Prepare maintenance schedule of various actuators used in large wind power plants. 

1 Answer

Answer :

Maintenance Schedule of Various Actuators:

Maintenance of Yaw System Actuator:

The maintenance of Yaw system actuator is done quarterly or yearly. Following maintenance activities are to be performed: 1. Yaw actuator is prone to wear due to its frequent operations and so it is one of the causes of down time, Yaw system has short service life and difficult access for the maintenance. 2. Check and adjust the yaw motor and nacelle bearing. 3. Check the brake pad and change if required. 4. Regular maintenance of yaw bearing. 5. Check the area of oil leak, if any. Select the right type of oil as per operational requirement. 6.Gears in the drivers should be filled with grease and oil. 7. Electric Brake, motor fan, joint-bolts, hydraulic brake, yaw pads should be checked. 8. Check out the rusting, amount of dirt and wear of brake pads. 9. Blades have to be inspected such that there should not be obstruction for right operation. 


Maintenance of Pitch System Actuator: The maintenance of Pitch system Actuator is done quarterly or yearly. Following maintenance activities are to be performed: 1. Maintenance of tower, blades, rotor, and generator will contribute to proper functioning of the system. 2.Presently feedback control system provides control signal for pitch angle, pitch torque, temperature and data. 3.Real time data allows action for preventive maintenance and optimal performance. 4.Actuators and sensors monitor and give the signal for the area, which needs attention and maintenance. 5.In fault condition, actuators will send signal to the operator to shut down the turbine in controlled condition. 6.Monitor vibration level and if it is more than the limiting condition, then send alarming signal. 7.Monitor change in temperature, pressure and mechanical stresses. 

Related questions

Description : Prepare preventive maintenance schedule for SWT related to i) Oiling and greasing ii) Electronic equipment iii) Towers

Last Answer : Preventive maintenance schedule for SWT: I. Oiling and greasing: 1) Checking geared motor oil, greasing, lubrication and maintenance of drive train. 2) Changing oil, belts, bearing lubrication. 3 ... tower. 3) Every 6 months inspection for loop condition, safety norms, tower surface.

Description : State approximate wind power generation in India.

Last Answer : Wind Power Generation in India: Wind power generation is 20,000 MW to 65,000 MW. As of 31 March 2019 the total installed wind power capacity was 36.625 GW, the fourth largest installed wind power capacity in the world. 

Description : Explain scheduled maintenance of Stall Pitch, Active Pitch controlled of WPP.

Last Answer : Scheduled Maintenance of Stall Pitch: In scheduled maintenance of stall pitch, following maintenance activities are performed quarterly or yearly basis: 1. Grease the cable, which pulls the blade ... battery. In case of power failure, batteries will ensure the movement of blade to safe position.

Description : Describe the general maintenance issues of the horizontal axis WPPs.

Last Answer : General Maintenance Issues of Horizontal Axis WPPs:  1. Gearbox failure.  2. Misalignment between generator and gearbox.  3. Problems related to lubrication.  4. Variation among the components by ... charging gear oil, brake pads, filters, bearings, sensors, actuators. 6. Bearing failure issue. 

Description : Identify any two weekly maintenance activities for WPP.

Last Answer : Weekly Maintenance Activities: Routine checkup, monitoring, periodic reports. Blade cleaning. Higher voltage equipment maintenance. Turbines require periodic lubrication, oil changes. Bolt and electrical ... . Machine should be checked for corrosion. Check guy wire for proper tension.

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Description : Identify the sensors for the following : i) Wind speed ii) RPM of generator shaft iii) Temperature in generator iv) Cable untwisting v) Vibration vi) Wind direction

Last Answer : i) Wind Speed : Anemometer. ii) RPM of Generator Shaft: Accelerometers. iii) Temperature in Generator: Thermistor, thermocouple, RTD. iv) Cable Untwisting : Cable Twisting sensor. v) Vibration : Accelerometer, piezoelectric. vi) Wind direction: Wind vane.

Description : Related to WPP define following wind speeds  i) Cut in  ii) Cut out iii) Survival iv) Threshold

Last Answer : i) Cut-in wind speed: This is the minimum wind speed at which the turbine blades overcome friction and begin to rotate.  ii) Cut out speed: This is the speed at which the turbine ... this range, it is ensured that available energy is above the minimum threshold and structural health is maintained.

Description : Explain lift & drag wind energy conversion principle.

Last Answer : Two primary aerodynamic forces work in wind turbine rotors are:- 1) Lift which acts perpendicular to the direction of wind flow and 2) Drag acts parallel to wind flow. ... aero foil type blade offer better performance and higher rotational speed and make them ideal for power generation.

Description : State the factors which affect the nature of the wind close to the surface of the earth.

Last Answer : Factors Which Affect the Nature of the Wind Close to the Surface of the Earth: Horizontal pressure (gradient) Rotation of earth (coriolis force) Centripetal acceleration Frictional forces

Description : List various types of generators used in WPP.

Last Answer : Various Types of Generators Used in WPP: 1. Squirrel Cage Induction Generator ( SCIG ) 2. Wound Rotor Induction Generator ( WRIG ) 3. Doubly Fed Induction Generator ( DFIG ) 4. Wound Rotor synchronous Generator ( WRSG) 5. Permanent Magnet Synchronous Generator ( PMSG)

Description : Recommend & explain with neat sketch a suitable braking mechanism for the large WPP.

Last Answer : Braking Mechanism For The Large WPP: 1. Furling Mechanism: Furling allows the whole set of blades to change its position and blades turned away from wind, if wind speed is beyond safety limit. It ... 1.To harness optimum power from wind 2.To protect turbine in case of high wind speed.

Description : Identify & explain any two difficulties faced while connecting WPP to the power grid.

Last Answer : Difficulties Faced while Connecting WPP to Power Grid: There are several technical issues associated with grid connected systems like power quality issues, power and voltage fluctuations, storage, protection ... that is out of phase with grid voltage and so provide power factor correction.

Description : Name any two power electronic components in SWT.

Last Answer : Power Electronic Components in SWT: Boost converter Buck converter Buck Boost converter Cuk converter Voltage Source Inverter Current Source Inverter

Description : The financial Powers delegated by the President of India to Various officers of the department is called as a. Rules of financial power b. Schedule of financial Powers c. None of these

Last Answer : b. Schedule of financial Powers

Description : What is a good schedule for basic car maintenance?

Last Answer : There are always two manufacturer recommended maintenance intervals that are located in the vehicle's owners manual. The regular maintenance interval is intended for climates without extreme temperatures or when ... mile interval is permitted. Most places in the US would be considered Severe Duty.

Description : How often do I need to schedule Auto Maintenance for my car?

Last Answer : Maintenance on a cars can be scheduled two ways, one is time that has passed, and the other being mileage driven during a period of time. Most cars are schedule for maintenance in consideration of ... things. You should check with your car manual or dealer for more details on your particular make.

Description : How to set up a cleaning maintenance schedule for an office?

Last Answer : How do I go about setting up a cleaning maintenance schedule for my office? It seems nobody wants to do their fare share.

Description : What is the recommended maintenance schedule for a refrigerator?

Last Answer : I just bought a new refrigerator and want it to last a long time. What kind of maintenance schedule should I follow for it?

Description : Explain Briefing the half yearly schedule maintenance of OH mains?

Last Answer : Ans. "(a) Check all the jumper connections (b) Check any connections of the strands of the conductor (c ) Check and ensure proper earth connection (d) Check proper fixation of insulators, stay wires, guard wires, etc. (e) Check proper tensioning and connection of service wires."

Description : What are the schedule maintenance to be carried out OH mains & UG Cables?

Last Answer : Ans. Following are the schedule to be maintained of HO mains and UG cables. a. OH mains – Every Half yearly b. UG.Cables – Every Yearly. During those schedules, for OH, Guarding condition of insulators, sag in OH line are to be checked for UG cables, cables are to be beggared for their IR values.

Description : State the procedure for developing preventive maintenance schedule. 

Last Answer : Procedure of PM is as below:-  Step 1:- Inspection: What to inspect and how to inspect? Maintenance engineer / team should inspect the plan under working condition. Prepare the check ... :- Check the availability of trained & skilled technician to do maintenance before starting the work.

Description : Describe the factors affecting preventive maintenance schedule. 

Last Answer : Following factors affect the PM schedule:- 1. Non availability of spares & raw material. 2. Non availability of tools, trackless, jacks, fixture required for PM. 3. Non availability of trained & skilled ... the work is held up for certain period. This is also a cause of disturbing a PM schedule.

Description : Imagine that you have to arrange a ‘Teachers’ Day Celebration’ programme in your college. Prepare a schedule of the programme.

Last Answer : Imagine that you have to arrange a ‘Teachers’ Day Celebration’ programme in your college. Prepare a schedule of the programme.

Description : Prepare schedule of material for underground service connection.

Last Answer : 1. 2.5 Sqmm, 4 core Armored cable: (Size of cable is depends on load & length of cable is depends on service connection premises) 2. Brick, soft sand for protection of cable. 3. If cable is ... , MCB, Energy meter, Neutral link, IC cut out, earthing set, nut, screws, and wooden board. etc

Description : Explain with neat sketch working of direct drive SWT. Give any two advantages of it over geared type SWT.

Last Answer : Direct Drive SWT: This plant has no gear box. Turbine blades are very light weight made up of stiff carbon fibre material. Blades are flat shaped. Due to this shape, lift increases. ... needed is less 4. More reliable 5. Better performance 6. Light weight 7. Less maintenance

Description : List any four mechanical and electrical faults in SWT.

Last Answer : Mechanical Faults in SWT: 1. Bearing and gearbox issue 2. Blade design , manufacturing, installation issue 3. Mechanical break down 4. Hydraulic failure 5. Nacelle ... failure, power regulator failure 12. Torque reversal due occasional connecting and disconnecting generator to grid

Description : Recommend with justification the generators used in SWT.

Last Answer : 1. Fixed Speed Induction Generator: This is squirrel cage induction generator for fixed speed. This is 1) reliable 2) self-starting 3) easy to adjust 4) have low maintenance.  2. ... optimizes use of given grid capacities 6) Better cooling performance 7) Reduced noise level of moving parts.

Description : Name any four main parts of SWT. Give function of each part.

Last Answer : Parts of SWT:  1. Rotor - It includes blades for converting wind energy to low speed rotational energy.  2. Gear box - It converts low speed rotational energy to high speed.  3. ... 5. Other Equipment: Control equipment, electric cables, hub, tale vane, sensors, anemometer to implement control.

Description : Draw a block diagram of WPP substation. State function of each block.

Last Answer : Block Diagram of WPP Substation: OR Wind Turbine : Converts wind power to rotational mechanical energy Gear Box: Transfer low speed to high. Generator: Converts rotational ... to DC and vice-versa of correct frequency. Transformer: Step up the voltage to grid level.

Description : List any four towers related to WPP. Explain any one in brief.

Last Answer : List of Towers Related to WPP: Tubular Steel / concrete Tower Lattice Tower Guyed Pole Tower Hybrid Tower 1. Tubular steel tower: Generally used for a large wind turbine and normally manufactured in ... type tower and thin, tall lattice type tower in the middle instead of single pole.

Description : Give the classification of SWT on any two factors.

Last Answer : Classification of SWT: According to axis of rotor 1. Horizontal axis wind turbine 2. Vertical axis wind turbine According to direction 1. Up wind 2. Down wind According to number of blades 1 ... 1. Constant speed 2. Variable speed According to drive 1. Direct Drive 2. Geared Drive

Description : Name any two aerodynamic controls for WPP.

Last Answer : Aerodynamic Control for WPP: Pitch control Passive stall control Active stall control Yaw control

Description : List any two advantages of vertical axis WPPs.

Last Answer : Advantages of Vertical Axis WPPs: They can produce electricity in any wind direction. Low production cost as compared to horizontal axis wind turbine. Easy construction. Low maintenance ... weather conditions. Variable speed operation. Yaw and pitch control mechanism are not needed.

Description : …………………… is a schedule of various applications to be computerized. A) Materials planning B) Master development Plan C) Manufacturing organization D) None of the above

Last Answer : B) Master development Plan

Description : Can Arduino be used with actuators?

Last Answer : Yes, Arduino can be used with a wide variety of actuators, such as motors, servos, solenoids, or LEDs, by using motor drivers, relay modules, or other actuator control circuits, or by connecting actuators directly to Arduino pins.

Description : What is actuators?

Last Answer : An actuator is a device which actuates something else -especially a mechanism which causes a device to be switched on oroff.

Description : What is actuators?

Last Answer : An actuator is a device which actuates something else -especially a mechanism which causes a device to be switched on oroff.

Description : What is used to initiate the perception in the environment? a) Sensor b) Read c) Actuators d) None of the mentioned

Last Answer : a) Sensor

Description : What are the four basic parts of any valve actuators?

Last Answer : a. Valve motor. b. Gear mechanism. c. Limit switch and torque switch assembly. d. Terminal box. 

Description : What are the advantages of motorised valve actuators?  

Last Answer : Advantages a. Can be used to operate in remote areas, high heat areas etc. b. Suitable logics can be wired up easily. c. Hammer blow mechanism (which will release valve in stuck open or close). The motor has high torque. 

Description : Which is used to provide the feedback to the learning element? a) Critic b) Actuators c) Sensor d) None of the mentioned

Last Answer : a) Critic

Description : Where does the performance measure is included? a) Rational agent b) Task environment c) Actuators d) Sensor

Last Answer : b) Task environment

Description : Which technology uses miniaturized accelerometers and gyroscopes? a) Sensors b) Actuators c) MEMS d) None of the mentioned

Last Answer : c) MEMS

Description : Which were built in such a way that humans had to supply the inputs and interpret the outputs? a) Agents b) AI system c) Sensor d) Actuators

Last Answer : b) AI system

Description : The Task Environment of an agent consists of ____________ a) Sensors b) Actuators c) Performance Measures d) All of the mentioned

Last Answer : d) All of the mentioned

Description : Agents behavior can be best described by ____________ a) Perception sequence b) Agent function c) Sensors and Actuators d) Environment in which agent is performing

Last Answer : b) Agent function

Description : Which instruments are used for perceiving and acting upon the environment? a) Sensors and Actuators b) Sensors c) Perceiver d) None of the mentioned

Last Answer : a) Sensors and Actuators

Description : Which of the following is not true? A : For robotics, you should have a knowledge of different sensors B : For robotics, you must be able to write different planning algorithms C : For robotics, you may have to use actuators D : For robotics, you do not require help of computer engineers, mechanical

Last Answer : D : For robotics, you do not require help of computer engineers, mechanical

Description : Drives are also known as A : Sensor B : Controller C : Actuators D : Manipulator

Last Answer : C : Actuators