Which model is used during early stages of the system 

design afterthe requirements have been established?

a) An application-composition model

b) A post-architecture model

c) A reuse model

d) An early design model

1 Answer

Answer :

d) An early design model

Related questions

Description : Which model assumes that systems are created fromreusable  components, scripting or database programming? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : a) An application-composition model

Description : Which model is used to compute the effort required to  integrate reusable components or program code that is  automatically generated by design or program translation  tools? a) An application-composition model b) A post-architecture model c) A reuse model d) An early design model

Last Answer : c) A reuse model

Description : Project managers can develop task lists for a project with the help of _____.  a. established methodologies  b. system proposals  c. system requests  d. user application hardware  e. user requirements

Last Answer : a. established methodologies

Description : The COCOMO model takes into account different approaches to development, reuse, etc. a) True b) False

Last Answer : b) False

Description : The life cycle can be said to consist of a series of phases. The  classical model is referred to as the waterfall model. Which phase  may be defined as The concept is explored and refined, ... client's requirements are elicited? (a) Requirements (b) Specification (c) Design d) Implementation

Last Answer : (a) Requirements

Description : In which of the following stages are project objectives established, teams formed, and  major responsibilities assigned?  A. Conceptualizing  B. Defining (Ans.) C. Planning  D. Executing

Last Answer : B. Defining (Ans.)

Description : Engineering: a) Is a set of rules about developing products b) Has been around as a discipline since the early 50's c) Started as a response to the so-called Crisis' of the ... with all the  aspects of production e) Is now a mature discipline on par with other established  engineeringfields

Last Answer : d) Is an engineering discipline concerned with all the  aspects of production

Description : According to the Project Management Institute (PMI), project  management is defined as the application of knowledge, _____, _____, and  techniques to project activities to meet the project requirements . Select ... b. tools, analysis c. analysis, theories d. skills, tools e. skills, theories

Last Answer : d. skills, tools

Description : Traditional Work Breakdown Structures tend to  a. focus on the design of the system as oppose to the needs of the current phase and  iteration  b. force too many levels of detail early on for large ... project and difficult to compare across projects  d. all of the above  e. none of the above

Last Answer : d. all of the above

Description : For the best model suitable for the project, in which of the phase  the developers decide a roadmap for project plan? a. Design b. System Analysis c. Coding d. Testing

Last Answer : b. System Analysis

Description : Identify which technique will not help a company to optimise its working capital cycle. A. Offering discounts for early payment by debtors B. Using cash management models to optimise the level of ... order quantity model to stock management E. Adopting the use of just-in-time stock management

Last Answer : B. Using cash management models to optimise the level of cash held

Description : Arrange the following steps to form a basic Engineering  Process Model. i. Test ii. Design iii. Install iv. Specification v. Manufacture vi. Maintain a) 2, 4, 5, 1, 6, 3 b) 4, 2, 5, 1, 3, 6 c) 2, 4, 5, 1, 3, 6 d) 4, 2, 5, 1, 6, 3

Last Answer : a) 2, 4, 5, 1, 6, 3

Description : Phosphatic fertilisers (A) Are useful during early stage of the plant growth (B) Accelerate fruit formation in later stages of growth (C) Lessen the effect of excessive nitrogen application (D) None of these

Last Answer : (B) Accelerate fruit formation in later stages of growth

Description : Which two requirements are given priority during Requirement  Management of a product ? a) User and Developer b) Functional and Non-functional c) Enduring and Volatile

Last Answer : c) Enduring and Volatile

Description : Which of the following is not fixed by the process requirements, in the design of absorbers? (A) Flow rate of the entering gas (B) Composition of the entering liquid (C) Terminal concentrations of gas stream (D) None of these

Last Answer : (D) None of these

Description : The entire process of a project may be considered to be made upon a number of sub- processes placed in different stages called the Work Breakdown Structure. (True/False)

Last Answer : Ans. True

Description : Mark the incorrect option: (A) The special registration envelopes provided by the Post Office cannot be used for the transmission of unregistered article (B) Reuse of a stamp that has already ... have been cut and separated from embossed envelopes or postcards can be used in payment of postage

Last Answer : (D) Postage stamps which have been cut and separated from embossed envelopes or postcards can be used in payment of postage

Description : The evolutionary Work Breakdown Structure approach is very useful when the  requirements of the system are not well understood.

Last Answer : Ans: True

Description : The traditional Work Breakdown Structure approach is very useful when the  requirements of the system are not well understood.

Last Answer : Ans: False

Description : Quality control in the final analysis is : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements  2. a production system  3. an inspection system  4. fitness for purpose

Last Answer : 1. using the technical procedures of monitoring project results to decide if the outputs meet  the requirements

Description : extendible architecture is A. Modular design of a software application that facilitates the integration of new modules B. Showing a universal law or rule to be invalid by providing a counter example C. ... of attributes in a database table that refers to data in another table D. None of these

Last Answer : A. Modular design of a software application that facilitates the integration of new modules

Description : Upper CASE tools are used to create diagrams and generate code for database tables  system functionality during the design phase.

Last Answer : Ans: False

Description : Fruit and leaf drop at early stages can be prevented by the application of (a) ethylene (b) auxins (c) gibberellic acid (d) cytokinins.

Last Answer : (b) auxins

Description : Fruit and leaf drop at early stages can be prevented by the application of: (1) Ethylene (2) Auxins (3) Gibberellic acid (4) Cytokinins

Last Answer : (2) Auxins

Description : Which one of the following statements is true? a. An increase in project scope is likely to increase project cost. b. A decrease in the project time is likely to increase project quality. c. ... to decrease project cost. d. A decrease in the project cost is likely to decrease project time.

Last Answer : a. An increase in project scope is likely to increase project cost.

Description : Which one of the following statements is true? a. Independent reviews and quality audits form part of quality assurance to ensure the project manager delivers on time and to budget. ... Quality planning enables the project manager to manage the trade-off between customer expectations  and budget

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for purpose and  meet stakeholder expectations.

Description :  Which of the following is the most important element of Project Management Plan that is useful in HR Planning process: A. Risk Management activities B. Quality Assurance activities C. Activity Resource requirements D. Budget Control activities

Last Answer : C. Activity Resource requirements

Description : Which of the following project baselines provides the basis for measurement of  the expected cash flow against requirements over time and is often displayed as an  S curve? Select one: a. Schedule baseline b. Cost performance baseline c. Scope baseline d. Plan baseline e. Initiation baseline

Last Answer : b. Cost performance baseline

Description : Complete the following statement. As a project manager, Darrell is  excited that he is assigned to be in charge of the most important project  this year. After being chartered for the project, he ... c. prepare for the template to monitor project progress. d. estimate the entire project budget.

Last Answer : b. start to define and develop the stakeholder needs and requirements

Description : According to a statistical report: over 30% of all projects are cancelled before completion and over 70% of the remainder fail to deliver expected features . What must be the reason for such ... change management b) Poor requirements management c) Poor quality control d) All of the mentioned

Last Answer : b) Poor requirements management

Description : Requirements Management is a prerequisite for Quality-Oriented  Development. a) True b) False

Last Answer : a) True

Description : Why is Requirements Management Important ? It is due to the changes a) to the environment b) in technology c) in customer’s expectations d) in all of the mentioned.

Last Answer : d) in all of the mentioned.

Description : Requirements Management has a high initial start-up cost but  does not need ongoing funding throughout a project. a) True b) False

Last Answer : b) False

Description : Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management. a) True b) False

Last Answer : a) True

Description : The chain of the activities is based on ……………………. a. technical requirements b. not on management concern c. both a, b d. none of the above

Last Answer : c. both a, b

Description : The chain of the activities is based on technical requirements, not on management................................... a) True b) False

Last Answer : a) True

Description : As a PMP, you will be required to comply with the PMP Code of Professional  Conduct. This code refers to all of the following except which one?  A. Reporting conflicts of interest ... C. Complying with the stakeholder requirements D. Complying with the rules and standards of foreign countries

Last Answer : C. Complying with the stakeholder requirements

Description : Earned value management integrates scope, cost, and schedule measures to:  A. assess project performance and progress.  B. develop a preliminary budget. C. assess communication effectiveness among project team members. D. assess whether all requirements were met.

Last Answer : A. assess project performance and progress.

Description : The network diagram is the best tool for demonstrating:  A. Schedule variances B. Resource requirements C. The sequence of project activities  D. Schedule performance over time

Last Answer : C. The sequence of project activities

Description : Which one of the following statements is true?  a. An increase in project scope is likely to increase project cost.  b. A decrease in the project time is likely to increase project quality.  c. ... to decrease project cost.  d. A decrease in the project cost is likely to decrease project time.

Last Answer : a. An increase in project scope is likely to increase project cost.

Description : Which one of the following statements is true?  a. Independent reviews and quality audits form part of quality assurance to ensure the project  manager delivers on time and to budget. ... planning enables the project manager to manage the trade-off between customer  expectations and budget.

Last Answer : c. Quality control verifies that the project deliverables conform to specification, are fit for  purpose and meet stakeholder expectations.

Description : On a project the project manager should strive for a "Quality Level" that : 1. is the highest level possible  2. is as close to the project objectives as possible  3. represents the least cost to the project.  4. Exceeds the specified requirements of the project.

Last Answer : 2. is as close to the project objectives as possible

Description : )Resource leveling attempts to : 1. Reduce resource requirements by smoothing out period-to period resource assignments.  2. Ensure that the budget abnormalities are overcome. 3. Reduce the ... Increase the amount of the project manager's authority so that budget dollars can be  appropriated.

Last Answer : 1. Reduce resource requirements by smoothing out period-to period resource assignments.

Description : The amount of current assets that varies with seasonal requirements is referred to as  working capital. A. permanent B. net C. temporary D. gross

Last Answer : C. temporary

Description : . An important aim of a post-project review is to: a. validate overall progress to date against the budget and schedule. b. capture learning and document it for future usage. c. ... of all permanent documentation, signed by the sponsor. d. establish that project benefits have been identified.

Last Answer : b. capture learning and document it for future usage.

Description : An important aim of a post-project review is to:  a. validate overall progress to date against the budget and schedule.  b. capture learning and document it for future usage.  c. ... of all permanent documentation, signed by the sponsor.  d. establish that project benefits have been identified

Last Answer : b. capture learning and document it for future usage.

Description : The RUP is normally described from three perspectives- dynamic, static& practice. What does static perspective do? a) It shows the process activities that are enacted. b) It suggests good practices to be used during the process. c) It shows the phases of the model over time.

Last Answer : a) It shows the process activities that are enacted.

Description : Which technique is applicable when other projects in the same analogy application domain have been completed? a) Algorithmic cost modelling b) Expert judgement c) Estimation by analogy d) Parkinson’s Law

Last Answer : c) Estimation by analogy

Description : Describe the various steps of the reuse-oriented model.

Last Answer : Ans. The reuse-oriented model, also called reuse-oriented development (ROD), is a method of software development in which a program is refined by producing a sequence of prototypes called models, each ... requirements, resulting in a product that does not fully meet the needs of its intended users.