Description : In ______, the router forwards thereceived packet through only one of its interfaces. A) unicasting B) multicasting C) broadcasting D) none of the above
Last Answer : unicasting
Description : _______ conversionis the process of changing one of the characteristics ofan analog signal basedon the informationin the digitaldata. A) Digital-to-analog B) Analog-to-analog C) Analog-to-digital D) Digital-to-digital
Last Answer : Digital-to-analog
Description : Which function calculates the largest value in a set of numbers in Excel? 1) Average 2) Count 3) Minimum 4) Maximum
Last Answer : 4) Maximum
Description : HDLC isan acronym for _______. A) High-duplex line communication B) High-leveldata link control C) Half-duplex digital link combination D) Hostdouble-level circuit
Last Answer : High-leveldata link control
Description : The signal which has infinitely many levels of intensity over a period of time is called ……… A. digital signal B. analog signal C. both a and b D. sound signal
Last Answer : A. digital signal
Description : The term modem is a composite word that refers to the two functional entities that make up the device: asignal _______ and a signal _______. A) modulator; demodulator B) demodulator; modulator C) modern;demo D) none of the above
Last Answer : modulator; demodulator
Description : In a fiber-optic cable, the signal is propagatedalong theinner core by _______. A) reflection B) refraction C) modulation D) none of the above
Last Answer : reflection
Description : The _______ technique uses M different carrier frequencies that are modulated by the source signal. At one moment, the sign modulates one carrier frequency; at the next moment, thesignal modulates another carrier frequency. A) FDM B) DSSS C) FHSS D) TDM
Last Answer : FHSS
Description : In synchronous TDM, forn signal sources of the same data rate, eachframe contains _______ slots. A) n B) n + 1 C) n- 1 D) 0to n
Last Answer : n
Description : The _______ is thephysicalpath over which a message travels. A) Protocol B) Medium C) Signal D) All the above
Last Answer : Medium
Description : In a synchronous modem, the digital-to-analog converter transmits signal to the a. equilizer b. modulator c. demodulator d. terminal e. none of aobve
Last Answer : equilizer
Description : ________conversion is therepresentation ofanalog information by an analog signal. A) Digital-to-analog B) Analog-to-analog C) Analog-to-digital D) Digital-to-digita
Last Answer : Analog-to-analog
Description : A _________ digital signal includes timing informationin the data beingtransmitted. A) self-synchronizing B) self-modulated C) self-transmitted D) none of the above
Last Answer : self-synchronizing
Description : A(n)_________ signal is a composite analogsignal with an infinite bandwidth. A) digital B) analog C) either (a)or (b) D) neither (a) nor (b
Last Answer : digital
Description : Bits can be sent over guided and unguided media as analog signal by ___________ a. digital modulation b. amplitude modulation c. frequency modulation d. phase modulation
Last Answer : a. digital modulation
Description : To deliver a message to the correct application program running on a host, the _______ address must be consulted. A. IP B. MAC C. Port D. None of the mentioned
Last Answer : C. Port
Description : Data from a computer are_______; the local loop handles _______ signals. A) analog; analog B) analog; digital C) digital; digital D) digital; analog
Last Answer : digital; analog
Description : PCM is an example of _______ conversion. A) digital-to-digital B) digital-to-analog C) analog-to-analog D) analog-to-digital
Last Answer : analog-to-digital
Description : _______ signals canhave only alimited number of values. A) Analog B) Digital C) (a) or (b) D) None of the above
Last Answer : Digital
Description : _______ data have discretestates and take discrete values. A) Analog B) Digital C) (a) or (b) D) None of the above
Description : In baseball, what is the second line along the first baseline?
Last Answer : What second line? I don’t see it.
Description : In a project schedule, the sequence of activities which cannot be delayed during the course of the project without extending the project end date is referred to as the: A. Action plan B. Critical path C. Schedule baseline D. Slack line
Last Answer : B. Critical path
Description : Which one of the following residual biases involves the GPS accuracy? (A) Satellite dependent biases due to uncertainty in the orbital parameters of the satellite (B) Receiver-dependent biases due to ... (C) Signal propagation biases due to the sphere and troposphere propagation (D) All the above
Last Answer : Answer: Option D
Description : Which function calculates the largest value in a set of numbers in Excel ?
Last Answer : The Max () function calculates the largest value in a set of numbers in Excel.
Description : What website most accurately calculates car value?
Last Answer : Try visiting www.autotrader.com, www.Edmunds.com, www.WhatCar.com, or www.Autos.com to calculate your car's value. If those do not help, try contacting a local automotive business for more information either by calling or visiting.
Description : _____________ senor senses the amount of oxygen in the engine exhaust and calculates air-fuel ratio. a) Engine temperature b) Exhaust gas c) Air flow d) Air inlet temperature
Last Answer : Answer: b Explanation: Exhaust gas senor senses the amount of oxygen in the engine exhaust and calculates airfuel ratio while engine temperature sensor senses the temperature of the engine coolant, and from this data the computer adjusts the mixture strength to rich side for cold starting.
Description : A company calculates the prices of jobs by adding overheads to the prime cost and adding 30% to total costs as a profit margin. Job number Y256 was sold for Rs1690 and incurred overheads of Rs 694. What was the prime cost of the job? (a) Rs 489 (b) Rs 606 (c) Rs 996 (d) Rs 1300
Last Answer : (b) Rs 606
Description : If a baseball coach calculates batting averages, what scale would be used? a. Interval scale b. Ratio scale c. Nominal scale d. Ordinal scale
Last Answer : b. Ratio scale
Description : Henry takes the company's sales for the past five years and calculates a growth trend. Which sales forecasting method is being employed? A)time series analysis B)executive judgement C)correlation methods D)market tests
Last Answer : A)time series analysis
Description : The profit percentage of banu and renu is same on selling the articles at Rs 900 each but banu calculates his profit in the selling price while renu calculates it correctly on the cost price which is equal to 10%. What is the difference in their profits?
Last Answer : when profit calculate on SP the profit = 10% of 900 = 90 when profit calculate on CP(x) = x+X/10 = 900 11X=9000 X=818.18 profit= 81.82 required diffference= 90-81.82 = Rs 8.18
Description : The range of sequence number which is the concern of the receiver is called the receive sliding window. A. receive sliding window. B. sliding window C. frame buffer D. both a and b
Last Answer : A. receive sliding window.
Description : Which of the following statement is correct? a. terminal section of a synchronous modem contains the scrambler b. receiver section of a synchronous modem contains the scrambler c. transmission section of ... d. control section of a synchronous modem contains the scrambler e. none of the above
Last Answer : transmission section of a synchronous modem contains the scrambler
Description : Inthe _____ Protocol, the sender sends one frame, stops until it receives confirmation from the receiver, and then sends the next frame. A) Stop-and-Wait B) Simplest C) Go-Back-N ARQ D) Selective-Repeat ARQ
Last Answer : Stop-and-Wait
Description : Inthe _____ Protocol, the sender sends its frames oneafter another with noregard to the receiver. A) Stop-and-Wait B) Simplest C) Go-Back-N ARQ D) Selective-Repeat ARQ
Last Answer : Stop-and-Wait B) Simplest
Description : In ________ error correction, the receiver asks thesender tosend thedata again. A) backward B) retransmission C) forward D) none of the above
Last Answer : retransmission
Description : In ________ error correction, the receiver correctserrors without requestingretransmission. A) backward B) onward C) forward D) none of the above
Last Answer : forward
Description : In_________ transmission, we send bits oneafter another without startor stop bits or gaps. It is the responsibilityof the receiver togroup the bits. A) synchronous B) asynchronous C) isochronous D) none of the abov
Last Answer : synchronous
Description : Block coding can help in _______at the receiver. A) Synchronization B) Error detection C) Attenuation D) (a) and (b)
Last Answer : (a) and (b)
Description : The term 'duplex' refers to theability of the data receiving stations toecho back aconfirming messageto the sender. Infull duplex data transmission, both the sender and the receiver A. cannot talk at once B. can ... data one ata time D. can do one way data transmission only E. None of the above
Last Answer : can do one way data transmission only
Description : In CRC if the data unit is 100111001 and the divisor is 1011 then what is dividend at the receiver? a. 100111001101 b. 100111001011 c. 100111001 d. 100111001110
Last Answer : b. 100111001011
Description : Which of the following statement is False about the efficiency of the given channel? a. If we want to send big packets on the channel, then Stop and Wait is good choice. b. If length ... is directly proportional to efficiency of channel. d. Efficient might be less if capacity of channel is high
Last Answer : Distance between sender and receiver is directly proportional to efficiency of channel.
Description : A sender uses the Stop-and-Wait ARQ protocol for reliable transmission of frames. Frames are of size 1000 bytes and the transmission rate at the sender is 80 Kbps (1Kbps = 1000 bits/second). Size of ... is lost, the sender throughput is __________ bytes/second. a. 2500 b. 2000 c. 1500 d. 500
Last Answer : a. 2500
Description : Which feature of Go Back N ARQ mechanism possesses an ability to assign the sliding window in the forward direction? a. Control Variables b. Sender Sliding Window c. Receiver Sliding Window d. Resending of frames
Last Answer : b. Sender Sliding Window
Description : The Post Office Protocol is an ………... protocol with both client (sender/receiver) and …………...functions A. electronic mail, server (storage) B. three layer , server C. UDP, transfer D. TCP, server
Last Answer : A. electronic mail, server (storage)
Description : . ________ is the process in which the receiver tries to guess the message by using redundant bits A. Connection-Oriented Service B. Forward error correction C. both a and b D. Confirm
Last Answer : B. Forward error correction
Description : Which feature of Go-Back-N ARQ mechanism possesses an ability to assign the sliding window in the forward diretion? A. Control Variables B. Sender Sliding Window C. Receiver Sliding Window D. Resending of frames
Last Answer : B. Sender Sliding Window
Description : Indicate the false statement. Noise figure is defined as A. the ratio of the S/N power supplied at the input terminal of a receiver or amplifier to the S/N power supplied to the output or ... under test, both working at the same temperature over the same bandwidth and fed from the same source
Last Answer : C. an unwanted form of energy tending to interfere with the proper and easy reception and reproduction of wanted signals
Description : ECE Board Exam March 1996 The capture area of an antenna is directly proportional to the A. frequency of the received signal B. distance between transmitter and receiver C. gain of the antenna D. power density of the signal
Last Answer : C. gain of the antenna
Description : You determine receiver sensitivity by measuring the power level of what signal?
Last Answer : Minimum discernible signal (mds).
Description : ________ is the process of converting digitaldata to adigital signal. A) Block coding B) Line coding C) Scrambling D) None of the above
Last Answer : Line coding