) One fourth of the width of the steam at the bottom (D) Width of the stem at the bottom

Last Answer : Answer: Option D

Description : If is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is (A) 0.3 H (B) 0.4 H (C) 0.5 H (D) 0.7 H

Last Answer : Answer: Option D

Description : If"w" is weight of a retaining wall and is the horizontal earth pressure, the factor of safety against sliding, is (A) 1.0 (B) 1.25 (C) 1.5 (D) 2.0

Last Answer : Answer: Option C

Description : The stem of a cantilever retaining wall which retains earth level with top is 6 m. If the angle of repose and weight of the soil per cubic metre are 30° and 2000 kg respectively, the effective width of the stem at the bottom, is (A) 51.5 (B) 52.5 (C) 53.5 (D) 54.5

Last Answer : Answer: Option C

Description : In a cantilever retaining wall without a heel slab (A) Thickness of the stem is kept same throughout (B) Base slab is made 10 cm thicker than the stem (C) Width of the base slab is kept 0.7 time the total height of the wall (D) All the above

Last Answer : Answer: Option D

Description : Total pressure on the vertical face of a retaining wall of height h acts parallel to free surface and from the base at a distance of (A) h/4 (B) h/3 (C) h/2 (D) 2h/3

Last Answer : Answer: Option B

Description : The design of heel slab of a retaining wall is based on the maximum bending moment due to: (A) Its own weight (B) Weight of the soil above it (C) Load of the surcharge, if any (D) All the above

Last Answer : Answer: Option D

Description : Pick up the correct statement from the following: (A) The breakwater which can be used as a platform for loading and unloading of cargo is called a mole (B) The brick masonry retaining wall which is ... wall (C) Three types of break waters are generally provided in harbours (D) All of the above

Last Answer : (D) All of the above

Description : A T-shaped retaining wall mainly consists of (A) One cantilever (B) Two cantilevers (C) Three cantilevers (D) Four cantilevers

Last Answer : (C) Three cantilevers

Description : The main reinforcement in the toe of a T-shaped R C. retaining wall is provided on (i) Top face parallel to the wall (ii) Top face perpendicular to the wall (iii) Bottom face parallel to the wall (iv) ... (i) and (ii) are correct (C) (iii) and (iv) are correct (D) Only (iv) is correct

Last Answer : Answer: Option D

Description : The main reinforcement in the heel of a T-shaped R.C. retaining wall is provided on (A) Top face perpendicular to wall (B) Bottom face perpendicular to wall (C) Both top and bottom faces perpendicular to wall (D) None of these

Last Answer : Answer: Option A

Description : In the design of a front counterfort in a counterfort retaining wall, the main reinforcement is provided on (i) Bottom face near counterfort (ii) Top face near counterfort (iii) Bottom face near centre of span (iv) Top ... ) (B) Only (ii) (C) Both (i) and (iv) (D) Both (ii) and (iii)

Last Answer : Answer: Option C

Description : Which of the following R.C. retaining walls is suitable for heights beyond 6 m? (A) L-shaped wall (B) T-shaped wall (C) Counterfort type (D) All of the above

Last Answer : Answer: Option C

Description : In a counterfort retaining wall, the main reinforcement in the stem at mid span is provided on (A) Front face only (B) Inner face only (C) Both front face and inner face (D) None of the above

Last Answer : Answer: Option A

Description : The temperature reinforcement in the vertical slab of a T-shaped R.C. retaining wall is (A) Not needed (B) Provided equally on inner and front faces (C) Provided more on inner face than on front face (D) Provided more on front face than on inner face

Last Answer : Answer: Option D

Description : Pick up the incorrect statement from the following: (A) The retaining wall should be structurally capable to resist the applied earth pressure (B) The section of the retaining wall should be so ... off water from the earth retained, weep holes are provided near the top of the retaining wall

Last Answer : Answer: Option D

Description : The usual width of parapet walls along Highways in hilly region, is (A) 50 cm (B) 60 cm (C) 70 cm (D) 80 cm

Last Answer : Answer: Option B

Description : The G.T. road from Lahore to Calcutta in undivided India, was constructed during (A) 3495-3500 BC (B) 265-270 BC (C) 1540-1545 AD (D) 1440-1450 AD

Last Answer : Answer: Option C

Description : Pick up the correct statement from the following: (A) The artificial barrier constructed to enclose "n area for safe anchorage, is called break water (B) The smoothened surface at the top end of ... fending (C) The effective berthing lengths of inclined guays can be adjusted (D) All the above

Last Answer : (D) All the above

Description : Pick up the incorrect statement from the following: (A) The width of the wall is constructed thicker at the base in a stepped fashion (B) A long vertical load transferring concrete structure is ... ) The pile which transfers the load to a hard rock bed at certain depth is called load bearing

Last Answer : Answer: Option D

Description : Brick nogging type of partition wall, is constructed by (A) Laying bricks as stretchers in cement mortar (B) Laying bricks as headers in cement mortar (C) Reinforcing brick wall with iron straps (D) Constructing brick work within a wooden framework

Last Answer : Answer: Option D

Description : If the rate of change of the super-elevation along a curved portion of a 7 metre wide road is 1 in 150 and the maximum super-elevation allowed is 1 in 15, the maximum length of the transition curve to be provided at either end, is (A) 65 m (B) 70 m (C) 75 m (D) 80 m

Last Answer : Answer: Option B