The COCOMO model to convert lines of code estimates into person-month estimates 

was designed by Allen Albrecht of IBM.

1 Answer

Answer :

Ans: False

Related questions

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : The hurricane model implies that project estimates become more accurate as the  project's product becomes better understood.

Last Answer : Ans: True

Description : . Which of the following is empirical estimation technique? (i) expert judgement (ii) Delphi estimation (iii) COCOMO (iv) Critical path Method A. only i, ii & iii B. only i & ii C. only i, iii & iv D. All of the above

Last Answer : B. only i & ii

Description : Which of the following technique overcomes drawback related to LOC? A. Project Planning Sheet B. Function Point Metric C. COCOMO D. COCOMO2

Last Answer : B. Function Point Metric

Description : In Intermediate COCOMO the mode that represents complex  products is referred to as a) Embedded b) Semidetached c) Organic d) Multiplicative e) onolithic.

Last Answer : a) Embedded

Description : A software company needs to develop a project that is estimated as 1000 function points and is planning to use JAVA as the programming language whose approximate lines of code per function point is accepted as 50. Considering a=1. ... ? (1) 11.2 months (2) 12.2 months (3) 13.2 months (4) 10.2 months

Last Answer : Generally, any projects are measured in weeks. However, the complex project might take more time depending on the level of object re-use available.

Description : The advantage of following the IEEE Standard for drawing up a Project Management Plan (SPMP) - see IEEE Standard 1059.1 1987 - is a) It is drawn up by representatives from major  ... each organisation for a  particular applicationarea, development team or  technique. e) All of the above.

Last Answer : e) All of the above.

Description : During project estimation, project manager estimates following A. project cost B. project duration C. project effort D. all of the above

Last Answer : D. all of the above

Description : In the project planning, which of the following is considered as the most basic parameter  based on which all other estimates are made? A. project size B. project effort C. project duration D. project schedule

Last Answer : A. project size

Description : PERT chart can be used to track the tasks of a project when task time estimates are  fairly uncertain.

Last Answer : Ans: True

Description : Estimates from the planning stage will need to be refined as the project progresses,  because it is virtually impossible to develop an exact assessment of the project’s schedule  before the analysis and design phases are conducted.

Last Answer : Ans: True

Description : One of the greatest weaknesses of systems consulting firms is that they try to apply  estimates and methodologies that they have developed over time and applied to other  projects, most of which are very different from the current project.

Last Answer : Ans: False

Description : You are a project manager for Move It Now trucking company. Your company specializes in moving household goods across the city or across the country. Your project involves upgrading the nationwide computer network for the ... the weighted average or expected value? A. 54 B. 66 C. 60 D. 30

Last Answer : C. 60

Description : The project schedule is used to determine all of the following except which one?  A. Cost estimates B. Activity start dates C. Float times D. Activity end dates

Last Answer : A. Cost estimates

Description : November 26, 1976, the trade name ________ was registered with the Office of the Secretary of the State of New Mexico by Bill Gates and Paul Allen. A. Micro-Soft B. IBM C. Apple D. Microsoft

Last Answer : ANSWER: D

Description : Following company banned four Lakeside students Bill Gates, Paul Allen, Ric Weiland, and Kent Evans when it caught them exploiting bugs in the operating system to obtain free computer time. A. IBM B. Computer Center Corporation (CCC) C. Computer Corner Center D. None of Above

Last Answer : ANSWER: B

Description : Paul Allen November 26, 1976, the trade name ________ was registered with the Office of the Secretary of the State of New Mexico by Bill Gates and Paul Allen. A. Micro-Soft B. IBM C. Apple D. Microsoft

Last Answer : ANSWER: D

Description : Microsoft November 26, 1976, the trade name ________ was registered with the Office of the Secretary of the State of New Mexico by Bill Gates and Paul Allen. A. Micro-Soft B. IBM C. Apple D. Microsoft

Last Answer : ANSWER: D

Description : Following company banned four Lakeside students Bill Gates, Paul Allen, Ric Weiland, and Kent Evans when it caught them exploiting bugs in the operating system to obtain free computer time. A. IBM B. Computer Center Corporation (CCC) C. Computer Corner Center D. None of Above

Last Answer : ANSWER: B

Description : November 26, 1976, the trade name ________ was registered with the Office of the Secretary of the State of New Mexico by Bill Gates and Paul Allen. A. Micro-Soft B. IBM C. Apple D. Microsoft

Last Answer : ANSWER: D

Description : Following company banned four Lakeside students Bill Gates, Paul Allen, Ric Weiland, and Kent Evans when it caught them exploiting bugs in the operating system to obtain free computer time. A. IBM B. Computer Center Corporation (CCC) C. Computer Corner Center D. None of Above

Last Answer : ANSWER: B

Description : Explain the development phases of the detailed COCOMO model.

Last Answer : Ans A software development is carried out in four successive phases, which are as follows: 1: plan/requirements: this is the first phase of the development cycle. The requirement is analyzed, the product ... product. This requires 16% to 34% of normal effort and 18% to 34% of the development time.

Description : Explain the development phases of the detailed COCOMO model.

Last Answer : Ans A software development is carried out in four successive phases, which are as follows: 1: plan/requirements: this is the first phase of the development cycle. The requirement is analyzed, the product ... product. This requires 16% to 34% of normal effort and 18% to 34% of the development time.

Description : Compare the basic COCOMO model with the detailed COCOMO model .

Last Answer : Ans. COCOMO consists of a hierarchy of three increasingly detailed and accurate forms. Basic COCOMO - is a static single-valued model that computes software development effort (and cost) as a ... cost driver's impact on each step (analysis, design, etc.) of the software engineering process.

Description : The model that assumes that effort and development time are functions of product size alone is (A) Basic COCOMO model (B) Intermediate COCOMO model (C) Detailed COCOMO model (D) All the three COCOMO models

Last Answer : (A) Basic COCOMO model

Description : A COCOMO model is (A) Common Cost Estimation Model. (B) Constructive Cost Estimation Model. (C) Complete Cost Estimation Model. (D) Comprehensive Cost Estimation Model.

Last Answer : (B) Constructive Cost Estimation Model.

Description : COCOMO stands for (A) COmposite COst MOdel (B) COnstructive COst MOdel (C) COnstructive COmposite MOdel (D) COmprehensive COnstruction MOdel

Last Answer : (B) COnstructive COst MOdel Explanation: The Constructive Cost Model (COCOMO) is an algorithmic software cost estimation model.

Description :  We can accurately estimate lines of code from the problem specification. A. True B. False C. NA D. NA

Last Answer : B. False

Description : Lines of Code measures the size of project by counting A. the number of source instructions B. the comments in the code C. the header lines D. All of the above

Last Answer : A. the number of source instructions

Description : Science bases its estimation of the size of a product on a) Files (Fi), Flows (Fl) and Processes (Pr) b) Lines of Code (kLOC) c) Function Points (FP) d) operands and operators e) Feature Points (FeP).

Last Answer : d) operands and operators

Description : Problems with using Lines of Code to measure the size of a product include(s) a) The creation of source code is only part of the development effort b) The Lines of Code (LOC) will differ between ... The final size (kLOC) can only be determined once the product is delivered e) All of the above.

Last Answer : e) All of the above.

Description : Assume a systems development project effort calculation determines that the system  will require 240 function points. If the developers choose to implement this system in the  C programming language, approximately ... without more information  c. exactly the same  d. much greater  e. much less

Last Answer : e. much less

Description : RUP stands for created by a division of a) Rational Unified Program, IBM b) Rational Unified Process, Infosys c) Rational Unified Process, Microsoft d) Rational Unified Process, IBM

Last Answer : d) Rational Unified Process, IBM

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : Which is a configuration management concept that helps us to  control change without seriously impeding justifiable change? a) Baselines b) Source code c) Data model d) None of the mentioned

Last Answer : a) Baselines

Description : To complete a 20 person-month project in 10 months, a team should have 4 full-time  staff members assigned to the project.

Last Answer : Ans: False

Description : Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for A. Unexpected large scale infiltration of stream water B. Unexpected increase in the population C. Under estimates of maximum and average flows D. All of the above

Last Answer : ANS: D

Description : The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to ... ) 25 person months (B) 75 person months (C) 62.5 person months (D) 72.5 person months

Last Answer : (C) 62.5 person months 

Description : Unlike traditional Work Breakdown Structures (WBS), evolutionary WBSs are  a. organized in a standard manner across all projects  b. created in an iterative and incremental manner  c. designed so one can compare the current project to past projects  d. all of the above  e. none of the above

Last Answer : d. all of the above

Description : Could obese and ”metabolically challenged” people use the case of Anita Albrecht to get themselves classified as fit and healthy?

Last Answer : No because obesity is really a body fat percentage issue. Bmi is not the best indicator

Description : Alex Albrecht vs Kevin Rose?

Last Answer : Alex has one of the most annoying voices on the planet. And Kevin Rose is a douche.

Description : What is Albrecht Durer's middle name?

Last Answer : No middle name.

Description : What is Albrecht Durer's middle name?

Last Answer : No middle name.

Description : Function oriented metrics were first proposed by ? John Gaffney Albrecht Basili

Last Answer : Albrec

Description : Petri is working for Nokia in Finland. He has completed 10 months of his 12-month project, budgeted at $800,000. His earned value analysis shows that variance at  completion is $75,000. What is the estimate at completion value ... : a. 725,000 b. -725,000 c. -$875,000 d. $875,000 e. $800,000

Last Answer : d. $875,000

Description : Your firm has a philosophy that is analogous to the hedging (maturity matching) approach. Which of the following is the most appropriate non-spontaneous form for financing the excess seasonal current asset needs? ... credit. B. 6-month bank notes. C. Accounts payable. D. Common stock equity.

Last Answer : B. 6-month bank notes.

Description : Your firm has a philosophy that is analogous to the hedging (maturity matching) approach. Which of the following is the most appropriate form for financing a new capital investme nt in plant and equipment? A. Trade credit. B. 6-month bank notes. C. Accounts payable. D. Common stock  equity

Last Answer : D. Common stock  equity. 

Description : What network model enables engineer managers to schedule, monitor and control large and complex projects by employing three time estimates per activity a. Forecasting b. Program evaluation review technique c. Critical path method d. simulation

Last Answer : b. Program evaluation review technique

Description : An Organizational Breakdown Structure (OBS) is used to identify: a. the reporting structure and current availability of all individuals in the project. b. technical ability and line of communication ... . d. the reporting structure and lines of communication for all individuals in the projects.

Last Answer : d. the reporting structure and lines of communication for all individuals in the projects.