Bird in hand’ argument is given by

A. Walter’s Model

B. Gordon’s Model

C. MM Model

D. Residual’s

1 Answer

Answer :

B. Gordon’s Model

Related questions

Description : Which of the following stresses on investor’s preference for current dividend than higher  future capital gains? A. Walter’s Model B. Residual’s Theory C. Gordon’s Model D. MM

Last Answer : C. Gordon’s Model

Description : Walter’s Model suggests that a firm can always increase the value of the share by: A. Increasing dividend B. Decreasing dividend C. Constant Dividend D. None of the

Last Answer : D. None of the

Description : Residuals theory argues that dividend is a : A. Relevant Decision B. Active Decision C. Passive Decision D. Irrelevant

Last Answer : C. Passive Decision

Description : MM Model of Dividend irrelevance uses arbitrage between : A. Dividend and Bonus B. Dividend and Capital Issue C. Profit and Investment D. None of the

Last Answer : B. Dividend and Capital Issue

Description : How much alcohol in Gordon's gin?

Last Answer : Need answer

Description : Which of the following methods are employed for determination of free and combined chlorine residuals in water ? 1. Starch-iodide method 2. Orthotolidine method 3. Amperometric titration method 4. SNORT method 5. DPD method a) 1, 2, ... b) 1, 2 and 3 only c) 3, 4 and 5 only d) 2, 3, and 4 only.

Last Answer : a) 1, 2, 4 and 5

Description : What what is Walter's job in A Raisin in the Sun?

Last Answer : What is the answer ?

Description : Which sentence best describes the root of Walters unhappiness?

Last Answer : He wants to provide for his family but has limited options. (APEX) !/

Description : Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job. (A) Algorithmic model (B) Expert judgment (C) Bottom-up (D) Top down

Last Answer : (C) Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A) Algorithmic model (B) Expert judgment (C) Top down (D) Analogy

Last Answer : (D) Analogy

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : What is the first step in project planning? Select one: a. Establish the objectives and scope. b. Determine the budget. c. Select the team organizational model. d. Determine project constraints. e. Inspect the deliverables.

Last Answer : a. Establish the objectives and scope.

Description : A simple way of looking at the spiral life-cycle model is as a waterfall model with each phase proceeded by a) Build-and-fix b) Freezing c) Synchronization d) Testing e) Risk analysis

Last Answer : e) Risk analysis

Description : The advantage of following the IEEE Standard for drawing up a Project Management Plan (SPMP) - see IEEE Standard 1059.1 1987 - is a) It is drawn up by representatives from major  ... each organisation for a  particular applicationarea, development team or  technique. e) All of the above.

Last Answer : e) All of the above.

Description : Which of the following items should not be included in the  project management plan? a) The techniques and case tools to be used b) Detailed schedules, budgets and resource ... development  organisation, project responsibilities, managerial  objectives and priorities e) None of the above.

Last Answer : c) The life cycle model to be used

Description : Which model is used during early stages of the system  design afterthe requirements have been established? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : d) An early design model

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : The RUP is normally described from three perspectives- dynamic, static& practice. What does static perspective do? a) It shows the process activities that are enacted. b) It suggests good practices to be used during the process. c) It shows the phases of the model over time.

Last Answer : a) It shows the process activities that are enacted.

Description : Each component of the product is separately estimated and the results aggregated to produce an estimate for the overall job. (A)Algorithmic model (B)Expert judgment (C)Bottom-up (D)Top down

Last Answer : (C)Bottom-up

Description : Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are known. (A)Algorithmic model (B)Expert judgment (C)Top down (D)Analogy

Last Answer : (D)Analogy

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Constantine suggests four “organizational paradigms” for  engineering teams. The best project team organizational model to use when handling extremely complex problems is  a. Random paradigm b. Open paradigm c. Synchronous paradigm d. Closed paradigm

Last Answer : a. Random paradigm

Description : The hurricane model implies that project estimates become more accurate as the  project's product becomes better understood.

Last Answer : Ans: True

Description :  The COCOMO model to convert lines of code estimates into person-month estimates  was designed by Allen Albrecht of IBM.

Last Answer : Ans: False

Description : Which method is not included in seven Project Selection Methods?  A. Financial Analysis B. Strategic Alignment C. Weighted Scoring Model D. Straight line Model (Ans.)

Last Answer : D. Straight line Model (Ans.)

Description : Identify which technique will not help a company to optimise its working capital cycle. A. Offering discounts for early payment by debtors B. Using cash management models to optimise the level of ... order quantity model to stock management E. Adopting the use of just-in-time stock management

Last Answer : B. Using cash management models to optimise the level of cash held

Description : What Is V Model In Testing?

Last Answer : The mapping of the type of testing to the stage of development in a given project is done by V model. In this model of testing there is a testing stage for every development stage which means a mapping between the development and a testing.

Description : What Do You Mean By V-model In Testing?

Last Answer : V-model performs a mapping between the type of test and the stage in project development i.e which test is to be performed at which stage. This has 4 levels of testing the system: 1. ... independent tester. 3. System Testing- performed by system team. 4. Acceptance testing-performed by the client.

Description : What Is Dual Vee Model?

Last Answer : The Dual Vee Model, like the V-Model is a systems development model designed to simplify the understanding of the complexity associated with developing systems. In systems engineering it is used to define ... of the Dual Vee Model when applied as a reminder model for development of complex systems.

Description : What Is V-model ?

Last Answer : The V-model is a software development process which can be presumed to be the extension of the waterfall model. Instead of moving down in a linear way, the process steps are bent ... demonstrates the relationships between each phase of the development life cycle and its associated phase of testing.

Description : What Is Waterfall Model?

Last Answer : The waterfall model is a sequential software development process, in which progress is seen as flowing steadily downwards (like a waterfall) through the phases of Conception, Initiation, Analysis, Design (validation), Construction, Testing and maintenance.

Description : Which one of the following statements best defines an estimate? a. An approximation of project time and cost targets, refined throughout the project life cycle. b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life cycle.

Description : Which two requirements are given priority during Requirement  Management of a product ? a) User and Developer b) Functional and Non-functional c) Enduring and Volatile

Last Answer : c) Enduring and Volatile

Description : Choose an internal quality from given below: a) scalability b) usability c) reusability d) reliability

Last Answer : c) reusability

Description : Choose the correct option according to given below  statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: quality assurance, ... . c. Only statement 3 is correct. d. Statement 1 and statement 3 are correct

Last Answer : b. Statement 1 and statement 2 are correct.

Description :  A project with total budget cost of 30 crores is scheduled to be completed in 80 weeks. A periodic review was carried out at end of 60 weeks and results are as given:  Budgeted cost of work performed (EV) = 17 ... crores What is the cost performance index?  A.0.895  B.0.81  C.0.90  D.1.12

Last Answer : A.0.895

Description : Project close out check list do not include the followings A. Confirm the customer satisfaction  B. Check that all the project criteria of the project have been met C. Confirm all the deliverables have been given to the customer  D. Changes suggested by Stockholder have not been delivered

Last Answer : D. Changes suggested by Stockholder have not been delivered

Description : You are a project manager for Move It Now trucking company. Your company specializes in moving household goods across the city or across the country. Your project involves upgrading the nationwide computer network for the ... the weighted average or expected value? A. 54 B. 66 C. 60 D. 30

Last Answer : C. 60

Description : Which one of the following statements best defines an estimate?  a. An approximation of project time and cost targets, refined throughout the project life  cycle.  b. A prediction of a future ... . A situation that affects or influences the outcome of the project expressed in time or cost terms.

Last Answer : a. An approximation of project time and cost targets, refined throughout the project life  cycle.

Description : If the Sales is Rs.100 crores, EBIT is Rs.30 crores, PAT is Rs.20 crores and Total Assets is Rs.300 crores, then the return on assets (ROA) is given by A. 6.67% B. 10% C. 33.33% D. 23.33% E. 26.67%

Last Answer : B. 10%

Description : I recently had an xray done of my hand in the position of flippin' the bird. It's pretty awesome. How can I make it art?

Last Answer : answer:Assuming it's a transparency, how does it look if you shine a light through it against a wall? You could make a skeletal flip-off spotlight And you could make t-shirts You could use it as an ... . Ya, like a night light, or to cast a shadow on a wall to make the wall subtly decorative

Description : A bird in the hand is worth two in the bush. Do you have a recent personal example of this?

Last Answer : Thankfully,no,for that sounds painful! ;)

Description : Bird in hand versus the bird in the bush?

Last Answer : I think that would be unpardonably rude. As long as you're both clear in your understanding that you're just going out for some fun and company and don't intend to make a long-term thing of it, ... enough. But bear in mind that people's feelings don't always conform to the agreements they've made.

Description : White bird, featherless, flyin' out o' paradise, flyin' over sea and land, dyin' in my hand. What is it? -Riddles

Last Answer : A snowflake!

Description : In new Rail as well as second hand rails how much end bends of the rails in lateral direction are permitted when checked with one metre straight edge before welding? (i) ± 0.2 mm in lateral direction (ii) ± 0.3 mm in lateral direction (iii) ± 0.5 mm in latera

Last Answer : (iii) ± 0.5 mm in latera